Tetris Tower
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Tetris Tower: ChatGPT · Claude · Perplexity
Tetris Tower is a project by Le Luminous Real Estate Development L.L.C, recorded at 12% complete at its last Dubai Land Department inspection. 38 sales registered in the trailing 12 months at a median AED 833k (1 602 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 38 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Le Luminous Real Estate Development L.L.C |
| Status | Active |
| Construction progress | 12% — at the last DLD inspection |
| Registered with DLD | 30 Jan 2026 |
| Construction started | 20 Apr 2025 |
| Declared completion | 30 Sep 2027 — registry date, not a handover promise |
| Units in the project | 205 |
| Project area | 14 136 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 3646 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 4 technical inspections for this project, from 3 Apr 2025 at 0.0% to 16 Nov 2026 at 12.2%. Over the inspections since 26 Mar 2026 it moved 0.73 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 16 Nov 2026 | 12.2% | +4.2 pp |
| 30 Jul 2026 | 8.1% | +1.5 pp |
| 26 Mar 2026 | 6.6% | +6.6 pp |
| 3 Apr 2025 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
At least 164 of the 203 homes in Tetris Tower (81%) have no off-plan sale registered with the Dubai Land Department yet, as of 23 Nov 2026. The unit register lists 203 homes and DLD has recorded 39 off-plan sale registrations; because that count also includes resales before completion, the true number without a buyer can only be higher. This is not the developer's availability list.
| Homes | No sale yet, at least | In unit register | Registered sales |
|---|---|---|---|
| Studios | 29 | 51 | 22 |
| 1 bedroom | 127 | 137 | 10 |
| 2 bedrooms | 8 | 15 | 7 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios | 21 | AED 735k | 1 666 | 433 sqft | — | — |
| 1-bedroom apartments low sample (10) | 10 | AED 1.18M | 1 569 | 763 sqft | — | — |
| 2-bedroom apartments low sample (7) | 7 | AED 1.71M | 1 418 | 1 227 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 5 Nov 2026 | Studio Flat | Off-plan | 445 sqft | AED 728 882 | 1 639 |
| 29 Oct 2026 | Studio Flat | Off-plan | 428 sqft | AED 712 721 | 1 666 |
| 28 Oct 2026 | 1 B/R Flat | Off-plan | 766 sqft | AED 1 160 314 | 1 515 |
| 28 Oct 2026 | Studio Flat | Off-plan | 430 sqft | AED 701 468 | 1 630 |
| 21 Oct 2026 | 1 B/R Flat | Off-plan | 751 sqft | AED 1 189 600 | 1 584 |
| 19 Oct 2026 | Studio Flat | Off-plan | 428 sqft | AED 735 120 | 1 719 |
| 15 Oct 2026 | 2 B/R Flat | Off-plan | 1 198 sqft | AED 1 699 420 | 1 418 |
| 15 Oct 2026 | Studio Flat | Off-plan | 430 sqft | AED 694 579 | 1 614 |
| 15 Oct 2026 | 2 B/R Flat | Off-plan | 1 227 sqft | AED 1 577 159 | 1 286 |
| 13 Oct 2026 | Studio Flat | Off-plan | 441 sqft | AED 728 204 | 1 650 |
| 12 Oct 2026 | 1 B/R Flat | Off-plan | 751 sqft | AED 1 199 593 | 1 597 |
| 2 Oct 2026 | 2 B/R Flat | Off-plan | 1 198 sqft | AED 1 738 350 | 1 451 |
| 2 Oct 2026 | Studio Flat | Off-plan | 413 sqft | AED 664 101 | 1 608 |
| 2 Oct 2026 | Studio Flat | Off-plan | 452 sqft | AED 635 212 | 1 404 |
| 2 Oct 2026 | Studio Flat | Off-plan | 430 sqft | AED 842 110 | 1 956 |
| 2 Oct 2026 | Studio Flat | Off-plan | 456 sqft | AED 723 176 | 1 588 |
| 2 Oct 2026 | 1 B/R Flat | Off-plan | 773 sqft | AED 1 086 909 | 1 406 |
| 2 Oct 2026 | Studio Flat | Off-plan | 433 sqft | AED 750 204 | 1 732 |
| 2 Oct 2026 | 2 B/R Flat | Off-plan | 1 227 sqft | AED 1 941 383 | 1 583 |
| 24 Sep 2026 | 2 B/R Flat | Off-plan | 1 247 sqft | AED 1 706 221 | 1 368 |
| 27 Aug 2026 | 2 B/R Flat | Off-plan | 1 198 sqft | AED 1 682 275 | 1 404 |
| 11 Aug 2026 | Studio Flat | Off-plan | 452 sqft | AED 750 000 | 1 658 |
| 11 Aug 2026 | 1 B/R Flat | Off-plan | 750 sqft | AED 1 166 763 | 1 555 |
| 10 Jun 2026 | Studio Flat | Off-plan | 433 sqft | AED 795 029 | 1 836 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Tetris Tower: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Mar 2026 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 38 | AED 833k | 1 602 | AED 39.64M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Oct 2026 | 18 | AED 796k | 1 592 | 1 467 – 1 645 |
| Sep 2026 | 1 | — | — | — |
| Aug 2026 | 3 | — | — | — |
| Jul 2026 | 0 | — | — | — |
| Jun 2026 | 4 | — | — | — |
| May 2026 | 3 | — | — | — |
| Apr 2026 | 4 | — | — | — |
| Mar 2026 | 5 | AED 1.27M | 1 678 | 1 623 – 1 762 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Jumeirah Village Circle
Questions about Tetris Tower
Who is the developer of Tetris Tower?
The Dubai Land Department project registry lists Le Luminous Real Estate Development L.L.C as the developer of Tetris Tower.
Is Tetris Tower completed?
The DLD registry status of Tetris Tower is Active, 12% complete at the last DLD inspection. The declared completion date in the registry is 30 Sep 2027 — a registry date, not a handover promise.
How many homes are in Tetris Tower?
The DLD registry records 205 units in Tetris Tower. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Tetris Tower?
Over the last 12 complete months the median registered sale in Tetris Tower was AED 833k, or AED 1 602 per sqft, from 38 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Tetris Tower?
The escrow agent recorded by DLD for Tetris Tower is Mashreq Bank Psc.
Where is Tetris Tower?
Tetris Tower is in the Jumeirah Village Circle community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Tetris Tower. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.