Azizi Riviera 41
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Azizi Riviera 41: ChatGPT · Claude · Perplexity
Azizi Riviera 41 is a project by Azizi Developments L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 25 sales registered in the trailing 12 months at a median AED 660k (1 937 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 25 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Azizi Developments L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 4 Mar 2022 |
| Construction started | 23 Nov 2020 |
| Declared completion | 18 Jan 2024 — registry date, not a handover promise |
| Units in the project | 248 |
| Project area | 9 760 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 2343 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2026: in the 1 months since, there were no registered sales at all, so no month reached the five registered sales a median needs · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 5 technical inspections for this project, from 27 Dec 2021 at 38.6% to 18 Jan 2024 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 18 Jan 2024 | 100.0% | +4.9 pp |
| 31 Aug 2023 | 95.1% | +27.9 pp |
| 27 Oct 2022 | 67.2% | +5.0 pp |
| 17 Aug 2022 | 62.2% | +23.6 pp |
| 27 Dec 2021 | 38.6% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (18) | 18 | AED 640k | 1 946 | 331 sqft | — | — |
| 1-bedroom apartments low sample (6) | 6 | AED 1.06M | 1 887 | 539 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 2 Nov 2026 | 1 B/R Flat | Ready | 583 sqft | AED 1 457 347 | 2 500 |
| 25 Sep 2026 | 1 B/R Flat | Ready | 581 sqft | AED 1 500 130 | 2 584 |
| 24 Sep 2026 | Studio Flat | Ready | 313 sqft | AED 553 575 | 1 771 |
| 17 Sep 2026 | 1 B/R Flat | Ready | 534 sqft | AED 964 801 | 1 806 |
| 10 Sep 2026 | Studio Flat | Ready | 340 sqft | AED 600 000 | 1 766 |
| 9 Sep 2026 | Studio Flat | Ready | 315 sqft | AED 600 000 | 1 907 |
| 21 Aug 2026 | 1 B/R Flat | Ready | 534 sqft | AED 900 000 | 1 685 |
| 24 Jul 2026 | Studio Flat | Ready | 317 sqft | AED 620 000 | 1 957 |
| 22 Jul 2026 | 1 B/R Flat | Ready | 534 sqft | AED 1 311 190 | 2 454 |
| 16 Jul 2026 | Studio Flat | Ready | 315 sqft | AED 620 000 | 1 970 |
| 7 Jul 2026 | Studio Flat | Ready | 317 sqft | AED 650 000 | 2 051 |
| 12 May 2026 | Studio Flat | Ready | 332 sqft | AED 610 000 | 1 839 |
| 5 May 2026 | Studio Flat | Ready | 332 sqft | AED 615 000 | 1 854 |
| 30 Mar 2026 | Studio Flat | Ready | 313 sqft | AED 650 000 | 2 079 |
| 24 Feb 2026 | Studio Flat | Ready | 312 sqft | AED 750 000 | 2 400 |
| 3 Feb 2026 | 1 B/R Flat | Ready | 583 sqft | AED 1 075 000 | 1 844 |
| 21 Jan 2026 | Shop | Ready | 472 sqft | AED 2 349 919 | — |
| 9 Jan 2026 | Studio Flat | Ready | 331 sqft | AED 630 000 | 1 905 |
| 31 Dec 2025 | Studio Flat | Ready | 423 sqft | AED 680 000 | 1 608 |
| 11 Dec 2025 | 1 B/R Flat | Ready | 544 sqft | AED 1 050 000 | 1 931 |
| 10 Dec 2025 | Studio Flat | Ready | 331 sqft | AED 670 000 | 2 026 |
| 27 Nov 2025 | Studio Flat | Ready | 333 sqft | AED 650 000 | 1 950 |
| 17 Nov 2025 | Studio Flat | Ready | 332 sqft | AED 615 000 | 1 854 |
| 13 Nov 2025 | Studio Flat | Ready | 319 sqft | AED 670 000 | 2 100 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Azizi Riviera 41: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 17 | AED 650k | 1 906 | AED 15.00M |
| 2025 | 31 | AED 660k | 1 946 | AED 26.40M |
| 2024 | 189 | AED 588k | 1 799 | AED 138.21M |
| 2023 | 22 | AED 588k | 1 794 | AED 12.99M |
| 2022 | 59 | AED 904k | 1 701 | AED 58.05M |
| 2021 | 1 | — | — | AED 22.49M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2024–2026
| Year | Studio | Gross yield |
|---|---|---|
| 2026 YTD | 46k | — |
| 2025 | 50k | 7.69% |
| 2024 | 44k | 7.91% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Sep 2026 | 5 | AED 600k | 1 806 | 1 771 – 1 907 |
| Aug 2026 | 1 | — | — | — |
| Jul 2026 | 4 | — | — | — |
| Jun 2026 | 0 | — | — | — |
| May 2026 | 2 | — | — | — |
| Apr 2026 | 0 | — | — | — |
| Mar 2026 | 1 | — | — | — |
| Feb 2026 | 2 | — | — | — |
| Jan 2026 | 2 | — | — | — |
| Dec 2025 | 3 | — | — | — |
| Nov 2025 | 5 | AED 660k | 1 950 | 1 943 – 1 995 |
| Oct 2025 | 3 | — | — | — |
| Sep 2025 | 2 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Meydan One Community
Questions about Azizi Riviera 41
Who is the developer of Azizi Riviera 41?
The Dubai Land Department project registry lists Azizi Developments L.L.C as the developer of Azizi Riviera 41.
Is Azizi Riviera 41 completed?
The DLD registry status of Azizi Riviera 41 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 18 Jan 2024 — a registry date, not a handover promise.
How many homes are in Azizi Riviera 41?
The DLD registry records 248 units in Azizi Riviera 41.
What is the price per square foot in Azizi Riviera 41?
Over the last 12 complete months the median registered sale in Azizi Riviera 41 was AED 660k, or AED 1 937 per sqft, from 25 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Azizi Riviera 41?
The escrow agent recorded by DLD for Azizi Riviera 41 is Abu Dhabi Commercial Bank.
Where is Azizi Riviera 41?
Azizi Riviera 41 is in the Meydan One Community community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗