Data Dubai

The S Tower

The S TowerFinished100% built95 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about The S Tower: ChatGPT · Claude · Perplexity

The S Tower is a project by Sobha L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 10 sales registered in the trailing 12 months at a median — (3 036 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
AED 3 036/sqft -16.0% y/y
typical range 2 716 – 3 606 AED/sqft
DLD verified
Registered sales
10 -44.4% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 10 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperSobha L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD4 Oct 2022
Construction started5 May 2021
Declared completion30 Jun 2025 — registry date, not a handover promise
Units in the project95
Project area48 604 sqm
Escrow agentMashreq Bank Psc
Project number2408

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

3 1253 1303 135Nov 2022Jan 2023Mar 2023May 2023Jul 2023Sep 2023Nov 2023Jan 2024Mar 2024May 2024Jul 2024Sep 20243 1253 1303 135Nov 2022Jun 2023Jan 2024Aug 2024

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2023: in the 37 months since, no month reached the five registered sales a median needs (40 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 8 technical inspections for this project, from 13 Jun 2022 at 21.4% to 20 May 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2025-06-302022-06-132025-05-20

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
20 May 2025100.0% +5.5 pp
10 Feb 202594.5% +12.2 pp
13 Feb 202482.3% +6.7 pp
27 Jul 202375.6% +14.6 pp
13 Mar 202361.0% +16.0 pp
5 Dec 202245.0% +12.9 pp
20 Sep 202232.1% +10.7 pp
13 Jun 202221.4% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
4-bedroom apartments low sample (10) 10— 3 036 4 815 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
26 Oct 20264 B/R FlatReady 4 815 sqftAED 11 300 000 2 347
24 Sep 20264 B/R FlatReady 4 815 sqftAED 14 200 000 2 949
27 Jul 20264 B/R FlatReady 4 815 sqftAED 13 000 000 2 700
13 Jul 20264 B/R FlatReady 4 815 sqftAED 16 800 000 3 489
27 Apr 20264 B/R FlatReady 5 062 sqftAED 12 600 000 2 489
10 Feb 20264 B/R FlatReady 4 815 sqftAED 17 700 000 3 676
6 Feb 20264 B/R FlatReady 4 815 sqftAED 18 000 000 3 738
3 Feb 20264 B/R FlatReady 4 815 sqftAED 17 550 000 3 645
2 Feb 20264 B/R FlatReady 2 408 sqftAED 7 518 661 3 123
14 Nov 20254 B/R FlatReady 5 062 sqftAED 14 000 000 2 766

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for The S Tower: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

020406020222023202420252026020406020222023202420252026

registered sales per calendar year; the current year is incomplete

YearSalesMedian priceMedian AED/sqftTotal registered value
20269— 3 123AED 7.52M
202516— 3 530AED 0
202416— 3 406AED 0
202366AED 15.04M 3 124AED 514.82M
202213AED 15.04M 3 124AED 165.41M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Sep 20233 —3 124 3 124 – 3 138
Aug 20233 —3 138 3 124 – 3 138
Jul 20235 AED 15.04M3 138 3 124 – 3 138
Jun 20232 —3 138 3 138 – 3 138
May 20233 —— —
Apr 20230 —— —
Mar 20231 —— —
Feb 20234 —3 124 3 124 – 3 124
Jan 202313 AED 15.04M3 124 3 124 – 3 134
Dec 20227 AED 15.04M3 124 3 124 – 3 124
Nov 20224 —3 124 3 124 – 3 124

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 10 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Site A

Questions about The S Tower

Who is the developer of The S Tower?

The Dubai Land Department project registry lists Sobha L.L.C as the developer of The S Tower.

Is The S Tower completed?

The DLD registry status of The S Tower is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 30 Jun 2025 — a registry date, not a handover promise.

How many homes are in The S Tower?

The DLD registry records 95 units in The S Tower.

What is the price per square foot in The S Tower?

Too few sales were registered in The S Tower in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for The S Tower?

The escrow agent recorded by DLD for The S Tower is Mashreq Bank Psc.

Where is The S Tower?

The S Tower is in the Site A community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “The S Tower — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/the-s-tower/”. Reuse is permitted with attribution.