Data Dubai

Aryam Tower By Abu Alnaga

Aryam Tower By Abu AlnagaActive33% built68 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Aryam Tower By Abu Alnaga: ChatGPT · Claude · Perplexity

Aryam Tower By Abu Alnaga is a project by Abualnaga Development L.L.C, recorded at 33% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
1
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 1 record · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAbualnaga Development L.L.C
StatusActive
Construction progress33% — at the last DLD inspection
Registered with DLD9 Jul 2026
Construction started1 Nov 2025
Declared completion30 Jun 2028 — registry date, not a handover promise
Units in the project68
Project area11 188 sqm
Escrow agentMashreq Bank Psc
Project number4488

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 8 Jun 2026 at 17.4% to 29 Sep 2026 at 33.2%. Over the inspections since 8 Jun 2026 it moved 4.26 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2028-06-302026-06-082026-09-29

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
29 Sep 202633.2% +13.2 pp
1 Jul 202620.0% +2.6 pp
8 Jun 202617.4% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Homes and registered off-plan sales

At least 65 of the 66 homes in Aryam Tower By Abu Alnaga (98%) have no off-plan sale registered with the Dubai Land Department yet, as of 23 Nov 2026. The unit register lists 66 homes and DLD has recorded 1 off-plan sale registrations; because that count also includes resales before completion, the true number without a buyer can only be higher. This is not the developer's availability list.

HomesNo sale yet,
at least
In unit
register
Registered
sales
1 bedroom18191
2 bedrooms36360
3 bedrooms11110

Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗

Homes without a registered sale in all Dubai off-plan projects →

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
13 Jul 20261 B/R Flat — Aryam towerOff-plan 941 sqftAED 2 164 024 2 300

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Aryam Tower By Abu Alnaga: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

00120260012026

registered sales per calendar year; the current year is incomplete

By month

001NovDecJanFebMarAprMayJunJulAugSepOct001DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20261— —AED 2.16M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 1 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Al Furjan

Questions about Aryam Tower By Abu Alnaga

Who is the developer of Aryam Tower By Abu Alnaga?

The Dubai Land Department project registry lists Abualnaga Development L.L.C as the developer of Aryam Tower By Abu Alnaga.

Is Aryam Tower By Abu Alnaga completed?

The DLD registry status of Aryam Tower By Abu Alnaga is Active, 33% complete at the last DLD inspection. The declared completion date in the registry is 30 Jun 2028 — a registry date, not a handover promise.

How many homes are in Aryam Tower By Abu Alnaga?

The DLD registry records 68 units in Aryam Tower By Abu Alnaga. The split by number of bedrooms is in the unit register table on this page.

What is the price per square foot in Aryam Tower By Abu Alnaga?

Too few sales were registered in Aryam Tower By Abu Alnaga in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Aryam Tower By Abu Alnaga?

The escrow agent recorded by DLD for Aryam Tower By Abu Alnaga is Mashreq Bank Psc.

Where is Aryam Tower By Abu Alnaga?

Aryam Tower By Abu Alnaga is in the Al Furjan community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Aryam Tower By Abu Alnaga — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/aryam-tower-by-abu-alnaga/”. Reuse is permitted with attribution.