Data Dubai

Emerald Vision Tower

Emerald Vision TowerFinished100% built141 homesDLD data through 25 Nov 2026

Updated 25 Nov 2026 · latest DLD registrations 25 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Emerald Vision Tower: ChatGPT · Claude · Perplexity

Emerald Vision Tower is a project by Vision Avenue Homes (Fzc), recorded at 100% complete at its last Dubai Land Department inspection. 17 sales registered in the trailing 12 months at a median AED 1.30M (1 418 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.30M +3.6% y/y
≈ US$ 354k · typical range AED 928k – AED 1.67M
DLD verified
Median price per sqft
AED 1 418/sqft -5.6% y/y
typical range 1 296 – 1 571 AED/sqft
DLD verified
Registered sales
17 -29.2% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 25 Nov 2026 · sample 17 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperVision Avenue Homes (Fzc)
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD13 Feb 2024
Construction started5 Oct 2022
Units in the project141
Project area11 881 sqm
Escrow agentEmirates Islamic Bank P.J.S.C.
Project number2805

Source: DLD project registry (Mashrooi) · Data through 25 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 25 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Nov 2025: in the 11 months since, no month reached the five registered sales a median needs (11 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 27 Oct 2023 at 42.0% to 15 Aug 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%2023-10-272025-08-15

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
15 Aug 2025100.0% +8.9 pp
13 Nov 202491.1% +49.1 pp
27 Oct 202342.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 25 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios insufficient data 3— — — — —
1-bedroom apartments low sample (8) 8AED 1.28M 1 574 815 sqft — —
2-bedroom apartments insufficient data 4— — — — —
3-bedroom apartments insufficient data 2— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 25 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
16 Nov 20262 B/R FlatReady 1 139 sqftAED 1 600 000 1 405
10 Nov 20261 B/R FlatReady 815 sqftAED 1 200 000 1 473
28 Oct 20262 B/R FlatReady 1 139 sqftAED 1 600 000 1 405
27 Oct 2026Studio FlatReady 424 sqftAED 601 750 1 418
3 Sep 20261 B/R FlatReady 814 sqftAED 1 050 000 1 289
13 Aug 20261 B/R FlatReady 814 sqftAED 850 000 1 044
30 Jun 20263 B/R FlatReady 1 573 sqftAED 2 100 000 1 335
9 Apr 2026Studio FlatReady 417 sqftAED 537 376 1 289
23 Feb 20261 B/R FlatReady 816 sqftAED 1 300 000 1 594
2 Feb 2026Studio FlatReady 417 sqftAED 540 110 1 296
30 Jan 20261 B/R FlatReady 817 sqftAED 1 300 000 1 592
20 Jan 20262 B/R FlatReady 1 139 sqftAED 1 778 010 1 561
12 Jan 20261 B/R FlatReady 815 sqftAED 1 300 000 1 595
24 Nov 20253 B/R FlatReady 1 573 sqftAED 2 200 000 1 399
24 Nov 20251 B/R FlatReady 809 sqftAED 928 050 1 147
17 Nov 20252 B/R FlatReady 1 139 sqftAED 1 672 000 1 468
17 Nov 20252 B/R FlatReady 1 155 sqftAED 1 804 625 1 563
6 Nov 20251 B/R FlatReady 815 sqftAED 1 285 000 1 577
3 Nov 20251 B/R FlatReady 815 sqftAED 1 280 000 1 571

Source: Registered DLD transactions · Data through 25 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Emerald Vision Tower: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

010203020172021202420252026010203020172021202420252026

registered sales per calendar year; the current year is incomplete

By month

0246NovDecJanFebMarAprMayJunJulAugSepOct0246DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202611AED 1.30M 1 405AED 12.96M
202529AED 1.28M 1 502AED 45.13M
202413AED 1.11M 1 403AED 12.43M
20211— —AED 818k
20171— —AED 16.35M

Source: Registered DLD transactions · Data through 25 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Nov 20256 AED 1.48M1 515 1 416 – 1 569
Oct 20251 —— —
Sep 20252 —— —
Aug 20250 —— —
Jul 20251 —— —
Jun 20251 —— —
May 20250 —— —
Apr 20258 AED 1.25M1 527 1 474 – 1 546
Mar 20252 —— —
Feb 20256 AED 1.66M1 438 1 381 – 1 491

Source: Registered DLD transactions · Data through 25 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 17 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Jumeirah Village Triangle

Questions about Emerald Vision Tower

Who is the developer of Emerald Vision Tower?

The Dubai Land Department project registry lists Vision Avenue Homes (Fzc) as the developer of Emerald Vision Tower.

Is Emerald Vision Tower completed?

The DLD registry status of Emerald Vision Tower is Finished, 100% complete at the last DLD inspection.

How many homes are in Emerald Vision Tower?

The DLD registry records 141 units in Emerald Vision Tower.

What is the price per square foot in Emerald Vision Tower?

Over the last 12 complete months the median registered sale in Emerald Vision Tower was AED 1.30M, or AED 1 418 per sqft, from 17 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Emerald Vision Tower?

The escrow agent recorded by DLD for Emerald Vision Tower is Emirates Islamic Bank P.J.S.C..

Where is Emerald Vision Tower?

Emerald Vision Tower is in the Jumeirah Village Triangle community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 25 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 25 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Emerald Vision Tower — Data Dubai, Continental Club Property, data through 25 Nov 2026, https://datadubai.ae/projects/emerald-vision-tower/”. Reuse is permitted with attribution.