Data Dubai

Mas Tower

Mas TowerFinished100% built96 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Mas Tower: ChatGPT · Claude · Perplexity

Mas Tower is a project by Revi Realty Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
2 -93.5% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 2 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperRevi Realty Real Estate Development L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD24 Feb 2023
Construction started1 Sep 2022
Declared completion31 Dec 2023 — registry date, not a handover promise
Units in the project96
Project area9 138 sqm
Escrow agentMashreq Bank Psc
Project number2521

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

8001 0001 200Sep 2023Dec 2023Mar 2024Jun 2024Sep 2024Dec 2024Mar 2025Jun 2025Sep 2025Dec 20258001 0001 200Sep 2023Jul 2024May 2025

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Feb 2025: in the 20 months since, no month reached the five registered sales a median needs (8 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 4 technical inspections for this project, from 2 Jan 2023 at 45.2% to 28 Aug 2024 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2023-12-312023-01-022024-08-28

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
28 Aug 2024100.0% +13.2 pp
25 Dec 202386.8% +13.6 pp
31 Aug 202373.2% +28.0 pp
2 Jan 202345.2% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments insufficient data 1— — — — —
2-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
4 Nov 20261 B/R FlatReady 882 sqftAED 1 070 000 1 213
1 Sep 20262 B/R FlatReady 1 323 sqftAED 2 020 000 1 526
12 Feb 20261 B/R FlatReady 865 sqftAED 1 065 000 1 231

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Mas Tower: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0501001502018202320242025202605010015020182023202420252026

registered sales per calendar year; the current year is incomplete

By month

001MarAprMayJunJulAugSepOctNovDecJanFeb001AprJunAugOctDecFeb

registered sales per month, Mar 2025 – Feb 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20262— —AED 3.08M
202515AED 981k 1 123AED 14.49M
202442AED 905k 952AED 38.66M
2023182AED 708k 771AED 55.75M
20181— —AED 20.42M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2024–2026

Median annual rent, AED thousand
Year1-bed flatGross yield
2026 YTD 76k—
2025 75k—
2024 75k8.33%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Feb 20255 AED 950k1 077 785 – 1 206
Jan 20253 —— —
Dec 20244 —— —
Nov 202412 AED 952k1 008 797 – 1 068
Oct 202411 AED 735k776 774 – 898
Sep 20240 —— —
Aug 20240 —— —
Jul 20240 —— —
Jun 20240 —— —
May 20243 —— —
Apr 20241 —— —
Mar 20240 —— —
Feb 20246 AED 710k— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 2 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Silicon Oasis

Questions about Mas Tower

Who is the developer of Mas Tower?

The Dubai Land Department project registry lists Revi Realty Real Estate Development L.L.C as the developer of Mas Tower.

Is Mas Tower completed?

The DLD registry status of Mas Tower is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 31 Dec 2023 — a registry date, not a handover promise.

How many homes are in Mas Tower?

The DLD registry records 96 units in Mas Tower.

What is the price per square foot in Mas Tower?

Too few sales were registered in Mas Tower in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Mas Tower?

The escrow agent recorded by DLD for Mas Tower is Mashreq Bank Psc.

Where is Mas Tower?

Mas Tower is in the Silicon Oasis community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Mas Tower — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/mas-tower/”. Reuse is permitted with attribution.