The S Tower
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about The S Tower: ChatGPT · Claude · Perplexity
The S Tower is a project by Sobha L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 10 sales registered in the trailing 12 months at a median — (3 036 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 10 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Sobha L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 4 Oct 2022 |
| Construction started | 5 May 2021 |
| Declared completion | 30 Jun 2025 — registry date, not a handover promise |
| Units in the project | 95 |
| Project area | 48 604 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 2408 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2023: in the 37 months since, no month reached the five registered sales a median needs (40 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 8 technical inspections for this project, from 13 Jun 2022 at 21.4% to 20 May 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 20 May 2025 | 100.0% | +5.5 pp |
| 10 Feb 2025 | 94.5% | +12.2 pp |
| 13 Feb 2024 | 82.3% | +6.7 pp |
| 27 Jul 2023 | 75.6% | +14.6 pp |
| 13 Mar 2023 | 61.0% | +16.0 pp |
| 5 Dec 2022 | 45.0% | +12.9 pp |
| 20 Sep 2022 | 32.1% | +10.7 pp |
| 13 Jun 2022 | 21.4% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 4-bedroom apartments low sample (10) | 10 | — | 3 036 | 4 815 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 26 Oct 2026 | 4 B/R Flat | Ready | 4 815 sqft | AED 11 300 000 | 2 347 |
| 24 Sep 2026 | 4 B/R Flat | Ready | 4 815 sqft | AED 14 200 000 | 2 949 |
| 27 Jul 2026 | 4 B/R Flat | Ready | 4 815 sqft | AED 13 000 000 | 2 700 |
| 13 Jul 2026 | 4 B/R Flat | Ready | 4 815 sqft | AED 16 800 000 | 3 489 |
| 27 Apr 2026 | 4 B/R Flat | Ready | 5 062 sqft | AED 12 600 000 | 2 489 |
| 10 Feb 2026 | 4 B/R Flat | Ready | 4 815 sqft | AED 17 700 000 | 3 676 |
| 6 Feb 2026 | 4 B/R Flat | Ready | 4 815 sqft | AED 18 000 000 | 3 738 |
| 3 Feb 2026 | 4 B/R Flat | Ready | 4 815 sqft | AED 17 550 000 | 3 645 |
| 2 Feb 2026 | 4 B/R Flat | Ready | 2 408 sqft | AED 7 518 661 | 3 123 |
| 14 Nov 2025 | 4 B/R Flat | Ready | 5 062 sqft | AED 14 000 000 | 2 766 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for The S Tower: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 9 | — | 3 123 | AED 7.52M |
| 2025 | 16 | — | 3 530 | AED 0 |
| 2024 | 16 | — | 3 406 | AED 0 |
| 2023 | 66 | AED 15.04M | 3 124 | AED 514.82M |
| 2022 | 13 | AED 15.04M | 3 124 | AED 165.41M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Sep 2023 | 3 | — | 3 124 | 3 124 – 3 138 |
| Aug 2023 | 3 | — | 3 138 | 3 124 – 3 138 |
| Jul 2023 | 5 | AED 15.04M | 3 138 | 3 124 – 3 138 |
| Jun 2023 | 2 | — | 3 138 | 3 138 – 3 138 |
| May 2023 | 3 | — | — | — |
| Apr 2023 | 0 | — | — | — |
| Mar 2023 | 1 | — | — | — |
| Feb 2023 | 4 | — | 3 124 | 3 124 – 3 124 |
| Jan 2023 | 13 | AED 15.04M | 3 124 | 3 124 – 3 134 |
| Dec 2022 | 7 | AED 15.04M | 3 124 | 3 124 – 3 124 |
| Nov 2022 | 4 | — | 3 124 | 3 124 – 3 124 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 10 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Site A
Questions about The S Tower
Who is the developer of The S Tower?
The Dubai Land Department project registry lists Sobha L.L.C as the developer of The S Tower.
Is The S Tower completed?
The DLD registry status of The S Tower is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 30 Jun 2025 — a registry date, not a handover promise.
How many homes are in The S Tower?
The DLD registry records 95 units in The S Tower.
What is the price per square foot in The S Tower?
Too few sales were registered in The S Tower in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.
Who holds the escrow account for The S Tower?
The escrow agent recorded by DLD for The S Tower is Mashreq Bank Psc.
Where is The S Tower?
The S Tower is in the Site A community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗