Azizi Zain
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Azizi Zain is a project by Azizi Developments L.L.C, recorded at 66% complete at its last Dubai Land Department inspection. 81 sales registered in the trailing 12 months at a median AED 1.51M (1 167 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 81 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Azizi Developments L.L.C | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 66% — at the last DLD inspection | DLD verified |
| Registered with DLD | 19 Nov 2024 | DLD verified |
| Construction started | 11 Oct 2024 | DLD verified |
| Declared completion | 11 Oct 2027 — registry date, not a handover promise | DLD verified |
| Units in the project | 115 | DLD verified |
| Project area | 14 133 sqm | DLD verified |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) | DLD verified |
| Project number | 3335 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2026: in the 2 months since, no month reached the five registered sales a median needs (5 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 5 technical inspections for this project, from 15 Oct 2024 at 0.0% to 30 Jun 2026 at 66.2%. Over the inspections since 30 May 2025 it moved 2.86 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 30 Jun 2026 | 66.2% | +12.8 pp |
| 28 Jan 2026 | 53.4% | +12.9 pp |
| 22 Oct 2025 | 40.5% | +11.5 pp |
| 30 May 2025 | 29.0% | +29.0 pp |
| 15 Oct 2024 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2026 | 24 | AED 1.51M | 1 193 | 1 142 – 1 285 |
| Jun 2026 | 13 | AED 1.52M | 1 180 | 1 132 – 1 287 |
| May 2026 | 5 | AED 1.45M | 1 165 | 1 144 – 1 168 |
| Apr 2026 | 0 | — | — | — |
| Mar 2026 | 5 | AED 1.51M | 1 174 | 1 134 – 1 189 |
| Feb 2026 | 4 | — | — | — |
| Jan 2026 | 7 | AED 1.51M | 1 160 | 1 129 – 1 208 |
| Dec 2025 | 9 | AED 1.51M | 1 151 | 1 113 – 1 280 |
| Nov 2025 | 8 | AED 1.62M | 1 141 | 1 129 – 1 153 |
| Oct 2025 | 1 | — | — | — |
| Sep 2025 | 8 | AED 1.64M | 1 147 | 1 142 – 1 197 |
| Aug 2025 | 3 | — | — | — |
| Jul 2025 | 6 | AED 1.58M | 1 278 | 1 154 – 1 324 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (9) | 9 | AED 1.03M | 1 287 | 818 sqft | — | — |
| 2-bedroom apartments | 60 | AED 1.51M | 1 153 | 1 304 sqft | — | — |
| 3-bedroom apartments low sample (12) | 12 | AED 2.02M | 1 269 | 1 777 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 63 | AED 1.51M | 1 173 | AED 98.01M |
| 2025 | 45 | AED 1.59M | 1 195 | AED 71.53M |
| 2024 | 2 | — | — | AED 3.90M |
| 2017 | 1 | — | — | AED 26.09M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 30 Sep 2026 | 2 B/R Flat — AZIZI ZAIN | Off-plan | 1 834 sqft | AED 1 792 560 | 978 |
| 30 Sep 2026 | 2 B/R Flat — AZIZI ZAIN | Off-plan | 1 305 sqft | AED 1 493 790 | 1 145 |
| 1 Sep 2026 | 2 B/R Flat — AZIZI ZAIN | Off-plan | 1 387 sqft | AED 1 680 800 | 1 212 |
| 18 Aug 2026 | 2 B/R Flat — AZIZI ZAIN | Off-plan | 1 287 sqft | AED 1 718 000 | 1 335 |
| 3 Aug 2026 | 2 B/R Flat — AZIZI ZAIN | Off-plan | 1 304 sqft | AED 1 475 760 | 1 132 |
| 30 Jul 2026 | 2 B/R Flat — AZIZI ZAIN | Off-plan | 1 387 sqft | AED 1 686 080 | 1 216 |
| 30 Jul 2026 | 2 B/R Flat — AZIZI ZAIN | Off-plan | 1 702 sqft | AED 1 651 700 | 971 |
| 30 Jul 2026 | 2 B/R Flat — AZIZI ZAIN | Off-plan | 1 370 sqft | AED 1 767 000 | 1 290 |
| 30 Jul 2026 | 2 B/R Flat — AZIZI ZAIN | Off-plan | 1 387 sqft | AED 1 650 340 | 1 190 |
| 30 Jul 2026 | 2 B/R Flat — AZIZI ZAIN | Off-plan | 1 331 sqft | AED 1 768 900 | 1 329 |
| 30 Jul 2026 | 1 B/R Flat — AZIZI ZAIN | Off-plan | 818 sqft | AED 1 058 340 | 1 294 |
| 30 Jul 2026 | 2 B/R Flat — AZIZI ZAIN | Off-plan | 1 331 sqft | AED 1 461 240 | 1 097 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Al Furjan
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Azizi Zain — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/azizi-zain/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Azizi Zain. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.