Elaris Rise
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Elaris Rise is a project by Object One Real Estate Development L.L.C, recorded at 2% complete at its last Dubai Land Department inspection. 60 sales registered in the trailing 12 months at a median AED 1.27M (1 533 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 60 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Object One Real Estate Development L.L.C | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 2% — at the last DLD inspection | DLD verified |
| Registered with DLD | 7 Oct 2025 | DLD verified |
| Construction started | 15 Oct 2025 | DLD verified |
| Declared completion | 30 Sep 2028 — registry date, not a handover promise | DLD verified |
| Units in the project | 214 | DLD verified |
| Project area | 17 311 sqm | DLD verified |
| Escrow agent | Abu Dhabi Islamic Bank | DLD verified |
| Project number | 4018 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2026: in the 1 months since, no month reached the five registered sales a median needs (2 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 3 technical inspections for this project, from 21 Aug 2025 at 0.0% to 30 Jul 2026 at 1.7%. Since 21 Aug 2025 the recorded percentage has moved 0.15 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 30 Jul 2026 | 1.7% | +1.7 pp |
| 23 Apr 2026 | 0.0% | +0.0 pp |
| 21 Aug 2025 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2026 | 5 | AED 1.48M | 1 239 | 1 230 – 1 331 |
| Jul 2026 | 2 | — | — | — |
| Jun 2026 | 3 | — | — | — |
| May 2026 | 2 | — | — | — |
| Apr 2026 | 9 | AED 1.12M | 1 542 | 1 519 – 1 674 |
| Mar 2026 | 5 | AED 1.53M | 1 347 | 1 286 – 1 542 |
| Feb 2026 | 3 | — | — | — |
| Jan 2026 | 17 | AED 1.38M | 1 343 | 1 150 – 1 800 |
| Dec 2025 | 12 | AED 1.18M | 2 088 | 1 800 – 2 170 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (9) | 9 | AED 789k | 2 193 | 360 sqft | — | — |
| 1-bedroom apartments | 23 | AED 1.16M | 1 628 | 712 sqft | — | — |
| 2-bedroom apartments | 20 | AED 1.53M | 1 272 | 1 201 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 48 | AED 1.33M | 1 391 | AED 70.40M |
| 2025 | 12 | AED 1.18M | 2 088 | AED 18.94M |
| 2013 | 1 | — | — | AED 14.04M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 21 Sep 2026 | 1 B/R Flat — ELARIS Rise | Off-plan | 713 sqft | AED 1 160 292 | 1 628 |
| 14 Sep 2026 | 1 B/R Flat — ELARIS Rise | Off-plan | 713 sqft | AED 1 261 183 | 1 769 |
| 27 Aug 2026 | 2 B/R Flat — ELARIS Rise | Off-plan | 1 201 sqft | AED 1 488 087 | 1 239 |
| 27 Aug 2026 | 2 B/R Flat — ELARIS Rise | Off-plan | 1 201 sqft | AED 1 477 421 | 1 230 |
| 20 Aug 2026 | 1 B/R Flat — ELARIS Rise | Off-plan | 713 sqft | AED 1 270 600 | 1 783 |
| 10 Aug 2026 | 2 B/R Flat — ELARIS Rise | Off-plan | 1 201 sqft | AED 1 598 002 | 1 331 |
| 5 Aug 2026 | 2 B/R Flat — ELARIS Rise | Off-plan | 1 201 sqft | AED 1 478 153 | 1 230 |
| 31 Jul 2026 | 2 B/R Flat — ELARIS Rise | Off-plan | 1 201 sqft | AED 1 582 951 | 1 318 |
| 2 Jul 2026 | 1 B/R Flat — ELARIS Rise | Off-plan | 712 sqft | AED 1 037 319 | 1 456 |
| 17 Jun 2026 | 2 B/R Flat — ELARIS Rise | Off-plan | 1 201 sqft | AED 1 424 470 | 1 186 |
| 17 Jun 2026 | 2 B/R Flat — ELARIS Rise | Off-plan | 1 201 sqft | AED 1 424 932 | 1 186 |
| 11 Jun 2026 | 2 B/R Flat — ELARIS Rise | Off-plan | 1 201 sqft | AED 1 527 444 | 1 272 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Jumeirah Village Triangle
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Elaris Rise — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/elaris-rise/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Elaris Rise. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.