Seslia Tower
Data through 12 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026 · rebuilt daily
Seslia Tower is a project by Tiger Properties, recorded at 100% complete at its last Dubai Land Department inspection. 52 sales registered in the trailing 12 months at a median AED 580k (1 342 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 12 Nov 2026 · sample 52 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Tiger Properties |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 23 Dec 2022 |
| Construction started | 1 Dec 2022 |
| Declared completion | 31 Dec 2025 — registry date, not a handover promise |
| Units in the project | 378 |
| Project area | 21 683 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 2528 |
Source: DLD project registry (Mashrooi) · Data through 12 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 12 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 7 technical inspections for this project, from 20 Dec 2022 at 0.0% to 20 Jul 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 20 Jul 2026 | 100.0% | +10.0 pp |
| 2 Jan 2026 | 90.0% | +29.7 pp |
| 8 Jul 2025 | 60.3% | +30.1 pp |
| 20 Feb 2025 | 30.1% | +19.2 pp |
| 8 Jul 2024 | 10.9% | +8.3 pp |
| 11 Aug 2023 | 2.7% | +2.7 pp |
| 20 Dec 2022 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 12 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios | 29 | AED 545k | 1 386 | 391 sqft | — | — |
| 1-bedroom apartments low sample (9) | 9 | AED 815k | 1 359 | 578 sqft | — | — |
| 2-bedroom apartments low sample (14) | 14 | AED 1.19M | 1 186 | 983 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 12 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 29 Oct 2026 | 2 B/R Flat — Seslia Tower | Ready | 976 sqft | AED 1 275 000 | 1 306 |
| 26 Oct 2026 | 1 B/R Flat — Seslia Tower | Ready | 576 sqft | AED 750 000 | 1 303 |
| 26 Oct 2026 | 2 B/R Flat — Seslia Tower | Ready | 981 sqft | AED 1 280 000 | 1 305 |
| 23 Oct 2026 | Studio Flat — Seslia Tower | Ready | 392 sqft | AED 550 000 | 1 402 |
| 22 Oct 2026 | 2 B/R Flat — Seslia Tower | Ready | 981 sqft | AED 1 350 000 | 1 377 |
| 22 Oct 2026 | 1 B/R Flat — Seslia Tower | Ready | 576 sqft | AED 815 000 | 1 416 |
| 21 Oct 2026 | Studio Flat — Seslia Tower | Ready | 380 sqft | AED 580 000 | 1 528 |
| 16 Oct 2026 | Studio Flat — Seslia Tower | Ready | 382 sqft | AED 530 000 | 1 386 |
| 16 Oct 2026 | 2 B/R Flat — Seslia Tower | Ready | 984 sqft | AED 1 150 000 | 1 169 |
| 15 Oct 2026 | Studio Flat — Seslia Tower | Ready | 392 sqft | AED 515 000 | 1 313 |
| 14 Oct 2026 | 2 B/R Flat — Seslia Tower | Ready | 489 sqft | AED 494 126 | 1 011 |
| 9 Oct 2026 | 1 B/R Flat — Seslia Tower | Ready | 572 sqft | AED 815 000 | 1 424 |
Source: Registered DLD transactions · Data through 12 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 39 | AED 569k | 1 342 | AED 30.49M |
| 2025 | 81 | AED 720k | 1 209 | AED 47.27M |
| 2024 | 191 | AED 888k | 1 168 | AED 114.37M |
| 2023 | 106 | AED 540k | 1 147 | AED 64.82M |
| 2020 | 2 | — | — | AED 40.07M |
Source: Registered DLD transactions · Data through 12 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Oct 2026 | 19 | AED 750k | 1 329 | 1 304 – 1 420 |
| Sep 2026 | 1 | — | — | — |
| Aug 2026 | 0 | — | — | — |
| Jul 2026 | 5 | AED 560k | 1 342 | 1 280 – 1 359 |
| Jun 2026 | 1 | — | — | — |
| May 2026 | 1 | — | — | — |
| Apr 2026 | 2 | — | — | — |
| Mar 2026 | 4 | — | — | — |
| Feb 2026 | 4 | — | — | — |
| Jan 2026 | 2 | — | — | — |
| Dec 2025 | 8 | AED 874k | 1 316 | 1 157 – 1 461 |
| Nov 2025 | 2 | — | — | — |
| Oct 2025 | 2 | — | — | — |
Source: Registered DLD transactions · Data through 12 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Jumeirah Village Triangle
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Seslia Tower. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.