Azizi Riviera 63
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Azizi Riviera 63: ChatGPT · Claude · Perplexity
Azizi Riviera 63 is a project by Azizi Developments L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 18 sales registered in the trailing 12 months at a median AED 1.13M (2 282 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 18 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Azizi Developments L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 8 Aug 2023 |
| Construction started | 26 May 2023 |
| Declared completion | 13 Feb 2025 — registry date, not a handover promise |
| Units in the project | 122 |
| Project area | 5 603 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 2686 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Nov 2025: in the 11 months since, no month reached the five registered sales a median needs (10 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 7 Jun 2023 at 18.9% to 13 Feb 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 13 Feb 2025 | 100.0% | +81.1 pp |
| 7 Jun 2023 | 18.9% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (9) | 9 | AED 839k | 2 327 | 360 sqft | — | — |
| 1-bedroom apartments insufficient data | 3 | — | — | — | — | — |
| 2-bedroom apartments insufficient data | 3 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 2 Nov 2026 | 1 B/R Flat | Ready | 658 sqft | AED 1 300 000 | 1 976 |
| 11 Aug 2026 | 2 B/R Flat | Ready | 757 sqft | AED 1 726 725 | 2 282 |
| 7 Aug 2026 | Shop | Ready | 488 sqft | AED 3 006 000 | — |
| 4 Aug 2026 | Studio Flat | Ready | 407 sqft | AED 784 750 | 1 929 |
| 4 Jun 2026 | Shop | Ready | 1 245 sqft | AED 6 616 000 | — |
| 8 Apr 2026 | Studio Flat | Ready | 341 sqft | AED 822 150 | 2 409 |
| 12 Feb 2026 | 1 B/R Flat | Ready | 591 sqft | AED 1 351 910 | 2 286 |
| 29 Jan 2026 | Studio Flat | Ready | 346 sqft | AED 750 000 | 2 167 |
| 20 Jan 2026 | 2 B/R Flat | Ready | 896 sqft | AED 1 744 010 | 1 946 |
| 15 Jan 2026 | 2 B/R Flat | Ready | 757 sqft | AED 1 692 240 | 2 236 |
| 25 Dec 2025 | 1 B/R Flat | Ready | 658 sqft | AED 1 412 233 | 2 147 |
| 23 Dec 2025 | Studio Flat | Ready | 403 sqft | AED 903 045 | 2 241 |
| 8 Dec 2025 | Shop | Ready | 317 sqft | AED 2 032 500 | — |
| 1 Dec 2025 | 1 B/R Flat | Ready | 612 sqft | AED 1 419 275 | 2 320 |
| 24 Nov 2025 | Studio Flat | Ready | 340 sqft | AED 909 585 | 2 672 |
| 20 Nov 2025 | Studio Flat | Ready | 402 sqft | AED 839 230 | 2 089 |
| 14 Nov 2025 | Studio Flat | Ready | 360 sqft | AED 859 763 | 2 387 |
| 14 Nov 2025 | Studio Flat | Ready | 383 sqft | AED 902 451 | 2 355 |
| 14 Nov 2025 | Studio Flat | Ready | 343 sqft | AED 797 065 | 2 327 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Azizi Riviera 63: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 9 | AED 1.69M | 2 236 | AED 18.49M |
| 2025 | 58 | AED 906k | 2 301 | AED 58.41M |
| 2024 | 87 | AED 1.09M | 2 618 | AED 107.72M |
| 2023 | 3 | — | — | AED 16.98M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Nov 2025 | 5 | AED 860k | 2 355 | 2 327 – 2 387 |
| Oct 2025 | 10 | AED 695k | 2 034 | 2 009 – 2 037 |
| Sep 2025 | 3 | — | — | — |
| Aug 2025 | 0 | — | — | — |
| Jul 2025 | 1 | — | — | — |
| Jun 2025 | 13 | AED 650k | 1 886 | 1 877 – 1 903 |
| May 2025 | 1 | — | — | — |
| Apr 2025 | 2 | — | — | — |
| Mar 2025 | 1 | — | — | — |
| Feb 2025 | 14 | AED 991k | 2 491 | 2 332 – 2 583 |
| Jan 2025 | 4 | — | — | — |
| Dec 2024 | 1 | — | — | — |
| Nov 2024 | 0 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 18 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Meydan One Community
Questions about Azizi Riviera 63
Who is the developer of Azizi Riviera 63?
The Dubai Land Department project registry lists Azizi Developments L.L.C as the developer of Azizi Riviera 63.
Is Azizi Riviera 63 completed?
The DLD registry status of Azizi Riviera 63 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 13 Feb 2025 — a registry date, not a handover promise.
How many homes are in Azizi Riviera 63?
The DLD registry records 122 units in Azizi Riviera 63.
What is the price per square foot in Azizi Riviera 63?
Over the last 12 complete months the median registered sale in Azizi Riviera 63 was AED 1.13M, or AED 2 282 per sqft, from 18 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Azizi Riviera 63?
The escrow agent recorded by DLD for Azizi Riviera 63 is Abu Dhabi Commercial Bank.
Where is Azizi Riviera 63?
Azizi Riviera 63 is in the Meydan One Community community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗