Binghatti Amber
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Binghatti Amber is a project by Binghatti Developers Fze, recorded at 100% complete at its last Dubai Land Department inspection. 66 sales registered in the trailing 12 months at a median AED 1.00M (1 398 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 66 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Binghatti Developers Fze | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% — at the last DLD inspection | DLD verified |
| Registered with DLD | 17 Jul 2023 | DLD verified |
| Construction started | 1 Jun 2023 | DLD verified |
| Declared completion | 30 Oct 2024 — registry date, not a handover promise | DLD verified |
| Units in the project | 658 | DLD verified |
| Project area | 48 932 sqm | DLD verified |
| Escrow agent | Sharjah Islamic Bank | DLD verified |
| Project number | 2673 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2026: in the 1 months since, no month reached the five registered sales a median needs (2 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 3 technical inspections for this project, from 13 Jun 2023 at 0.0% to 5 Feb 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 5 Feb 2025 | 100.0% | +65.0 pp |
| 11 Jan 2024 | 35.0% | +35.0 pp |
| 13 Jun 2023 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2026 | 5 | AED 960k | 1 294 | 1 293 – 1 378 |
| Jul 2026 | 10 | AED 962k | 1 140 | 1 025 – 1 247 |
| Jun 2026 | 1 | — | — | — |
| May 2026 | 2 | — | — | — |
| Apr 2026 | 6 | AED 1.15M | 1 538 | 1 327 – 1 598 |
| Mar 2026 | 2 | — | — | — |
| Feb 2026 | 4 | — | — | — |
| Jan 2026 | 14 | AED 1.04M | 1 408 | 1 296 – 1 517 |
| Dec 2025 | 8 | AED 975k | 1 434 | 1 304 – 1 509 |
| Nov 2025 | 7 | AED 990k | 1 441 | 1 375 – 1 470 |
| Oct 2025 | 5 | AED 1.06M | 1 535 | 1 527 – 1 576 |
| Sep 2025 | 5 | AED 1.12M | 1 430 | 1 382 – 1 647 |
| Aug 2025 | 8 | AED 1.04M | 1 433 | 1 408 – 1 447 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (5) | 5 | AED 750k | 1 666 | 454 sqft | — | — |
| 1-bedroom apartments | 53 | AED 1.00M | 1 401 | 694 sqft | — | — |
| 2-bedroom apartments low sample (8) | 8 | AED 1.78M | 1 182 | 1 438 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 46 | AED 1.01M | 1 359 | AED 51.76M |
| 2025 | 177 | AED 1.00M | 1 363 | AED 193.69M |
| 2024 | 293 | AED 800k | 1 095 | AED 266.68M |
| 2023 | 398 | AED 770k | 1 091 | AED 366.71M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 7 Sep 2026 | Studio Flat — Binghatti Amber | Ready | 454 sqft | AED 720 000 | 1 587 |
| 1 Sep 2026 | 1 B/R Flat — Binghatti Amber | Ready | 692 sqft | AED 950 000 | 1 372 |
| 31 Aug 2026 | 1 B/R Flat — Binghatti Amber | Ready | 735 sqft | AED 950 000 | 1 293 |
| 31 Aug 2026 | 1 B/R Flat — Binghatti Amber | Ready | 682 sqft | AED 940 000 | 1 378 |
| 24 Aug 2026 | 1 B/R Flat — Binghatti Amber | Ready | 742 sqft | AED 960 000 | 1 294 |
| 18 Aug 2026 | 1 B/R Flat — Binghatti Amber | Ready | 806 sqft | AED 1 000 000 | 1 241 |
| 18 Aug 2026 | 1 B/R Flat — Binghatti Amber | Ready | 694 sqft | AED 970 000 | 1 398 |
| 31 Jul 2026 | 1 B/R Flat — Binghatti Amber | Ready | 951 sqft | AED 1 100 000 | 1 156 |
| 28 Jul 2026 | 1 B/R Flat — Binghatti Amber | Ready | 701 sqft | AED 950 000 | 1 356 |
| 24 Jul 2026 | 1 B/R Flat — Binghatti Amber | Ready | 952 sqft | AED 1 021 203 | 1 072 |
| 24 Jul 2026 | 1 B/R Flat — Binghatti Amber | Ready | 951 sqft | AED 960 000 | 1 010 |
| 24 Jul 2026 | 1 B/R Flat — Binghatti Amber | Ready | 954 sqft | AED 963 748 | 1 010 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Jumeirah Village Circle
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Binghatti Amber — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/binghatti-amber/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Binghatti Amber. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.