Data Dubai

Silicon Gate 3

Silicon Gate 3Finished100% built124 homesDLD data through 25 Nov 2026

Updated 25 Nov 2026 · latest DLD registrations 25 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Silicon Gate 3: ChatGPT · Claude · Perplexity

Silicon Gate 3 is a project by Time Properties, recorded at 100% complete at its last Dubai Land Department inspection. 7 sales registered in the trailing 12 months at a median AED 945k (856 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 945k +65.1% y/y
≈ US$ 257k · typical range AED 748k – AED 975k
DLD verified
Median price per sqft
AED 856/sqft +11.4% y/y
typical range 841 – 889 AED/sqft
DLD verified
Registered sales
7 -65.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 25 Nov 2026 · sample 7 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperTime Properties
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD8 Nov 2008
Construction started24 Feb 2009
Declared completion15 Aug 2013 — registry date, not a handover promise
Units in the project124
Project area9 344 sqm
Escrow agentEmirates Islamic Bank P.J.S.C.
Project number777

Source: DLD project registry (Mashrooi) · Data through 25 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 25 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Oct 2024: in the 24 months since, no month reached the five registered sales a median needs (27 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 2 technical inspections for this project, from 1 Oct 2012 at 73.5% to 4 Mar 2013 at 85.5%. Over the inspections since 1 Oct 2012 it moved 2.36 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2013-08-152012-10-012013-03-04

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
4 Mar 201385.5% +12.0 pp
1 Oct 201273.5% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 25 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments insufficient data 2— — — — —
2-bedroom apartments insufficient data 1— — — — —
3-bedroom apartments insufficient data 4— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 25 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
5 Nov 20262 B/R FlatReady 1 066 sqftAED 1 005 000 943
22 Sep 20263 B/R FlatReady 1 136 sqftAED 975 000 858
8 Jun 20261 B/R FlatReady 766 sqftAED 610 000 797
13 Apr 20263 B/R FlatReady 1 139 sqftAED 975 000 856
7 Apr 20263 B/R FlatReady 1 136 sqftAED 1 060 000 933
26 Mar 20261 B/R FlatReady 680 sqftAED 625 000 919
17 Feb 20262 B/R FlatReady 1 027 sqftAED 870 000 847
9 Feb 20263 B/R FlatReady 1 133 sqftAED 945 000 834

Source: Registered DLD transactions · Data through 25 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Silicon Gate 3: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0102020152016201720182019202020212022202320242025202601020201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

024NovDecJanFebMarAprMayJunJulAugSepOct024DecFebAprJunAugOct

registered sales per month, Nov 2024 – Oct 2025

YearSalesMedian priceMedian AED/sqftTotal registered value
20267AED 945k 856AED 6.06M
202515AED 550k 790AED 9.03M
202419AED 592k 678AED 10.53M
202311AED 400k 591AED 4.35M
20224— —AED 1.68M
202110AED 372k 514AED 4.54M
20203— —AED 1.11M
20195AED 500k 703AED 2.20M
20181— —AED 490k
201716AED 590k 829AED 9.00M
201618AED 736k 1 004AED 13.52M
201525AED 897k 904AED 21.39M

Source: Registered DLD transactions · Data through 25 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2014–2026

40k60k201420152016201720182019202020212022202320242025202640k60k2014201820222026

1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year1-bed flat2-bed flatGross yield
2026 YTD 49k——
2025 46k——
2024 43k60k—
2023 36k52k—
2022 31k45k—
2021 28k41k—
2020 32k——
2019 38k54k—
2018 48k58k—
2017 55k——
2016 60k80k—
2015 60k——
2014 60k—10.10%

Source: Ejari rental contracts and registered DLD sales · Data through 25 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Oct 20244 —531 526 – 556

Source: Registered DLD transactions · Data through 25 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 7 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Silicon Gate 3. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
La Vista 06
Finished · Al Manal Development Fzco
57 m100%96
Imperial
Finished · Bonyan Emirates Properties
57 m100%126
La Vista 04
Finished · Al Manal Development Fzco
175 m100%133
La Vista 05
Finished · Al Manal Development Fzco
178 m100%133
Al Falak Residence
Finished · Al Falak Residence Fzco
193 m100%97
La Vista 03
Finished · Al Manal Development Fzco
194 m100%128
Serenity Heights
Cancelled · Sariin S.R.O ( Representativf Office )
212 m63%1
La Visita 02
Finished · Al Manal Development Fzco
229 m100%128
Silicon Gate2
Finished · Time Properties
241 m100%132
La Visita 01
Finished · Al Manal Development Fzco
267 m100%128

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 25 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Silicon Oasis

Questions about Silicon Gate 3

Who is the developer of Silicon Gate 3?

The Dubai Land Department project registry lists Time Properties as the developer of Silicon Gate 3.

Is Silicon Gate 3 completed?

The DLD registry status of Silicon Gate 3 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 15 Aug 2013 — a registry date, not a handover promise.

How many homes are in Silicon Gate 3?

The DLD registry records 124 units in Silicon Gate 3.

What is the price per square foot in Silicon Gate 3?

Over the last 12 complete months the median registered sale in Silicon Gate 3 was AED 945k, or AED 856 per sqft, from 7 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Silicon Gate 3?

The escrow agent recorded by DLD for Silicon Gate 3 is Emirates Islamic Bank P.J.S.C..

Where is Silicon Gate 3?

Silicon Gate 3 is in the Silicon Oasis community. 10 other projects with a page on this site are registered within 1.2 km; the closest is La Vista 06, about 57 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 25 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 25 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Silicon Gate 3 — Data Dubai, Continental Club Property, data through 25 Nov 2026, https://datadubai.ae/projects/silicon-gate-3/”. Reuse is permitted with attribution.