Data Dubai

Azizi Riviera 15

Azizi Riviera 15Finished100% built251 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Azizi Riviera 15: ChatGPT · Claude · Perplexity

Azizi Riviera 15 is a project by Azizi Developments L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 12 sales registered in the trailing 12 months at a median AED 725k (1 876 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 725k +0.7% y/y
≈ US$ 197k · typical range AED 642k – AED 972k
DLD verified
Median price per sqft
AED 1 876/sqft -0.2% y/y
typical range 1 633 – 1 933 AED/sqft
DLD verified
Registered sales
12 -55.6% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 12 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAzizi Developments L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD27 Sep 2017
Construction started1 Oct 2017
Declared completion14 Jul 2023 — registry date, not a handover promise
Units in the project251
Project area11 063 sqm
Escrow agentAjman Bank /P.J.S.C
Project number1975

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Apr 2024: in the 30 months since, no month reached the five registered sales a median needs (46 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 9 technical inspections for this project, from 25 Oct 2018 at 20.1% to 14 Jul 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2023-07-142018-10-252023-07-14

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
14 Jul 2023100.0% +19.4 pp
17 Feb 202280.6% +9.5 pp
1 Sep 202171.1% +10.6 pp
5 Apr 202160.5% +12.0 pp
11 Nov 202048.5% +3.5 pp
14 Jul 202045.0% +5.0 pp
17 Feb 202040.0% +2.4 pp
15 Jan 202037.6% +17.5 pp
25 Oct 201820.1% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios low sample (8) 8AED 665k 1 905 361 sqft — —
1-bedroom apartments insufficient data 2— — — — —
3-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
9 Nov 2026Studio FlatReady 177 sqftAED 275 000 1 556
22 Oct 2026Studio FlatReady 300 sqftAED 580 000 1 933
22 Oct 2026Studio FlatReady 300 sqftAED 580 000 1 933
3 Aug 20261 B/R FlatReady 574 sqftAED 1 100 000 1 918
13 May 2026Studio FlatReady 469 sqftAED 750 000 1 600
21 Apr 20263 B/R FlatReady 1 794 sqftAED 2 701 204 1 505
20 Apr 2026Studio FlatReady 368 sqftAED 590 000 1 604
17 Apr 20261 B/R FlatReady 530 sqftAED 930 000 1 754
27 Feb 2026Studio FlatReady 400 sqftAED 750 000 1 876
2 Feb 2026Studio FlatReady 330 sqftAED 660 000 2 001
12 Jan 2026ShopReady 350 sqftAED 1 250 000 —
12 Dec 2025Studio FlatReady 403 sqftAED 670 000 1 663
7 Nov 2025Studio FlatReady 355 sqftAED 700 000 1 973

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Azizi Riviera 15: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

050100150201720182019202020212022202320242025202605010015020182020202220242026

registered sales per calendar year; the current year is incomplete

By month

024MayJunJulAugSepOctNovDecJanFebMarApr024JunAugOctDecFebApr

registered sales per month, May 2024 – Apr 2025

YearSalesMedian priceMedian AED/sqftTotal registered value
202610AED 750k 1 876AED 9.89M
202523AED 700k 1 840AED 18.01M
202435AED 662k 1 618AED 26.74M
2023145AED 561k 1 462AED 105.41M
202211AED 564k 1 433AED 7.01M
202113AED 554k 1 392AED 8.30M
20207AED 544k 1 201AED 6.62M
201910AED 540k 1 474AED 5.55M
201856AED 530k 1 475AED 33.28M
20177AED 647k 1 364AED 28.65M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2024–2026

Median annual rent, AED thousand
YearStudio1-bed flatGross yield
2026 YTD 50k70k—
2025 50k75k—
2024 46k72k7.75%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Apr 20248 AED 483k1 487 1 467 – 1 494
Mar 20243 —— —
Feb 20244 —— —
Jan 20241 —— —
Dec 20234 —— —
Nov 20231 —— —
Oct 20238 AED 541k1 463 1 347 – 1 540
Sep 2023107 AED 555k1 462 1 341 – 1 511
Aug 20234 —— —
Jul 20236 AED 718k1 456 1 367 – 1 548

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 12 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Azizi Riviera 15. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Azizi Riviera 18
Finished · Azizi Developments L.L.C
40 m100%282
Azizi Riviera 13
Finished · Azizi Developments L.L.C
96 m100%234
Azizi Riviera 6
Finished · Azizi Developments L.L.C
101 m100%160
Azizi Riviera 4
Finished · Azizi Developments L.L.C
102 m100%212
Azizi Riviera 5
Finished · Azizi Developments L.L.C
121 m100%221
Azizi Riviera 16
Finished · Azizi Developments L.L.C
121 m100%262
Azizi Riviera 17
Finished · Azizi Developments L.L.C
126 m100%211
Azizi Riviera 7
Finished · Azizi Developments L.L.C
145 m100%158
Azizi Riviera 14
Finished · Azizi Developments L.L.C
157 m100%228
Azizi Riviera 12
Finished · Azizi Developments L.L.C
162 m100%135

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Meydan One Community

Questions about Azizi Riviera 15

Who is the developer of Azizi Riviera 15?

The Dubai Land Department project registry lists Azizi Developments L.L.C as the developer of Azizi Riviera 15.

Is Azizi Riviera 15 completed?

The DLD registry status of Azizi Riviera 15 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 14 Jul 2023 — a registry date, not a handover promise.

How many homes are in Azizi Riviera 15?

The DLD registry records 251 units in Azizi Riviera 15.

What is the price per square foot in Azizi Riviera 15?

Over the last 12 complete months the median registered sale in Azizi Riviera 15 was AED 725k, or AED 1 876 per sqft, from 12 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Azizi Riviera 15?

The escrow agent recorded by DLD for Azizi Riviera 15 is Ajman Bank /P.J.S.C.

Where is Azizi Riviera 15?

Azizi Riviera 15 is in the Meydan One Community community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Azizi Riviera 18, about 40 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Azizi Riviera 15 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/azizi-riviera-15/”. Reuse is permitted with attribution.