DubaiData

Tiger Sky Tower

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Tiger Sky Tower is a project by Tiger Properties, recorded at 10% complete at its last Dubai Land Department inspection. 174 sales registered in the trailing 12 months at a median AED 3.13M (2 403 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 3.13M +16.9%
IQR AED 2.63M – AED 3.98M
DLD verified
Median price per sqft
AED 2 403/sqft -9.6%
IQR 2 094 – 2 798 AED/sqft
DLD verified
Registered sales
174 +29.9%
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 174 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperTiger Properties DLD verified
StatusActive DLD verified
Construction progress10% — at the last DLD inspection DLD verified
Registered with DLD16 May 2024 DLD verified
Construction started1 May 2024 DLD verified
Units in the project849 DLD verified
Project area138 381 sqm DLD verified
Escrow agentEmirates Nbd Bank (P.J.S.C) DLD verified
Project number2579 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

2 0002 5003 000Oct 2024Jan 2025Apr 2025Jul 2025Oct 2025Jan 2026Apr 2026Jul 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at May 2026: in the 4 months since, no month reached the five registered sales a median needs (5 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 8 technical inspections for this project, from 14 May 2024 at 2.8% to 10 Sep 2026 at 10.2%. Since 4 Jul 2025 the recorded percentage has moved 0.24 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%2024-05-142026-09-10

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
10 Sep 202610.2% +0.9 pp
21 May 20269.3% +2.2 pp
31 Dec 20257.1% -0.2 pp
31 Dec 20257.3% +0.5 pp
4 Jul 20256.8% +1.0 pp
21 Jan 20255.8% +3.1 pp
14 May 20242.8% +0.0 pp
14 May 20242.8% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
May 20265 AED 4.17M2 910 2 880 – 2 960
Apr 20261 —— —
Mar 20260 —— —
Feb 202610 AED 3.93M2 770 2 597 – 2 886
Jan 202613 AED 4.03M2 820 2 810 – 2 870
Dec 202525 AED 3.12M2 107 2 051 – 2 366
Nov 202570 AED 2.90M2 100 2 027 – 2 433
Oct 202545 AED 3.22M2 619 2 375 – 2 760
Sep 202526 AED 3.08M2 521 2 376 – 2 697
Aug 202510 AED 2.41M2 638 2 523 – 2 685
Jul 202517 AED 2.55M2 544 2 184 – 2 722
Jun 20257 AED 2.59M2 710 2 621 – 2 821
May 20257 AED 3.44M2 128 1 912 – 2 202

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments 48AED 2.23M 2 556 893 sqft — —
2-bedroom apartments 102AED 3.43M 2 356 1 442 sqft — —
3-bedroom apartments low sample (18) 18AED 4.09M 2 135 1 914 sqft — —
4-bedroom apartments low sample (6) 6AED 7.54M 2 636 2 728 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

01002002021202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202634AED 4.00M 2 825AED 136.48M
2025211AED 2.97M 2 384AED 678.93M
202468AED 2.68M 2 817AED 212.41M
20212— —AED 44.28M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
1 Sep 20262 B/R Flat — Tiger Sky TowerOff-plan 1 481 sqftAED 4 135 548 2 793
1 Sep 20261 B/R Flat — Tiger Sky TowerOff-plan 912 sqftAED 2 680 933 2 939
24 Aug 20262 B/R Flat — Tiger Sky TowerOff-plan 1 442 sqftAED 3 362 402 2 331
9 Jun 20261 B/R Flat — Tiger Sky TowerOff-plan 873 sqftAED 2 836 929 3 249
9 Jun 20262 B/R Flat — Tiger Sky TowerOff-plan 1 400 sqftAED 2 726 292 1 948
21 May 20262 B/R Flat — Tiger Sky TowerOff-plan 1 473 sqftAED 4 359 883 2 960
18 May 20262 B/R Flat — Tiger Sky TowerOff-plan 1 473 sqftAED 4 242 048 2 880
18 May 20262 B/R Flat — Tiger Sky TowerOff-plan 1 400 sqftAED 4 073 240 2 910
18 May 20262 B/R Flat — Tiger Sky TowerOff-plan 1 400 sqftAED 3 300 165 2 358
18 May 20262 B/R Flat — Tiger Sky TowerOff-plan 1 400 sqftAED 4 171 221 2 980
22 Apr 20262 B/R Flat — Tiger Sky TowerOff-plan 1 439 sqftAED 3 880 476 2 697
26 Feb 20262 B/R Flat — Tiger Sky TowerOff-plan 1 400 sqftAED 3 202 743 2 288

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Business Bay

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Tiger Sky Tower — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/tiger-sky-tower/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Tiger Sky Tower. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.