Data Dubai

Moon Tower 1

Moon Tower 1Cancelled88% built293 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Moon Tower 1: ChatGPT · Claude · Perplexity

Moon Tower 1 is a project by Ali Khalifa Thani Alhannawi Real Estate Development L.L.C, recorded at 88% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAli Khalifa Thani Alhannawi Real Estate Development L.L.C
StatusCancelled
Construction progress88% — at the last DLD inspection
Registered with DLD8 Nov 2008
Construction started1 Jul 2007
Declared completion31 Aug 2019 — registry date, not a handover promise
Units in the project293
Project area19 700 sqm
Escrow agentEmirates Islamic Bank P.J.S.C.
Project number518

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 11 technical inspections for this project, from 3 Jul 2012 at 21.3% to 24 Aug 2023 at 87.6%. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2019-08-312012-07-032023-08-24

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
24 Aug 202387.6% -1.2 pp
20 Feb 201988.8% +1.7 pp
29 Jul 201887.0% +5.2 pp
4 Dec 201781.9% +3.8 pp
20 Feb 201778.1% +7.0 pp
25 Sep 201671.0% +7.4 pp
4 Jan 201663.7% +8.3 pp
21 May 201555.4% +19.6 pp
17 Aug 201435.8% +9.7 pp
17 Feb 201426.1% +4.8 pp
3 Jul 201221.3% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Moon Tower 1: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

02040602011201320142015201620172018201920202021202320240204060201320152017201920212024

registered sales per calendar year; the current year is incomplete

YearSalesMedian priceMedian AED/sqftTotal registered value
20241— —AED 1.44M
20231— —AED 968k
20212— —AED 1.42M
20203— —AED 868k
201929AED 641k 831AED 23.85M
20181— —AED 480k
201714AED 730k 1 069AED 11.15M
201637AED 883k 1 010AED 31.08M
201571AED 620k 950AED 51.72M
201421AED 763k 955AED 17.27M
20136AED 683k 956AED 4.21M
20114— —AED 4.26M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Moon Tower 1. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Scala Tower
Finished · Al Madar Investment (L.L.C)
155 m100%188
Hamilton Residency
Finished · Deyaar Development (P.J.S.C)
208 m100%183
Global Bay View
Cancelled · Sun Valley Holdings Limited
243 m26%1
J One
Finished · Rkm Durar Properties L.L.C
253 m100%353
Clayton Residency
Finished · Deyaar Development (P.J.S.C)
254 m100%173
The Pad
Finished · Pad Properties Nine Limited
283 m100%265
Santevill
Cancelled · Sungwon (Fze)
318 m46%—
Vera Tower
Finished · Damac World Real Estate L.L.C
368 m100%526
Majestine
Finished · Business Tower Investment L.L.C
372 m100%506
Water'S Edge
Finished · Damac Star Properties (L L C)
387 m100%222

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Business Bay

Questions about Moon Tower 1

Who is the developer of Moon Tower 1?

The Dubai Land Department project registry lists Ali Khalifa Thani Alhannawi Real Estate Development L.L.C as the developer of Moon Tower 1.

Is Moon Tower 1 completed?

The DLD registry status of Moon Tower 1 is Cancelled, 88% complete at the last DLD inspection. The declared completion date in the registry is 31 Aug 2019 — a registry date, not a handover promise.

How many homes are in Moon Tower 1?

The DLD registry records 293 units in Moon Tower 1.

What is the price per square foot in Moon Tower 1?

Too few sales were registered in Moon Tower 1 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Moon Tower 1?

The escrow agent recorded by DLD for Moon Tower 1 is Emirates Islamic Bank P.J.S.C..

Where is Moon Tower 1?

Moon Tower 1 is in the Business Bay community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Scala Tower, about 155 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Moon Tower 1 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/moon-tower-1/”. Reuse is permitted with attribution.