Hub Canal 2 Tower
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Hub Canal 2 Tower: ChatGPT · Claude · Perplexity
Hub Canal 2 Tower is a project by Falak Properties, recorded at 100% complete at its last Dubai Land Department inspection. 8 sales registered in the trailing 12 months at a median AED 835k (741 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 8 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Falak Properties |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 9 Nov 2010 |
| Construction started | 17 Jun 2007 |
| Declared completion | 20 Apr 2017 — registry date, not a handover promise |
| Units in the project | 180 |
| Project area | 17 844 sqm |
| Project number | 1302 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median of a month with no neighbouring month to join it to interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Apr 2025: in the 18 months since, no month reached the five registered sales a median needs (14 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 2 Jul 2014 at 95.1% to 7 Jun 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 7 Jun 2017 | 100.0% | +1.0 pp |
| 17 May 2017 | 99.0% | +1.3 pp |
| 5 Feb 2017 | 97.7% | +1.2 pp |
| 28 Sep 2016 | 96.5% | +0.0 pp |
| 18 May 2015 | 96.5% | +1.4 pp |
| 2 Jul 2014 | 95.1% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments insufficient data | 3 | — | — | — | — | — |
| 2-bedroom apartments low sample (5) | 5 | AED 875k | 746 | 1 174 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 17 Nov 2026 | 2 B/R Flat — Hub Canal 2 | Ready | 1 174 sqft | AED 850 000 | 724 |
| 14 Oct 2026 | 1 B/R Flat — Hub Canal 2 | Ready | 1 002 sqft | AED 800 000 | 799 |
| 24 Sep 2026 | 1 B/R Flat — Hub Canal 2 | Ready | 1 045 sqft | AED 750 000 | 718 |
| 1 Sep 2026 | 1 B/R Flat — Hub Canal 2 | Ready | 970 sqft | AED 715 000 | 737 |
| 20 Jul 2026 | 2 B/R Flat — Hub Canal 2 | Ready | 1 174 sqft | AED 850 000 | 724 |
| 24 Mar 2026 | 2 B/R Flat — Hub Canal 2 | Ready | 1 172 sqft | AED 960 000 | 819 |
| 15 Dec 2025 | 2 B/R Flat — Hub Canal 2 | Ready | 1 174 sqft | AED 875 000 | 746 |
| 5 Dec 2025 | 2 B/R Flat — Hub Canal 2 | Ready | 1 176 sqft | AED 820 000 | 697 |
| 24 Nov 2025 | 2 B/R Flat — Hub Canal 2 | Ready | 1 175 sqft | AED 990 000 | 843 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Hub Canal 2 Tower: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, May 2025 – Apr 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 5 | AED 800k | 737 | AED 4.08M |
| 2025 | 29 | AED 686k | 663 | AED 21.37M |
| 2024 | 21 | AED 615k | 604 | AED 13.82M |
| 2023 | 21 | AED 525k | 497 | AED 11.35M |
| 2022 | 31 | AED 425k | 422 | AED 14.00M |
| 2021 | 35 | AED 410k | 409 | AED 15.71M |
| 2020 | 24 | AED 454k | 450 | AED 11.22M |
| 2019 | 27 | AED 663k | 650 | AED 18.57M |
| 2018 | 34 | AED 700k | 706 | AED 24.18M |
| 2017 | 9 | AED 680k | 691 | AED 6.14M |
| 2016 | 26 | AED 1.20M | 1 054 | AED 30.75M |
| 2015 | 7 | AED 1.20M | 1 053 | AED 8.12M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2017–2026
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 58k | 75k | — |
| 2025 | 55k | 68k | 8.50% |
| 2024 | 47k | 63k | 7.75% |
| 2023 | 41k | 55k | — |
| 2022 | 36k | 45k | 8.55% |
| 2021 | 32k | 40k | 8.00% |
| 2020 | 32k | 48k | 7.10% |
| 2019 | 46k | 60k | 6.94% |
| 2018 | 55k | 65k | 7.86% |
| 2017 | 57k | — | — |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Apr 2025 | 7 | AED 686k | 608 | 595 – 671 |
| Mar 2025 | 4 | — | — | — |
| Feb 2025 | 3 | — | — | — |
| Jan 2025 | 6 | AED 627k | 609 | 607 – 633 |
| Dec 2024 | 6 | AED 622k | — | — |
| Nov 2024 | 4 | — | — | — |
| Oct 2024 | 1 | — | — | — |
| Sep 2024 | 2 | — | — | — |
| Aug 2024 | 1 | — | — | — |
| Jul 2024 | 0 | — | — | — |
| Jun 2024 | 0 | — | — | — |
| May 2024 | 3 | — | — | — |
| Apr 2024 | 1 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 8 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Hub Canal 2 Tower. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Elite 6 Sports Residence Finished · Triplanet International (Fzc) |
76 m | 100% |
| Hub Canal 1 Tower Finished · Falak Properties |
79 m | 100% |
| Lime Light Twin Towers Active · Lime Light Real Estate Development L.L.C |
106 m | 71% |
| Elite Sports Residence Finished · Triplanet International (Fzc) |
132 m | 100% |
| Elite Ii Sports Residence Finished · Triplanet International (Fzc) |
174 m | 100% |
| Oasis Tower 2 Active · P A L Developments L.L.C |
195 m | 74% |
| Olympic Park 4 Finished · Gulf General Investments Co. (P.S.C) |
199 m | 100% |
| Sport One Business Tower Cancelled · Axon Real Estate Development |
201 m | 15% |
| Champion Tower 3 Active · Fast Solutions Real Estate Development |
222 m | 95% |
| The Spirit Finished · First Homes Limited |
249 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Dubai Sports City
Questions about Hub Canal 2 Tower
Who is the developer of Hub Canal 2 Tower?
The Dubai Land Department project registry lists Falak Properties as the developer of Hub Canal 2 Tower.
Is Hub Canal 2 Tower completed?
The DLD registry status of Hub Canal 2 Tower is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 20 Apr 2017 — a registry date, not a handover promise.
How many homes are in Hub Canal 2 Tower?
The DLD registry records 180 units in Hub Canal 2 Tower.
What is the price per square foot in Hub Canal 2 Tower?
Over the last 12 complete months the median registered sale in Hub Canal 2 Tower was AED 835k, or AED 741 per sqft, from 8 registered sales. These are DLD registrations, not asking prices.
Where is Hub Canal 2 Tower?
Hub Canal 2 Tower is in the Dubai Sports City community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Elite 6 Sports Residence, about 76 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗