Elbrus Tower
Updated 25 Nov 2026 · latest DLD registrations 25 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Elbrus Tower: ChatGPT · Claude · Perplexity
Elbrus Tower is a project by Tiger Properties, recorded at 100% complete at its last Dubai Land Department inspection. 18 sales registered in the trailing 12 months at a median AED 1.22M (1 510 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 25 Nov 2026 · sample 18 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Tiger Properties |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 26 Jun 2023 |
| Construction started | 1 Jun 2023 |
| Declared completion | 31 Mar 2026 — registry date, not a handover promise |
| Units in the project | 270 |
| Project area | 17 163 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 2637 |
Source: DLD project registry (Mashrooi) · Data through 25 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 25 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Feb 2026: in the 8 months since, no month reached the five registered sales a median needs (2 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 11 technical inspections for this project, from 5 May 2023 at 0.0% to 2 Sep 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 2 Sep 2026 | 100.0% | +1.2 pp |
| 20 Aug 2026 | 98.8% | +1.2 pp |
| 10 Aug 2026 | 97.6% | +0.2 pp |
| 30 Jul 2026 | 97.3% | +3.5 pp |
| 27 Apr 2026 | 93.8% | +18.8 pp |
| 30 Dec 2025 | 75.0% | +34.8 pp |
| 18 Jul 2025 | 40.2% | +23.0 pp |
| 18 Feb 2025 | 17.2% | +15.0 pp |
| 8 Jul 2024 | 2.1% | +0.0 pp |
| 8 Jul 2024 | 2.1% | +2.1 pp |
| 5 May 2023 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 25 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 1 | — | — | — | — | — |
| 1-bedroom apartments low sample (10) | 10 | AED 1.01M | 1 470 | 717 sqft | — | — |
| 2-bedroom apartments low sample (7) | 7 | AED 1.45M | 1 488 | 972 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 25 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 19 Nov 2026 | 2 B/R Flat | Ready | 953 sqft | AED 1 300 000 | 1 364 |
| 18 Nov 2026 | Studio Flat | Ready | 378 sqft | AED 884 070 | 2 340 |
| 12 Nov 2026 | 2 B/R Flat | Ready | 964 sqft | AED 1 077 013 | 1 117 |
| 11 Nov 2026 | 2 B/R Flat | Ready | 953 sqft | AED 1 109 934 | 1 165 |
| 11 Nov 2026 | 1 B/R Flat | Ready | 705 sqft | AED 886 215 | 1 257 |
| 9 Nov 2026 | Studio Flat | Ready | 376 sqft | AED 480 000 | 1 277 |
| 24 Jun 2026 | 2 B/R Flat | Off-plan | 972 sqft | AED 1 447 000 | 1 488 |
| 25 Mar 2026 | 2 B/R Flat | Off-plan | 972 sqft | AED 1 240 926 | 1 276 |
| 16 Feb 2026 | 2 B/R Flat | Off-plan | 972 sqft | AED 1 880 760 | 1 934 |
| 16 Feb 2026 | 1 B/R Flat | Off-plan | 778 sqft | AED 1 380 032 | 1 774 |
| 16 Feb 2026 | 1 B/R Flat | Off-plan | 769 sqft | AED 1 453 122 | 1 889 |
| 16 Feb 2026 | 2 B/R Flat | Off-plan | 972 sqft | AED 1 880 761 | 1 934 |
| 5 Feb 2026 | 2 B/R Flat | Off-plan | 971 sqft | AED 1 235 686 | 1 273 |
| 8 Jan 2026 | 1 B/R Flat | Off-plan | 649 sqft | AED 914 367 | 1 408 |
| 29 Dec 2025 | 1 B/R Flat | Off-plan | 770 sqft | AED 906 689 | 1 178 |
| 15 Dec 2025 | 1 B/R Flat | Off-plan | 665 sqft | AED 905 800 | 1 362 |
| 15 Dec 2025 | 1 B/R Flat | Off-plan | 665 sqft | AED 909 500 | 1 367 |
| 12 Dec 2025 | 1 B/R Flat | Off-plan | 648 sqft | AED 769 644 | 1 188 |
| 1 Dec 2025 | Studio Flat | Off-plan | 378 sqft | AED 741 167 | 1 961 |
| 10 Nov 2025 | 1 B/R Flat | Off-plan | 777 sqft | AED 1 194 885 | 1 538 |
| 10 Nov 2025 | 1 B/R Flat | Off-plan | 778 sqft | AED 1 191 560 | 1 532 |
| 7 Nov 2025 | 2 B/R Flat | Off-plan | 972 sqft | AED 1 489 865 | 1 532 |
| 7 Nov 2025 | 2 B/R Flat | Off-plan | 971 sqft | AED 1 316 180 | 1 356 |
| 7 Nov 2025 | 1 B/R Flat | Off-plan | 648 sqft | AED 1 107 219 | 1 708 |
Source: Registered DLD transactions · Data through 25 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Elbrus Tower: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 8 | AED 1.41M | 1 631 | AED 11.43M |
| 2025 | 55 | AED 887k | 1 419 | AED 49.16M |
| 2024 | 138 | AED 875k | 1 332 | AED 121.42M |
| 2023 | 23 | AED 836k | 1 270 | AED 19.27M |
Source: Registered DLD transactions · Data through 25 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Feb 2026 | 5 | AED 1.45M | 1 889 | 1 774 – 1 934 |
| Jan 2026 | 1 | — | — | — |
| Dec 2025 | 5 | AED 906k | 1 362 | 1 188 – 1 367 |
| Nov 2025 | 5 | AED 1.19M | 1 532 | 1 532 – 1 538 |
| Oct 2025 | 2 | — | — | — |
| Sep 2025 | 3 | — | — | — |
| Aug 2025 | 4 | — | — | — |
| Jul 2025 | 11 | AED 910k | 1 417 | 1 339 – 1 467 |
| Jun 2025 | 3 | — | — | — |
| May 2025 | 13 | AED 590k | 1 482 | 1 348 – 1 567 |
| Apr 2025 | 6 | AED 1.18M | 1 406 | 1 278 – 1 524 |
| Mar 2025 | 2 | — | — | — |
| Feb 2025 | 1 | — | — | — |
Source: Registered DLD transactions · Data through 25 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 18 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Jumeirah Village Triangle
Questions about Elbrus Tower
Who is the developer of Elbrus Tower?
The Dubai Land Department project registry lists Tiger Properties as the developer of Elbrus Tower.
Is Elbrus Tower completed?
The DLD registry status of Elbrus Tower is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 31 Mar 2026 — a registry date, not a handover promise.
How many homes are in Elbrus Tower?
The DLD registry records 270 units in Elbrus Tower.
What is the price per square foot in Elbrus Tower?
Over the last 12 complete months the median registered sale in Elbrus Tower was AED 1.22M, or AED 1 510 per sqft, from 18 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Elbrus Tower?
The escrow agent recorded by DLD for Elbrus Tower is Abu Dhabi Commercial Bank.
Where is Elbrus Tower?
Elbrus Tower is in the Jumeirah Village Triangle community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 25 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 25 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗