DubaiData

Azizi Central

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Azizi Central is a project by Azizi Developments L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 87 sales registered in the trailing 12 months at a median AED 1.57M (1 171 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.57M -3.2%
IQR AED 1.45M – AED 1.68M
DLD verified
Median price per sqft
AED 1 171/sqft -4.4%
IQR 1 130 – 1 259 AED/sqft
DLD verified
Registered sales
87 +480.0%
all property types · trailing 12 complete months
DLD verified
Off-plan share
71.3%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 87 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperAzizi Developments L.L.C DLD verified
StatusFinished DLD verified
Construction progress100% — at the last DLD inspection DLD verified
Registered with DLD29 Dec 2023 DLD verified
Construction started3 Aug 2023 DLD verified
Units in the project97 DLD verified
Project area12 474 sqm DLD verified
Escrow agentAbu Dhabi Commercial Bank DLD verified
Project number2721 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 2001 4001 600Aug 2024Nov 2024Feb 2025May 2025Aug 2025Nov 2025Feb 2026May 2026Aug 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 7 technical inspections for this project, from 31 Jul 2023 at 0.0% to 8 Jun 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%2023-07-312026-06-08

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
8 Jun 2026100.0% +21.4 pp
27 Jan 202678.6% +15.7 pp
27 Oct 202562.9% +4.6 pp
3 Jul 202558.3% +15.5 pp
6 Feb 202542.8% +27.7 pp
22 Oct 202415.1% +15.1 pp
31 Jul 20230.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Sep 20266 AED 1.61M1 261 1 257 – 1 278
Aug 202619 AED 1.50M1 143 1 105 – 1 178
Jul 20260 —— —
Jun 202620 AED 1.59M1 205 1 131 – 1 296
May 202622 AED 1.61M1 169 1 105 – 1 205
Apr 20261 —— —
Mar 20261 —— —
Feb 20264 —— —
Jan 20266 AED 1.66M1 173 1 162 – 1 203
Dec 20250 —— —
Nov 20255 AED 1.44M1 132 1 131 – 1 146
Oct 20253 —— —
Sep 20256 AED 1.86M1 197 1 174 – 1 232

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (5) 5AED 1.05M 1 351 776 sqft — —
2-bedroom apartments 69AED 1.52M 1 163 1 285 sqft — —
3-bedroom apartments low sample (13) 13AED 2.18M 1 223 1 802 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

02550752017202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202679AED 1.57M 1 174AED 127.31M
202522AED 1.63M 1 182AED 37.89M
20246AED 1.07M 1 396AED 6.87M
20171— —AED 20.88M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
30 Sep 20262 B/R Flat — Azizi CentralReady 1 293 sqftAED 1 630 000 1 260
30 Sep 20261 B/R Flat — Azizi CentralReady 776 sqftAED 980 000 1 262
22 Sep 20262 B/R Flat — Azizi Central Ready 1 274 sqftAED 1 600 000 1 256
21 Sep 20262 B/R Flat — Azizi Central Ready 1 285 sqftAED 1 454 350 1 132
10 Sep 20262 B/R Flat — Azizi Central Ready 1 284 sqftAED 1 680 000 1 308
4 Sep 20262 B/R Flat — Azizi Central Ready 1 364 sqftAED 1 750 000 1 283
31 Aug 20262 B/R Flat — Azizi Central Ready 1 273 sqftAED 1 530 000 1 202
26 Aug 20262 B/R Flat — Azizi Central Ready 1 273 sqftAED 1 420 130 1 115
24 Aug 20262 B/R Flat — Azizi Central Ready 1 293 sqftAED 1 407 000 1 088
24 Aug 20262 B/R Flat — Azizi Central Ready 1 282 sqftAED 1 500 000 1 170
21 Aug 20263 B/R Flat — Azizi Central Ready 1 656 sqftAED 1 873 940 1 131
19 Aug 20262 B/R Flat — Azizi Central Ready 1 284 sqftAED 1 405 320 1 095

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Al Furjan

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Azizi Central — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/azizi-central/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Azizi Central. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.