Mareva The Oasis
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Mareva The Oasis is a project by Emaar Development P.J.S.C., recorded at 2% complete at its last Dubai Land Department inspection. 256 sales registered in the trailing 12 months at a median AED 15.56M. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 256 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Emaar Development P.J.S.C. | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 2% — at the last DLD inspection | DLD verified |
| Registered with DLD | 8 Dec 2025 | DLD verified |
| Construction started | 22 Mar 2026 | DLD verified |
| Declared completion | 28 Feb 2030 — registry date, not a handover promise | DLD verified |
| Units in the project | 311 | DLD verified |
| Project area | 324 628 sqm | DLD verified |
| Escrow agent | Abu Dhabi Commercial Bank | DLD verified |
| Project number | 4269 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 3 Dec 2025 at 0.0% to 16 Jun 2026 at 2.0%. Since 3 Dec 2025 the recorded percentage has moved 0.32 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 16 Jun 2026 | 2.0% | +2.0 pp |
| 3 Dec 2025 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 256 | AED 15.56M | — | AED 4.89B |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 8 Sep 2026 | Land — Mareva The Oasis | Ready | 8 761 sqft | AED 14 829 888 | — |
| 26 Aug 2026 | Land — Mareva The Oasis | Ready | 8 644 sqft | AED 13 931 888 | — |
| 24 Aug 2026 | Land — Mareva The Oasis | Ready | 14 776 sqft | AED 26 978 888 | — |
| 22 Jul 2026 | Land — Mareva The Oasis | Ready | 8 762 sqft | AED 14 778 888 | — |
| 13 Jul 2026 | Land — Mareva The Oasis | Ready | 8 444 sqft | AED 14 771 430 | — |
| 13 Jul 2026 | Land — Mareva The Oasis | Ready | 8 598 sqft | AED 13 925 888 | — |
| 2 Jul 2026 | Land — Mareva The Oasis | Ready | 14 639 sqft | AED 26 147 211 | — |
| 30 Jun 2026 | Land — Mareva The Oasis | Ready | 10 334 sqft | AED 22 518 888 | — |
| 8 Jun 2026 | Land — Mareva The Oasis | Ready | 14 639 sqft | AED 27 972 888 | — |
| 8 Jun 2026 | Land — Mareva The Oasis | Ready | 8 424 sqft | AED 15 654 888 | — |
| 2 Jun 2026 | Land — Mareva The Oasis | Ready | 9 070 sqft | AED 16 675 888 | — |
| 19 May 2026 | Land — Mareva The Oasis | Ready | 8 492 sqft | AED 14 589 888 | — |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects by Emaar Development P.J.S.C.
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Mareva The Oasis — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/mareva-the-oasis/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Mareva The Oasis. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.