Al Jawhara Tower
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Al Jawhara Tower: ChatGPT · Claude · Perplexity
Al Jawhara Tower is a project by Tiger Properties, recorded at 100% complete at its last Dubai Land Department inspection. 34 sales registered in the trailing 12 months at a median AED 510k (1 145 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 34 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Tiger Properties |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 5 Sep 2016 |
| Construction started | 31 Aug 2016 |
| Declared completion | 12 Mar 2020 — registry date, not a handover promise |
| Units in the project | 532 |
| Project area | 22 696 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 1782 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Feb 2026: in the 8 months since, no month reached the five registered sales a median needs (11 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 8 technical inspections for this project, from 25 Sep 2017 at 6.1% to 12 Mar 2020 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 12 Mar 2020 | 100.0% | +5.0 pp |
| 19 Jan 2020 | 95.0% | +19.5 pp |
| 6 Aug 2019 | 75.5% | +24.3 pp |
| 13 Mar 2019 | 51.2% | +16.5 pp |
| 3 Oct 2018 | 34.7% | +9.5 pp |
| 20 May 2018 | 25.2% | +7.8 pp |
| 18 Feb 2018 | 17.4% | +11.3 pp |
| 25 Sep 2017 | 6.1% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios | 34 | AED 510k | 1 145 | 458 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 2 Nov 2026 | Studio Flat | Ready | 436 sqft | AED 440 000 | 1 010 |
| 21 Oct 2026 | Studio Flat | Ready | 391 sqft | AED 485 000 | 1 241 |
| 21 Aug 2026 | Studio Flat | Ready | 467 sqft | AED 440 000 | 942 |
| 15 Jun 2026 | Studio Flat | Ready | 472 sqft | AED 535 000 | 1 132 |
| 12 Jun 2026 | Studio Flat | Ready | 392 sqft | AED 475 000 | 1 211 |
| 18 May 2026 | Studio Flat | Ready | 437 sqft | AED 499 999 | 1 145 |
| 6 May 2026 | Studio Flat | Ready | 583 sqft | AED 595 000 | 1 021 |
| 5 May 2026 | Studio Flat | Ready | 370 sqft | AED 425 000 | 1 150 |
| 21 Apr 2026 | Studio Flat | Ready | 470 sqft | AED 500 000 | 1 065 |
| 10 Mar 2026 | Studio Flat | Ready | 447 sqft | AED 510 000 | 1 142 |
| 9 Mar 2026 | Studio Flat | Ready | 370 sqft | AED 450 000 | 1 218 |
| 4 Mar 2026 | Studio Flat | Ready | 468 sqft | AED 550 000 | 1 176 |
| 25 Feb 2026 | Studio Flat | Ready | 582 sqft | AED 600 000 | 1 031 |
| 23 Feb 2026 | Studio Flat | Ready | 444 sqft | AED 530 000 | 1 193 |
| 23 Feb 2026 | Studio Flat | Ready | 394 sqft | AED 500 000 | 1 270 |
| 23 Feb 2026 | Studio Flat | Ready | 392 sqft | AED 475 000 | 1 211 |
| 17 Feb 2026 | Studio Flat | Ready | 467 sqft | AED 520 000 | 1 114 |
| 13 Feb 2026 | Studio Flat | Ready | 435 sqft | AED 540 000 | 1 242 |
| 10 Feb 2026 | Studio Flat | Ready | 473 sqft | AED 550 000 | 1 162 |
| 10 Feb 2026 | Studio Flat | Ready | 457 sqft | AED 540 000 | 1 180 |
| 6 Feb 2026 | Studio Flat | Ready | 393 sqft | AED 450 000 | 1 144 |
| 6 Feb 2026 | Studio Flat | Ready | 476 sqft | AED 525 000 | 1 102 |
| 2 Feb 2026 | Studio Flat | Ready | 458 sqft | AED 528 000 | 1 153 |
| 30 Jan 2026 | Studio Flat | Ready | 370 sqft | AED 414 000 | 1 120 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Al Jawhara Tower: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 26 | AED 512k | 1 152 | AED 13.15M |
| 2025 | 72 | AED 483k | 1 046 | AED 35.72M |
| 2024 | 65 | AED 450k | 984 | AED 30.56M |
| 2023 | 77 | AED 380k | 800 | AED 30.19M |
| 2022 | 60 | AED 336k | 655 | AED 11.08M |
| 2021 | 33 | AED 504k | 927 | AED 15.70M |
| 2020 | 57 | AED 443k | 981 | AED 24.07M |
| 2019 | 51 | AED 478k | 1 052 | AED 24.24M |
| 2018 | 59 | AED 512k | 1 152 | AED 30.15M |
| 2017 | 179 | AED 483k | 1 155 | AED 87.95M |
| 2015 | 2 | — | — | AED 73.25M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2020–2026
Studio: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | Studio | Gross yield |
|---|---|---|
| 2026 YTD | 42k | 8.24% |
| 2025 | 42k | 8.70% |
| 2024 | 37k | 8.12% |
| 2023 | 31k | 8.11% |
| 2022 | 26k | 7.73% |
| 2021 | 23k | 4.56% |
| 2020 | 22k | 5.50% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Feb 2026 | 11 | AED 528k | 1 162 | 1 129 – 1 202 |
| Jan 2026 | 4 | — | — | — |
| Dec 2025 | 3 | — | — | — |
| Nov 2025 | 4 | — | — | — |
| Oct 2025 | 4 | — | — | — |
| Sep 2025 | 6 | AED 480k | 1 029 | 993 – 1 110 |
| Aug 2025 | 4 | — | — | — |
| Jul 2025 | 3 | — | — | — |
| Jun 2025 | 6 | AED 515k | 1 106 | 949 – 1 148 |
| May 2025 | 4 | — | — | — |
| Apr 2025 | 4 | — | — | — |
| Mar 2025 | 4 | — | — | — |
| Feb 2025 | 3 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
8 projects with a page on this site are registered within 1.2 km of Al Jawhara Tower. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Plazzo Residence Finished · Plazzo Development Real Estate L.L.C |
202 m | 100% |
| Silver Stallions Active · Dot Life Real Estate Development L.L.C |
397 m | 12% |
| Park One Finished · Swiss Property Development L.L.C |
479 m | 100% |
| Edmonton Elm Finished · Edmonton Admire Properties Limited |
575 m | 100% |
| Golden Wood Views Finished · Golden Wood Real Estate Development L.L.C |
656 m | 100% |
| Magnolia Cancelled · Syndicate Developer Limited |
778 m | 96% |
| Jumeirah Park - Package 5a Finished · Jumeirah Park (L.L.C) |
798 m | 100% |
| The Community Finished · Aqua Real Estate Development L.L.C |
992 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Jumeirah Village Triangle
Questions about Al Jawhara Tower
Who is the developer of Al Jawhara Tower?
The Dubai Land Department project registry lists Tiger Properties as the developer of Al Jawhara Tower.
Is Al Jawhara Tower completed?
The DLD registry status of Al Jawhara Tower is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 12 Mar 2020 — a registry date, not a handover promise.
How many homes are in Al Jawhara Tower?
The DLD registry records 532 units in Al Jawhara Tower.
What is the price per square foot in Al Jawhara Tower?
Over the last 12 complete months the median registered sale in Al Jawhara Tower was AED 510k, or AED 1 145 per sqft, from 34 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Al Jawhara Tower?
The escrow agent recorded by DLD for Al Jawhara Tower is Abu Dhabi Commercial Bank.
Where is Al Jawhara Tower?
Al Jawhara Tower is in the Jumeirah Village Triangle community. 8 other projects with a page on this site are registered within 1.2 km; the closest is Plazzo Residence, about 202 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗