Avenue Residence 6
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Avenue Residence 6: ChatGPT · Claude · Perplexity
Avenue Residence 6 is a project by Nabni Real Estate Development L.L.C, recorded at 82% complete at its last Dubai Land Department inspection. 9 sales registered in the trailing 12 months at a median AED 1.85M (1 440 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 9 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Nabni Real Estate Development L.L.C |
| Status | Active |
| Construction progress | 82% — at the last DLD inspection |
| Registered with DLD | 29 Feb 2024 |
| Construction started | 1 Feb 2024 |
| Units in the project | 96 |
| Project area | 12 031 sqm |
| Escrow agent | Sharjah Islamic Bank |
| Project number | 2936 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2024: in the 27 months since, no month reached the five registered sales a median needs (17 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 1 Feb 2024 at 0.0% to 30 Apr 2026 at 82.3%. Over the inspections since 30 Jun 2025 it moved 6.23 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 30 Apr 2026 | 82.3% | +21.7 pp |
| 15 Jan 2026 | 60.5% | +25.8 pp |
| 13 Oct 2025 | 34.7% | +14.6 pp |
| 30 Jun 2025 | 20.1% | +13.5 pp |
| 14 Oct 2024 | 6.6% | +6.6 pp |
| 1 Feb 2024 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
Off-plan sale registrations in Avenue Residence 6 (107) already equal 100% of the 96 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.
| Homes | In unit register | Registered sales |
|---|---|---|
| 1 bedroom | 30 | 33 |
| 2 bedrooms | 56 | 64 |
| 3 bedrooms | 10 | 10 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments insufficient data | 3 | — | — | — | — | — |
| 2-bedroom apartments low sample (6) | 6 | AED 1.90M | 1 372 | 1 355 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 5 Oct 2026 | 2 B/R Flat | Off-plan | 1 368 sqft | AED 2 030 000 | 1 484 |
| 2 Oct 2026 | 2 B/R Flat | Off-plan | 1 239 sqft | AED 1 930 000 | 1 558 |
| 21 Sep 2026 | 1 B/R Flat | Off-plan | 818 sqft | AED 1 178 794 | 1 440 |
| 7 Jul 2026 | 2 B/R Flat | Off-plan | 1 239 sqft | AED 1 850 000 | 1 493 |
| 29 Jun 2026 | 2 B/R Flat | Off-plan | 1 589 sqft | AED 1 875 000 | 1 180 |
| 10 Apr 2026 | 2 B/R Flat | Off-plan | 1 589 sqft | AED 1 955 000 | 1 231 |
| 6 Mar 2026 | 1 B/R Flat | Off-plan | 818 sqft | AED 1 182 558 | 1 445 |
| 20 Feb 2026 | 2 B/R Flat | Off-plan | 1 342 sqft | AED 1 691 381 | 1 260 |
| 16 Feb 2026 | 1 B/R Flat | Off-plan | 1 024 sqft | AED 1 366 569 | 1 335 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Avenue Residence 6: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Aug 2024 – Jul 2025
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 9 | AED 1.85M | 1 440 | AED 15.06M |
| 2025 | 2 | — | — | AED 3.77M |
| 2024 | 96 | AED 1.70M | 1 280 | AED 161.84M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2024 | 7 | AED 1.70M | 1 361 | 1 347 – 1 374 |
| Jun 2024 | 8 | AED 1.70M | 1 212 | 1 152 – 1 275 |
| May 2024 | 9 | AED 1.71M | 1 260 | 1 240 – 1 349 |
| Apr 2024 | 22 | AED 1.68M | 1 275 | 1 260 – 1 331 |
| Mar 2024 | 44 | AED 1.69M | 1 285 | 1 260 – 1 310 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 9 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Al Furjan
Questions about Avenue Residence 6
Who is the developer of Avenue Residence 6?
The Dubai Land Department project registry lists Nabni Real Estate Development L.L.C as the developer of Avenue Residence 6.
Is Avenue Residence 6 completed?
The DLD registry status of Avenue Residence 6 is Active, 82% complete at the last DLD inspection.
How many homes are in Avenue Residence 6?
The DLD registry records 96 units in Avenue Residence 6. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Avenue Residence 6?
Over the last 12 complete months the median registered sale in Avenue Residence 6 was AED 1.85M, or AED 1 440 per sqft, from 9 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Avenue Residence 6?
The escrow agent recorded by DLD for Avenue Residence 6 is Sharjah Islamic Bank.
Where is Avenue Residence 6?
Avenue Residence 6 is in the Al Furjan community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗