Avant Garde Residences By Skyline
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Avant Garde Residences By Skyline: ChatGPT · Claude · Perplexity
Avant Garde Residences By Skyline is a project by Skyline Builders Real Estate L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 3 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Skyline Builders Real Estate L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 23 Nov 2023 |
| Construction started | 14 Nov 2023 |
| Units in the project | 174 |
| Project area | 12 677 sqm |
| Escrow agent | First Abu Dhabi Bank P.J.S.C. |
| Project number | 2798 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jun 2025: in the 16 months since, no month reached the five registered sales a median needs (4 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 10 technical inspections for this project, from 11 Oct 2023 at 0.0% to 24 Aug 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 24 Aug 2026 | 100.0% | +3.6 pp |
| 2 Jul 2026 | 96.4% | +10.0 pp |
| 31 Mar 2026 | 86.3% | +16.3 pp |
| 30 Dec 2025 | 70.1% | +11.0 pp |
| 19 Sep 2025 | 59.1% | +8.3 pp |
| 24 Jun 2025 | 50.8% | +21.1 pp |
| 13 Feb 2025 | 29.6% | +14.0 pp |
| 30 Oct 2024 | 15.7% | +12.0 pp |
| 10 Jun 2024 | 3.7% | +3.7 pp |
| 11 Oct 2023 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 1 | — | — | — | — | — |
| 1-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 16 Oct 2026 | Studio Flat | Ready | 392 sqft | AED 730 000 | 1 864 |
| 15 Oct 2026 | 1 B/R Flat | Ready | 848 sqft | AED 1 050 000 | 1 238 |
| 8 Oct 2026 | 1 B/R Flat | Ready | 880 sqft | AED 935 000 | 1 062 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Avant Garde Residences By Skyline: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Jul 2025 – Jun 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 3 | — | — | AED 2.71M |
| 2025 | 30 | AED 798k | 1 563 | AED 25.04M |
| 2024 | 151 | AED 1.05M | 1 249 | AED 152.16M |
| 2023 | 1 | — | — | AED 15.60M |
| 2020 | 1 | — | — | AED 3.42M |
| 2015 | 1 | — | — | AED 18.38M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jun 2025 | 10 | AED 935k | 1 051 | 1 051 – 1 051 |
| May 2025 | 11 | AED 776k | 1 686 | 1 668 – 1 718 |
| Apr 2025 | 0 | — | — | — |
| Mar 2025 | 2 | — | — | — |
| Feb 2025 | 3 | — | — | — |
| Jan 2025 | 3 | — | — | — |
| Dec 2024 | 19 | AED 1.14M | 1 309 | 1 285 – 1 499 |
| Nov 2024 | 15 | AED 1.09M | 1 257 | 1 232 – 1 393 |
| Oct 2024 | 7 | AED 1.08M | 1 260 | 1 236 – 1 279 |
| Sep 2024 | 4 | — | — | — |
| Aug 2024 | 12 | AED 975k | 1 298 | 1 176 – 1 541 |
| Jul 2024 | 31 | AED 1.03M | 1 252 | 1 198 – 1 649 |
| Jun 2024 | 12 | AED 863k | 1 383 | 1 189 – 1 515 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 3 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Jumeirah Village Circle
Questions about Avant Garde Residences By Skyline
Who is the developer of Avant Garde Residences By Skyline?
The Dubai Land Department project registry lists Skyline Builders Real Estate L.L.C as the developer of Avant Garde Residences By Skyline.
Is Avant Garde Residences By Skyline completed?
The DLD registry status of Avant Garde Residences By Skyline is Finished, 100% complete at the last DLD inspection.
How many homes are in Avant Garde Residences By Skyline?
The DLD registry records 174 units in Avant Garde Residences By Skyline.
What is the price per square foot in Avant Garde Residences By Skyline?
Too few sales were registered in Avant Garde Residences By Skyline in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.
Who holds the escrow account for Avant Garde Residences By Skyline?
The escrow agent recorded by DLD for Avant Garde Residences By Skyline is First Abu Dhabi Bank P.J.S.C..
Where is Avant Garde Residences By Skyline?
Avant Garde Residences By Skyline is in the Jumeirah Village Circle community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Cite or reuse this data
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Avant Garde Residences By Skyline — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/avant-garde-residences-by-skyline/”. Reuse is permitted with attribution.