Data Dubai

Jade Tower

Jade TowerActive11% built436 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Jade Tower: ChatGPT · Claude · Perplexity

Jade Tower is a project by Tiger Properties, recorded at 11% complete at its last Dubai Land Department inspection. 40 sales registered in the trailing 12 months at a median AED 925k (1 282 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 925k +32.3% y/y
≈ US$ 252k · typical range AED 786k – AED 1.09M
DLD verified
Median price per sqft
AED 1 282/sqft -1.1% y/y
typical range 1 194 – 1 334 AED/sqft
DLD verified
Registered sales
40 -75.3% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 40 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperTiger Properties
StatusActive
Construction progress11% — at the last DLD inspection
Registered with DLD4 Jun 2024
Construction started1 Apr 2024
Declared completion31 Mar 2027 — registry date, not a handover promise
Units in the project436
Project area33 702 sqm
Escrow agentAbu Dhabi Commercial Bank
Project number3074

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 0001 2001 400Dec 2024Feb 2025Apr 2025Jun 2025Aug 2025Oct 2025Dec 2025Feb 2026Apr 2026Jun 2026Aug 2026Oct 20261 0001 2001 400Dec 2024Jul 2025Feb 2026Sep 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Dec 2025: in the 10 months since, no month reached the five registered sales a median needs (17 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 7 technical inspections for this project, from 9 May 2024 at 0.0% to 2 Oct 2026 at 11.0%. Since 30 Dec 2025 the recorded percentage has moved 0.64 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2027-03-312024-05-092026-10-02

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
2 Oct 202611.0% +1.6 pp
18 Jun 20269.4% +1.8 pp
1 Apr 20267.6% +0.0 pp
1 Apr 20267.6% +2.4 pp
30 Dec 20255.2% +5.1 pp
25 Feb 20250.1% +0.1 pp
9 May 20240.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Homes and registered off-plan sales

The DLD unit register lists 434 homes in Jade Tower, and 211 off-plan sale registrations have been recorded since August 2024, as of 23 Nov 2026. After 2.3 years of sales, resales make up a growing part of those registrations, so we do not turn them into an unsold count.

HomesIn unit
register
Registered
sales
Studios9089
1 bedroom25293
2 bedrooms9229

Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗

Homes without a registered sale in all Dubai off-plan projects →

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios low sample (9) 9AED 510k 1 334 372 sqft — —
1-bedroom apartments 27AED 968k 1 243 744 sqft — —
2-bedroom apartments insufficient data 4— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
24 Nov 20262 B/R FlatOff-plan 1 262 sqftAED 1 233 643 977
22 Oct 20261 B/R FlatOff-plan 744 sqftAED 816 000 1 097
12 Oct 20261 B/R FlatOff-plan 744 sqftAED 806 594 1 084
28 Sep 20261 B/R FlatOff-plan 744 sqftAED 1 165 374 1 567
7 Sep 2026Studio FlatOff-plan 372 sqftAED 497 695 1 336
31 Aug 20261 B/R FlatOff-plan 868 sqftAED 1 268 845 1 461
28 Jul 20261 B/R FlatOff-plan 744 sqftAED 888 446 1 194
20 Jul 2026Studio FlatOff-plan 372 sqftAED 303 500 815
25 May 20261 B/R FlatOff-plan 744 sqftAED 923 025 1 241
18 May 20261 B/R FlatOff-plan 744 sqftAED 1 031 484 1 386
28 Apr 20261 B/R FlatOff-plan 744 sqftAED 838 660 1 128
2 Apr 20261 B/R FlatOff-plan 744 sqftAED 886 324 1 191
10 Mar 20261 B/R FlatOff-plan 938 sqftAED 1 236 994 1 318
5 Mar 20261 B/R FlatOff-plan 744 sqftAED 987 259 1 327
16 Feb 2026Studio FlatOff-plan 372 sqftAED 522 578 1 403
16 Feb 2026Studio FlatOff-plan 372 sqftAED 490 166 1 316
9 Feb 20262 B/R FlatOff-plan 1 319 sqftAED 1 404 252 1 065
3 Feb 2026Studio FlatOff-plan 372 sqftAED 484 931 1 302
27 Jan 20261 B/R FlatOff-plan 744 sqftAED 951 254 1 279
18 Dec 20252 B/R FlatOff-plan 1 066 sqftAED 1 366 705 1 282
17 Dec 2025Studio FlatOff-plan 372 sqftAED 495 870 1 331
15 Dec 20251 B/R FlatOff-plan 744 sqftAED 845 450 1 137
15 Dec 2025Studio FlatOff-plan 372 sqftAED 526 597 1 414
15 Dec 20251 B/R FlatOff-plan 744 sqftAED 991 146 1 332

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Jade Tower: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0501001502018202220242025202605010015020182022202420252026

registered sales per calendar year; the current year is incomplete

By month

051015NovDecJanFebMarAprMayJunJulAugSepOct051015DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202618AED 888k 1 302AED 15.20M
2025158AED 731k 1 270AED 120.50M
202435AED 533k 1 379AED 20.64M
20222— —AED 20.37M
20181— —AED 63.18M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Dec 20258 AED 876k1 306 1 197 – 1 344
Nov 202514 AED 1.00M1 274 1 209 – 1 305
Oct 20254 —— —
Sep 202518 AED 750k1 274 1 078 – 1 343
Aug 202510 AED 696k1 290 1 189 – 1 383
Jul 202528 AED 779k1 204 1 009 – 1 264
Jun 202522 AED 542k1 366 1 343 – 1 401
May 202518 AED 722k970 953 – 1 001
Apr 20256 AED 956k1 120 1 078 – 1 325
Mar 20250 —— —
Feb 20253 —— —
Jan 202520 AED 699k1 296 1 183 – 1 403
Dec 202421 AED 529k1 390 1 346 – 1 421

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Majan

Questions about Jade Tower

Who is the developer of Jade Tower?

The Dubai Land Department project registry lists Tiger Properties as the developer of Jade Tower.

Is Jade Tower completed?

The DLD registry status of Jade Tower is Active, 11% complete at the last DLD inspection. The declared completion date in the registry is 31 Mar 2027 — a registry date, not a handover promise.

How many homes are in Jade Tower?

The DLD registry records 436 units in Jade Tower. The split by number of bedrooms is in the unit register table on this page.

What is the price per square foot in Jade Tower?

Over the last 12 complete months the median registered sale in Jade Tower was AED 925k, or AED 1 282 per sqft, from 40 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Jade Tower?

The escrow agent recorded by DLD for Jade Tower is Abu Dhabi Commercial Bank.

Where is Jade Tower?

Jade Tower is in the Majan community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Jade Tower — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/jade-tower/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Jade Tower. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.