Data Dubai

Manazel Alkhor

Manazel AlkhorFinished100% built125 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Manazel Alkhor: ChatGPT · Claude · Perplexity

Manazel Alkhor is a project by Manazel Al Khor L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperManazel Al Khor L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD6 Mar 2014
Construction started1 Feb 2014
Declared completion19 Mar 2017 — registry date, not a handover promise
Units in the project125
Project area22 028 sqm
Escrow agentMashreq Bank Psc
Project number1492

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 7 technical inspections for this project, from 16 Dec 2014 at 23.8% to 1 Jun 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2017-03-192014-12-162017-06-01

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
1 Jun 2017100.0% +2.8 pp
16 Jan 201797.2% +8.8 pp
31 Aug 201688.4% +9.6 pp
23 Feb 201678.8% +11.0 pp
9 Nov 201567.8% +26.3 pp
21 May 201541.5% +17.8 pp
16 Dec 201423.8% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Manazel Alkhor: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

010202014201520162017201820192023202420250102020142016201820232025

registered sales per calendar year; the current year is incomplete

YearSalesMedian priceMedian AED/sqftTotal registered value
20257AED 3.10M 1 299AED 21.73M
202410AED 1.39M 1 604AED 20.52M
20231— —AED 975k
20191— —AED 3.50M
20188AED 3.25M 1 657AED 21.40M
20173— —AED 9.09M
20162— —AED 9.81M
20152— —AED 5.93M
201424AED 5.00M 2 042AED 122.91M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent by year, 2019–2026

120k140k160k20192020202120222023202420252026120k140k160k2019202120232025

3-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year1-bed flat2-bed flat3-bed flat
2026 YTD 81k150k155k
2025 71k150k140k
2024 65k150k138k
2023 68k150k120k
2022 61k—120k
2021 58k—115k
2020 ——128k
2019 76k—132k

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

9 projects with a page on this site are registered within 1.2 km of Manazel Alkhor. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Niloofar
Finished · Rmg Limited
185 m100%94
The Pearl
Finished · Alshafar Development L.L.C
264 m100%61
Iris Amber
Finished · S O L Properties Development L.L.C
316 m100%95
Lamer
Cancelled · Trinity Developers Limited
345 m21%1
Palazzo Versace
Finished · Emirates Pv Dubai Limited
589 m100%173
Cascade Manor
Cancelled · Gold Line Real Estate Development L.L.C
709 m5%1
D1
Finished · Emirates D1 Limited
738 m100%523
Nastaran Tower
Finished · Raam Limited
752 m100%177
Riah Towers
Finished · Radiant Star Properties L.L.C
755 m100%160

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Jaddaf Waterfront

Questions about Manazel Alkhor

Who is the developer of Manazel Alkhor?

The Dubai Land Department project registry lists Manazel Al Khor L.L.C as the developer of Manazel Alkhor.

Is Manazel Alkhor completed?

The DLD registry status of Manazel Alkhor is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 19 Mar 2017 — a registry date, not a handover promise.

How many homes are in Manazel Alkhor?

The DLD registry records 125 units in Manazel Alkhor.

What is the price per square foot in Manazel Alkhor?

Too few sales were registered in Manazel Alkhor in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Manazel Alkhor?

The escrow agent recorded by DLD for Manazel Alkhor is Mashreq Bank Psc.

Where is Manazel Alkhor?

Manazel Alkhor is in the Jaddaf Waterfront community. 9 other projects with a page on this site are registered within 1.2 km; the closest is Niloofar, about 185 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Manazel Alkhor — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/manazel-alkhor/”. Reuse is permitted with attribution.