Data Dubai

The Valley - Avena 2

The Valley - Avena 2Active43% built332 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about The Valley - Avena 2: ChatGPT · Claude · Perplexity

The Valley - Avena 2 is a project by Emaar Development P.J.S.C., recorded at 43% complete at its last Dubai Land Department inspection. 7 sales registered in the trailing 12 months at a median AED 4.44M (1 269 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 4.44M -0.1% y/y
≈ US$ 1.21M · typical range AED 4.41M – AED 4.66M
DLD verified
Median price per sqft
AED 1 269/sqft -4.3% y/y
typical range 1 108 – 1 337 AED/sqft
DLD verified
Registered sales
7 -95.9% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 7 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperEmaar Development P.J.S.C.
StatusActive
Construction progress43% — at the last DLD inspection
Registered with DLD11 Jul 2024
Construction started23 Jul 2024
Declared completion31 Jul 2028 — registry date, not a handover promise
Units in the project332
Project area109 329 sqm
Escrow agentEmirates Nbd Bank (P.J.S.C)
Project number3159

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 2001 3001 400Aug 2024Oct 2024Dec 2024Feb 2025Apr 2025Jun 2025Aug 2025Oct 2025Dec 2025Feb 20261 2001 3001 400Aug 2024Feb 2025Aug 2025Feb 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Mar 2025: in the 19 months since, no month reached the five registered sales a median needs (17 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 7 technical inspections for this project, from 24 Jun 2024 at 0.0% to 20 Jul 2026 at 42.9%. Over the inspections since 31 Jan 2025 it moved 2.34 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2028-07-312024-06-242026-07-20

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
20 Jul 202642.9% +10.2 pp
31 Mar 202632.6% +14.2 pp
31 Dec 202518.5% +11.2 pp
25 Sep 20257.3% +4.4 pp
10 Jun 20252.8% +1.1 pp
31 Jan 20251.8% +1.8 pp
24 Jun 20240.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
4-bedroom apartments low sample (7) 7AED 4.44M 1 269 3 327 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
19 Oct 20264 B/R VillaOff-plan 4 402 sqftAED 4 577 888 1 040
10 Aug 20264 B/R VillaOff-plan 3 304 sqftAED 4 391 888 1 329
29 Jun 20264 B/R VillaOff-plan 3 233 sqftAED 3 800 000 1 175
25 Dec 20254 B/R VillaOff-plan 5 230 sqftAED 4 750 000 908
4 Dec 20254 B/R VillaOff-plan 3 504 sqftAED 4 444 888 1 269
19 Nov 20254 B/R VillaOff-plan 3 295 sqftAED 4 432 888 1 345
10 Nov 20254 B/R VillaOff-plan 3 327 sqftAED 4 918 888 1 478

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for The Valley - Avena 2: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

01002002024202520260100200202420252026

registered sales per calendar year; the current year is incomplete

By month

0123AprMayJunJulAugSepOctNovDecJanFebMar0123MayJulSepNovJanMar

registered sales per month, Apr 2025 – Mar 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20263— —AED 12.77M
202565AED 4.43M 1 345AED 292.06M
2024271AED 4.52M 1 310AED 1.23B

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Mar 202514 AED 4.43M1 366 1 345 – 1 371
Feb 202528 AED 4.43M1 341 1 288 – 1 369
Jan 20259 AED 4.42M1 345 1 289 – 1 358
Dec 202461 AED 4.46M1 293 1 261 – 1 357
Nov 202450 AED 4.50M1 316 1 273 – 1 378
Oct 202474 AED 4.55M1 240 1 153 – 1 342
Sep 202468 AED 4.73M1 337 1 139 – 1 427
Aug 202418 AED 4.53M1 327 1 314 – 1 436

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 7 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in The Valley

Questions about The Valley - Avena 2

Who is the developer of The Valley - Avena 2?

The Dubai Land Department project registry lists Emaar Development P.J.S.C. as the developer of The Valley - Avena 2.

Is The Valley - Avena 2 completed?

The DLD registry status of The Valley - Avena 2 is Active, 43% complete at the last DLD inspection. The declared completion date in the registry is 31 Jul 2028 — a registry date, not a handover promise.

How many homes are in The Valley - Avena 2?

The DLD registry records 332 units in The Valley - Avena 2.

What is the price per square foot in The Valley - Avena 2?

Over the last 12 complete months the median registered sale in The Valley - Avena 2 was AED 4.44M, or AED 1 269 per sqft, from 7 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for The Valley - Avena 2?

The escrow agent recorded by DLD for The Valley - Avena 2 is Emirates Nbd Bank (P.J.S.C).

Where is The Valley - Avena 2?

The Valley - Avena 2 is in the The Valley community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “The Valley - Avena 2 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/the-valley-avena-2/”. Reuse is permitted with attribution.