Azizi Riviera 39
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Azizi Riviera 39: ChatGPT · Claude · Perplexity
Azizi Riviera 39 is a project by Azizi Developments L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 15 sales registered in the trailing 12 months at a median AED 650k (1 891 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 15 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Azizi Developments L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 25 Dec 2018 |
| Construction started | 12 Dec 2018 |
| Declared completion | 4 Mar 2024 — registry date, not a handover promise |
| Units in the project | 171 |
| Project area | 8 800 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 2124 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Oct 2024: in the 24 months since, no month reached the five registered sales a median needs (35 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 8 technical inspections for this project, from 16 Dec 2019 at 9.4% to 4 Mar 2024 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 4 Mar 2024 | 100.0% | +10.0 pp |
| 10 May 2023 | 90.0% | +11.9 pp |
| 21 Nov 2022 | 78.2% | +11.9 pp |
| 29 Jun 2022 | 66.3% | +16.1 pp |
| 12 Jan 2022 | 50.2% | +9.0 pp |
| 30 Aug 2021 | 41.2% | +23.4 pp |
| 24 Dec 2020 | 17.7% | +8.3 pp |
| 16 Dec 2019 | 9.4% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (9) | 9 | AED 600k | 1 948 | 302 sqft | — | — |
| 1-bedroom apartments insufficient data | 3 | — | — | — | — | — |
| 2-bedroom apartments insufficient data | 3 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 6 Nov 2026 | Shop | Ready | 340 sqft | AED 641 784 | — |
| 14 Oct 2026 | 1 B/R Flat | Ready | 580 sqft | AED 1 440 240 | 2 484 |
| 29 Sep 2026 | Studio Flat | Ready | 293 sqft | AED 580 000 | 1 978 |
| 24 Sep 2026 | Studio Flat | Ready | 293 sqft | AED 499 000 | 1 702 |
| 28 Jul 2026 | Studio Flat | Ready | 293 sqft | AED 499 200 | 1 706 |
| 7 Jul 2026 | 2 B/R Flat | Ready | 899 sqft | AED 1 267 000 | 1 409 |
| 6 Apr 2026 | 1 B/R Flat | Ready | 581 sqft | AED 1 080 000 | 1 858 |
| 12 Feb 2026 | Studio Flat | Ready | 302 sqft | AED 807 350 | 2 670 |
| 2 Feb 2026 | Studio Flat | Ready | 422 sqft | AED 650 000 | 1 542 |
| 2 Feb 2026 | Studio Flat | Ready | 304 sqft | AED 600 000 | 1 975 |
| 30 Jan 2026 | 2 B/R Flat | Ready | 875 sqft | AED 572 000 | 654 |
| 22 Jan 2026 | 2 B/R Flat | Ready | 1 192 sqft | AED 2 000 000 | 1 678 |
| 24 Dec 2025 | Studio Flat | Ready | 329 sqft | AED 640 000 | 1 948 |
| 10 Dec 2025 | Studio Flat | Ready | 299 sqft | AED 900 000 | 3 007 |
| 27 Nov 2025 | 1 B/R Flat | Ready | 498 sqft | AED 1 036 058 | 2 080 |
| 3 Nov 2025 | Studio Flat | Ready | 317 sqft | AED 600 000 | 1 891 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Azizi Riviera 39: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2024 – Oct 2025
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 11 | AED 650k | 1 706 | AED 9.99M |
| 2025 | 21 | AED 900k | 2 015 | AED 21.82M |
| 2024 | 124 | AED 860k | 1 665 | AED 107.84M |
| 2023 | 31 | AED 1.38M | 1 598 | AED 62.31M |
| 2022 | 16 | AED 912k | 1 602 | AED 15.64M |
| 2021 | 18 | AED 933k | 1 625 | AED 18.32M |
| 2019 | 5 | AED 536k | 1 750 | AED 3.28M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2024–2026
| Year | Studio | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|---|
| 2026 YTD | 44k | 70k | 95k | — |
| 2025 | 48k | 74k | 105k | — |
| 2024 | 43k | 70k | 95k | 7.90% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Oct 2024 | 5 | AED 689k | 1 841 | 1 737 – 2 116 |
| Sep 2024 | 4 | — | — | — |
| Aug 2024 | 12 | AED 544k | 1 810 | 1 699 – 1 837 |
| Jul 2024 | 6 | AED 672k | 1 641 | 1 610 – 1 666 |
| Jun 2024 | 47 | AED 562k | 1 659 | 1 609 – 1 749 |
| May 2024 | 32 | AED 1.20M | 1 595 | 1 546 – 1 695 |
| Apr 2024 | 3 | — | — | — |
| Mar 2024 | 1 | — | — | — |
| Feb 2024 | 3 | — | — | — |
| Jan 2024 | 2 | — | — | — |
| Dec 2023 | 8 | AED 1.38M | 1 617 | 1 614 – 1 627 |
| Nov 2023 | 2 | — | — | — |
| Oct 2023 | 2 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 15 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Meydan One Community
Questions about Azizi Riviera 39
Who is the developer of Azizi Riviera 39?
The Dubai Land Department project registry lists Azizi Developments L.L.C as the developer of Azizi Riviera 39.
Is Azizi Riviera 39 completed?
The DLD registry status of Azizi Riviera 39 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 4 Mar 2024 — a registry date, not a handover promise.
How many homes are in Azizi Riviera 39?
The DLD registry records 171 units in Azizi Riviera 39.
What is the price per square foot in Azizi Riviera 39?
Over the last 12 complete months the median registered sale in Azizi Riviera 39 was AED 650k, or AED 1 891 per sqft, from 15 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Azizi Riviera 39?
The escrow agent recorded by DLD for Azizi Riviera 39 is Abu Dhabi Commercial Bank.
Where is Azizi Riviera 39?
Azizi Riviera 39 is in the Meydan One Community community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗