Champions Tower1
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Champions Tower1: ChatGPT · Claude · Perplexity
Champions Tower1 is a project by Mre Global Investment Group Fzc, recorded at 100% complete at its last Dubai Land Department inspection. 8 sales registered in the trailing 12 months at a median AED 555k (911 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 8 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Mre Global Investment Group Fzc |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 8 Nov 2008 |
| Construction started | 9 Sep 2007 |
| Declared completion | 18 Jan 2017 — registry date, not a handover promise |
| Units in the project | 135 |
| Project area | 8 461 sqm |
| Escrow agent | Commercial Bank Of Dubai(Psc) |
| Project number | 763 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Feb 2025: in the 20 months since, no month reached the five registered sales a median needs (22 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 24 Feb 2013 at 78.3% to 23 Feb 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 23 Feb 2017 | 100.0% | +3.5 pp |
| 16 Oct 2016 | 96.5% | +1.7 pp |
| 8 Oct 2015 | 94.8% | +4.8 pp |
| 19 Jul 2014 | 90.0% | +6.3 pp |
| 24 Nov 2013 | 83.7% | +5.4 pp |
| 24 Feb 2013 | 78.3% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 3 | — | — | — | — | — |
| 1-bedroom apartments low sample (5) | 5 | AED 560k | 838 | 675 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 20 Nov 2026 | 2 B/R Flat — CHAMPIONS TOWER 1 | Ready | 914 sqft | AED 1 001 000 | 1 095 |
| 19 Nov 2026 | 2 B/R Flat — CHAMPIONS TOWER 1 | Ready | 912 sqft | AED 1 001 000 | 1 098 |
| 1 Jul 2026 | 1 B/R Flat — CHAMPIONS TOWER 1 | Ready | 668 sqft | AED 560 000 | 838 |
| 30 Jun 2026 | 1 B/R Flat — CHAMPIONS TOWER 1 | Ready | 691 sqft | AED 550 000 | 795 |
| 23 Apr 2026 | 1 B/R Flat — CHAMPIONS TOWER 1 | Ready | 668 sqft | AED 560 000 | 838 |
| 27 Feb 2026 | Studio Flat — CHAMPIONS TOWER 1 | Ready | 490 sqft | AED 430 000 | 877 |
| 5 Jan 2026 | 1 B/R Flat — CHAMPIONS TOWER 1 | Ready | 675 sqft | AED 638 000 | 946 |
| 23 Dec 2025 | Studio Flat — CHAMPIONS TOWER 1 | Ready | 418 sqft | AED 400 000 | 956 |
| 22 Dec 2025 | 1 B/R Flat — CHAMPIONS TOWER 1 | Ready | 691 sqft | AED 660 000 | 955 |
| 3 Nov 2025 | Studio Flat — CHAMPIONS TOWER 1 | Ready | 420 sqft | AED 415 000 | 988 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Champions Tower1: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Mar 2025 – Feb 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 5 | AED 560k | 838 | AED 2.74M |
| 2025 | 23 | AED 500k | 821 | AED 12.29M |
| 2024 | 9 | AED 440k | 719 | AED 4.29M |
| 2023 | 25 | AED 375k | 599 | AED 9.49M |
| 2022 | 6 | AED 355k | 533 | AED 2.23M |
| 2021 | 2 | — | — | AED 550k |
| 2020 | 1 | — | — | AED 730k |
| 2019 | 5 | AED 575k | 780 | AED 2.91M |
| 2018 | 14 | AED 435k | 795 | AED 6.81M |
| 2017 | 14 | AED 568k | 948 | AED 8.17M |
| 2016 | 9 | AED 630k | 972 | AED 5.68M |
| 2015 | 11 | AED 552k | 957 | AED 7.48M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent by year, 2017–2026
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | Studio | 1-bed flat | 2-bed flat |
|---|---|---|---|
| 2026 YTD | 35k | 50k | — |
| 2025 | 39k | 50k | 69k |
| 2024 | 31k | 45k | 58k |
| 2023 | 27k | 41k | 52k |
| 2022 | 24k | 32k | 45k |
| 2021 | 20k | 27k | 39k |
| 2020 | 23k | 32k | 42k |
| 2019 | 27k | 36k | 51k |
| 2018 | 35k | 45k | 62k |
| 2017 | — | — | 70k |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Feb 2025 | 6 | AED 562k | 755 | 683 – 799 |
| Jan 2025 | 0 | — | — | — |
| Dec 2024 | 0 | — | — | — |
| Nov 2024 | 0 | — | — | — |
| Oct 2024 | 1 | — | — | — |
| Sep 2024 | 3 | — | — | — |
| Aug 2024 | 1 | — | — | — |
| Jul 2024 | 0 | — | — | — |
| Jun 2024 | 1 | — | — | — |
| May 2024 | 0 | — | — | — |
| Apr 2024 | 0 | — | — | — |
| Mar 2024 | 1 | — | — | — |
| Feb 2024 | 2 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 8 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Champions Tower1. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Elite 7 Sports Residence Finished · Triplanet International (Fzc) |
45 m | 100% |
| Frankfurt Sports Tower I Finished · Sumsum Developers Limited |
59 m | 100% |
| Azizi Grand Active · Azizi Developments L.L.C |
87 m | 82% |
| Uniestate Sports Tower Finished · Uniestate Properties L.L.C |
126 m | 100% |
| Elite 8 Sports Residence Finished · Triplanet Range 2 Investments Limited |
131 m | 100% |
| Rufi Golf Green Cancelled · Rufi Golf Greens Limited |
132 m | 32% |
| Bloomingdale Finished · S O L Properties Development L.L.C |
179 m | 100% |
| Golf View Residence Finished · Jamal Mohammed Alhassan & Bachar Bakri Almradi |
206 m | 100% |
| Golf Tower Finished · Falak Properties |
213 m | 100% |
| The Diamond Finished · First Homes Limited |
236 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Dubai Sports City
Questions about Champions Tower1
Who is the developer of Champions Tower1?
The Dubai Land Department project registry lists Mre Global Investment Group Fzc as the developer of Champions Tower1.
Is Champions Tower1 completed?
The DLD registry status of Champions Tower1 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 18 Jan 2017 — a registry date, not a handover promise.
How many homes are in Champions Tower1?
The DLD registry records 135 units in Champions Tower1.
What is the price per square foot in Champions Tower1?
Over the last 12 complete months the median registered sale in Champions Tower1 was AED 555k, or AED 911 per sqft, from 8 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Champions Tower1?
The escrow agent recorded by DLD for Champions Tower1 is Commercial Bank Of Dubai(Psc).
Where is Champions Tower1?
Champions Tower1 is in the Dubai Sports City community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Elite 7 Sports Residence, about 45 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗