Azizi Riviera 63 is a project by Azizi Developments L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 18 sales registered in the trailing 12 months at a median AED 1.13M (2 282 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.13M +22.0% y/y
≈ US$ 308k · typical range AED 844k – AED 1.72M
DLD verified
Median price per sqft
AED 2 282/sqft -0.5% y/y
typical range 2 157 – 2 341 AED/sqft
DLD verified
Registered sales
18 -64.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 18 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAzizi Developments L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD8 Aug 2023
Construction started26 May 2023
Declared completion13 Feb 2025 — registry date, not a handover promise
Units in the project122
Project area5 603 sqm
Escrow agentAbu Dhabi Commercial Bank
Project number2686

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

2 0002 500Aug 2024Nov 2024Feb 2025May 2025Aug 2025Nov 2025Feb 2026May 2026Aug 20262 0002 500Aug 2024May 2025Feb 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Nov 2025: in the 11 months since, no month reached the five registered sales a median needs (10 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 2 technical inspections for this project, from 7 Jun 2023 at 18.9% to 13 Feb 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2025-02-132023-06-072025-02-13

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
13 Feb 2025100.0% +81.1 pp
7 Jun 202318.9% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios low sample (9) 9AED 839k 2 327 360 sqft — —
1-bedroom apartments insufficient data 3— — — — —
2-bedroom apartments insufficient data 3— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
2 Nov 20261 B/R FlatReady 658 sqftAED 1 300 000 1 976
11 Aug 20262 B/R FlatReady 757 sqftAED 1 726 725 2 282
7 Aug 2026ShopReady 488 sqftAED 3 006 000 —
4 Aug 2026Studio FlatReady 407 sqftAED 784 750 1 929
4 Jun 2026ShopReady 1 245 sqftAED 6 616 000 —
8 Apr 2026Studio FlatReady 341 sqftAED 822 150 2 409
12 Feb 20261 B/R FlatReady 591 sqftAED 1 351 910 2 286
29 Jan 2026Studio FlatReady 346 sqftAED 750 000 2 167
20 Jan 20262 B/R FlatReady 896 sqftAED 1 744 010 1 946
15 Jan 20262 B/R FlatReady 757 sqftAED 1 692 240 2 236
25 Dec 20251 B/R FlatReady 658 sqftAED 1 412 233 2 147
23 Dec 2025Studio FlatReady 403 sqftAED 903 045 2 241
8 Dec 2025ShopReady 317 sqftAED 2 032 500 —
1 Dec 20251 B/R FlatReady 612 sqftAED 1 419 275 2 320
24 Nov 2025Studio FlatReady 340 sqftAED 909 585 2 672
20 Nov 2025Studio FlatReady 402 sqftAED 839 230 2 089
14 Nov 2025Studio FlatReady 360 sqftAED 859 763 2 387
14 Nov 2025Studio FlatReady 383 sqftAED 902 451 2 355
14 Nov 2025Studio FlatReady 343 sqftAED 797 065 2 327

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Azizi Riviera 63: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0255075202320242025202602550752023202420252026

registered sales per calendar year; the current year is incomplete

By month

024NovDecJanFebMarAprMayJunJulAugSepOct024DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20269AED 1.69M 2 236AED 18.49M
202558AED 906k 2 301AED 58.41M
202487AED 1.09M 2 618AED 107.72M
20233— —AED 16.98M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Nov 20255 AED 860k2 355 2 327 – 2 387
Oct 202510 AED 695k2 034 2 009 – 2 037
Sep 20253 —— —
Aug 20250 —— —
Jul 20251 —— —
Jun 202513 AED 650k1 886 1 877 – 1 903
May 20251 —— —
Apr 20252 —— —
Mar 20251 —— —
Feb 202514 AED 991k2 491 2 332 – 2 583
Jan 20254 —— —
Dec 20241 —— —
Nov 20240 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 18 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Meydan One Community

Questions about Azizi Riviera 63

Who is the developer of Azizi Riviera 63?

The Dubai Land Department project registry lists Azizi Developments L.L.C as the developer of Azizi Riviera 63.

Is Azizi Riviera 63 completed?

The DLD registry status of Azizi Riviera 63 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 13 Feb 2025 — a registry date, not a handover promise.

How many homes are in Azizi Riviera 63?

The DLD registry records 122 units in Azizi Riviera 63.

What is the price per square foot in Azizi Riviera 63?

Over the last 12 complete months the median registered sale in Azizi Riviera 63 was AED 1.13M, or AED 2 282 per sqft, from 18 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Azizi Riviera 63?

The escrow agent recorded by DLD for Azizi Riviera 63 is Abu Dhabi Commercial Bank.

Where is Azizi Riviera 63?

Azizi Riviera 63 is in the Meydan One Community community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Azizi Riviera 63 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/azizi-riviera-63/”. Reuse is permitted with attribution.