Edmonton Elm
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Edmonton Elm: ChatGPT · Claude · Perplexity
Edmonton Elm is a project by Edmonton Admire Properties Limited, recorded at 100% complete at its last Dubai Land Department inspection. 13 sales registered in the trailing 12 months at a median AED 680k (860 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 13 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Edmonton Admire Properties Limited |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 8 Nov 2008 |
| Construction started | 10 May 2009 |
| Declared completion | 20 May 2021 — registry date, not a handover promise |
| Units in the project | 65 |
| Project area | 5 409 sqm |
| Escrow agent | Dubai Islamic Bank (Public Joint Stock Company) |
| Project number | 871 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2023: in the 38 months since, no month reached the five registered sales a median needs (49 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 8 technical inspections for this project, from 23 Aug 2012 at 14.4% to 20 May 2021 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 20 May 2021 | 100.0% | +21.7 pp |
| 29 Sep 2015 | 78.3% | +28.0 pp |
| 30 Dec 2014 | 50.3% | +18.8 pp |
| 14 Sep 2014 | 31.5% | +4.0 pp |
| 13 May 2014 | 27.5% | +9.0 pp |
| 10 Oct 2013 | 18.5% | +3.5 pp |
| 28 Jan 2013 | 15.0% | +0.6 pp |
| 23 Aug 2012 | 14.4% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (6) | 6 | AED 560k | 873 | 636 sqft | — | — |
| 1-bedroom apartments insufficient data | 4 | — | — | — | — | — |
| 2-bedroom apartments insufficient data | 2 | — | — | — | — | — |
| 3-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 5 Oct 2026 | 1 B/R Flat | Ready | 791 sqft | AED 605 000 | 765 |
| 20 Aug 2026 | 1 B/R Flat | Ready | 840 sqft | AED 750 000 | 893 |
| 14 Aug 2026 | Studio Flat | Ready | 630 sqft | AED 550 000 | 873 |
| 17 Jul 2026 | Studio Flat | Ready | 642 sqft | AED 560 000 | 872 |
| 13 Jul 2026 | 3 B/R Flat | Ready | 2 390 sqft | AED 1 900 000 | 795 |
| 24 Jun 2026 | Studio Flat | Ready | 542 sqft | AED 580 000 | 1 070 |
| 19 Jun 2026 | 2 B/R Flat | Ready | 1 145 sqft | AED 1 150 000 | 1 004 |
| 14 May 2026 | Studio Flat | Ready | 631 sqft | AED 497 151 | 788 |
| 6 Apr 2026 | 1 B/R Flat | Ready | 791 sqft | AED 680 000 | 859 |
| 19 Feb 2026 | 2 B/R Flat | Ready | 1 229 sqft | AED 1 040 000 | 846 |
| 16 Feb 2026 | Studio Flat | Ready | 861 sqft | AED 1 200 000 | 1 394 |
| 24 Nov 2025 | Studio Flat | Ready | 650 sqft | AED 559 256 | 860 |
| 12 Nov 2025 | 1 B/R Flat | Ready | 919 sqft | AED 750 000 | 816 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Edmonton Elm: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Sep 2023 – Aug 2024
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 11 | AED 680k | 872 | AED 9.51M |
| 2025 | 17 | AED 650k | 867 | AED 13.59M |
| 2024 | 15 | AED 600k | 802 | AED 13.13M |
| 2023 | 24 | AED 495k | 686 | AED 13.13M |
| 2022 | 12 | AED 372k | 486 | AED 4.57M |
| 2021 | 5 | AED 300k | 457 | AED 1.87M |
| 2019 | 2 | — | — | AED 610k |
| 2018 | 1 | — | — | AED 991k |
| 2017 | 12 | AED 615k | 796 | AED 7.57M |
| 2016 | 50 | AED 576k | 687 | AED 29.80M |
| 2015 | 22 | AED 715k | 847 | AED 19.16M |
| 2014 | 2 | — | — | AED 1.46M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent by year, 2021–2024
| Year | Studio |
|---|---|
| 2024 | 47k |
| 2022 | 30k |
| 2021 | 27k |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2023 | 5 | AED 330k | 688 | 686 – 692 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 13 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Edmonton Elm. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Golden Wood Views Finished · Golden Wood Real Estate Development L.L.C |
91 m | 100% |
| Magnolia Cancelled · Syndicate Developer Limited |
216 m | 96% |
| Plazzo Residence Finished · Plazzo Development Real Estate L.L.C |
380 m | 100% |
| The Community Finished · Aqua Real Estate Development L.L.C |
437 m | 100% |
| Al Jawhara Tower Finished · Tiger Properties |
575 m | 100% |
| Terhab Hotel & Towers At Jumeirah Village Triangle Finished · Manazil Global Property Development L.L.C |
654 m | 100% |
| Green Park Finished · Island Oasis Properties |
809 m | 100% |
| Cavendish Square Active · Leos Development L.L.C |
837 m | 5% |
| Silver Stallions Active · Dot Life Real Estate Development L.L.C |
968 m | 12% |
| Point Residencia Cancelled · Pacific Ventures Limited |
1,049 m | 92% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Jumeirah Village Triangle
Questions about Edmonton Elm
Who is the developer of Edmonton Elm?
The Dubai Land Department project registry lists Edmonton Admire Properties Limited as the developer of Edmonton Elm.
Is Edmonton Elm completed?
The DLD registry status of Edmonton Elm is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 20 May 2021 — a registry date, not a handover promise.
How many homes are in Edmonton Elm?
The DLD registry records 65 units in Edmonton Elm.
What is the price per square foot in Edmonton Elm?
Over the last 12 complete months the median registered sale in Edmonton Elm was AED 680k, or AED 860 per sqft, from 13 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Edmonton Elm?
The escrow agent recorded by DLD for Edmonton Elm is Dubai Islamic Bank (Public Joint Stock Company).
Where is Edmonton Elm?
Edmonton Elm is in the Jumeirah Village Triangle community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Golden Wood Views, about 91 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗