Data Dubai

Azizi Riviera 35

Azizi Riviera 35Finished100% built252 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Azizi Riviera 35: ChatGPT · Claude · Perplexity

Azizi Riviera 35 is a project by Azizi Developments L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 10 sales registered in the trailing 12 months at a median AED 705k (1 876 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 705k -23.4% y/y
≈ US$ 192k · typical range AED 662k – AED 841k
DLD verified
Median price per sqft
AED 1 876/sqft -1.0% y/y
typical range 1 694 – 2 164 AED/sqft
DLD verified
Registered sales
10 -67.7% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 10 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAzizi Developments L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD29 Mar 2018
Construction started1 Oct 2017
Declared completion14 Sep 2023 — registry date, not a handover promise
Units in the project252
Project area10 910 sqm
Escrow agentAbu Dhabi Commercial Bank
Project number2041

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 2501 5001 7502 000Feb 2022Jul 2022Dec 2022May 2023Oct 2023Mar 2024Aug 2024Jan 2025Jun 2025Nov 20251 2501 5001 7502 000Feb 2022May 2023Aug 2024Nov 2025

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Dec 2024: in the 22 months since, no month reached the five registered sales a median needs (29 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 8 technical inspections for this project, from 5 Sep 2019 at 9.1% to 14 Sep 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2023-09-142019-09-052023-09-14

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
14 Sep 2023100.0% +25.1 pp
21 Jul 202274.9% +12.8 pp
12 Jan 202262.2% +1.4 pp
8 Sep 202160.7% +17.5 pp
7 Feb 202143.2% +26.4 pp
13 Feb 202016.8% +1.4 pp
9 Dec 201915.5% +6.3 pp
5 Sep 20199.1% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios low sample (8) 8AED 680k 1 920 338 sqft — —
1-bedroom apartments insufficient data 1— — — — —
2-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
10 Nov 20261 B/R FlatReady 1 568 sqftAED 2 072 288 1 322
9 Nov 2026Studio FlatReady 372 sqftAED 630 000 1 695
22 Jul 2026Studio FlatReady 322 sqftAED 845 540 2 626
7 Jul 20262 B/R FlatReady 880 sqftAED 1 525 000 1 733
18 Jun 2026Studio FlatReady 372 sqftAED 625 000 1 681
25 May 2026Studio FlatReady 354 sqftAED 670 000 1 891
15 May 2026Studio FlatReady 301 sqftAED 477 240 1 585
6 Feb 2026Studio FlatReady 317 sqftAED 828 120 2 614
29 Jan 2026Studio FlatReady 355 sqftAED 660 000 1 860
17 Dec 20251 B/R FlatReady 574 sqftAED 950 000 1 656
13 Nov 2025Studio FlatReady 322 sqftAED 720 000 2 236
13 Nov 2025Studio FlatReady 354 sqftAED 690 000 1 948

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Azizi Riviera 35: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

050100201820192021202220232024202520260501002019202220242026

registered sales per calendar year; the current year is incomplete

By month

024JanFebMarAprMayJunJulAugSepOctNovDec024FebAprJunAugOctDec

registered sales per month, Jan 2025 – Dec 2025

YearSalesMedian priceMedian AED/sqftTotal registered value
20267AED 670k 1 860AED 5.63M
202525AED 779k 1 881AED 26.39M
202448AED 700k 1 646AED 40.91M
2023125AED 608k 1 510AED 92.76M
202272AED 592k 1 477AED 50.45M
202122AED 539k 1 495AED 14.20M
201915AED 502k 1 529AED 7.90M
20186AED 695k 1 412AED 28.33M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2024–2026

Median annual rent, AED thousand
YearStudio1-bed flatGross yield
2026 YTD 48k72k—
2025 50k75k—
2024 46k73k7.59%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Dec 20245 AED 750k2 017 1 959 – 2 092
Nov 20244 —— —
Oct 20246 AED 838k1 566 1 543 – 1 636
Sep 20245 AED 620k1 693 1 435 – 1 867
Aug 20243 —— —
Jul 20243 —— —
Jun 20245 AED 600k1 646 1 614 – 1 761
May 20241 —— —
Apr 20244 —— —
Mar 20242 —— —
Feb 20249 AED 950k1 396 1 283 – 1 673
Jan 20241 —— —
Dec 20234 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 10 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Azizi Riviera 35. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Azizi Riviera 34
Finished · Azizi Developments L.L.C
124 m100%250
Azizi Riviera 32
Finished · Azizi Developments L.L.C
147 m100%247
Azizi Riviera 22
Finished · Azizi Developments L.L.C
197 m100%157
Azizi Riviera 23
Finished · Azizi Developments L.L.C
206 m100%248
Azizi Riviera 21
Finished · Azizi Developments L.L.C
222 m100%157
Azizi Riviera 19
Finished · Azizi Developments L.L.C
253 m100%207
Azizi Riviera 20
Finished · Azizi Developments L.L.C
273 m100%250
Azizi Riviera 37
Finished · Azizi Developments L.L.C
294 m100%241
Azizi Riviera 8
Finished · Azizi Developments L.L.C
340 m100%216
Azizi Riviera 38
Finished · Azizi Developments L.L.C
361 m100%161

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Meydan One Community

Questions about Azizi Riviera 35

Who is the developer of Azizi Riviera 35?

The Dubai Land Department project registry lists Azizi Developments L.L.C as the developer of Azizi Riviera 35.

Is Azizi Riviera 35 completed?

The DLD registry status of Azizi Riviera 35 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 14 Sep 2023 — a registry date, not a handover promise.

How many homes are in Azizi Riviera 35?

The DLD registry records 252 units in Azizi Riviera 35.

What is the price per square foot in Azizi Riviera 35?

Over the last 12 complete months the median registered sale in Azizi Riviera 35 was AED 705k, or AED 1 876 per sqft, from 10 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Azizi Riviera 35?

The escrow agent recorded by DLD for Azizi Riviera 35 is Abu Dhabi Commercial Bank.

Where is Azizi Riviera 35?

Azizi Riviera 35 is in the Meydan One Community community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Azizi Riviera 34, about 124 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Azizi Riviera 35 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/azizi-riviera-35/”. Reuse is permitted with attribution.