Azizi Amber
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Azizi Amber: ChatGPT · Claude · Perplexity
Azizi Amber is a project by Azizi Developments L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 15 sales registered in the trailing 12 months at a median AED 1.39M (1 339 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 15 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Azizi Developments L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 26 Apr 2023 |
| Construction started | 23 Mar 2023 |
| Declared completion | 31 Jul 2025 — registry date, not a handover promise |
| Units in the project | 115 |
| Project area | 8 138 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 2624 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2025: in the 15 months since, no month reached the five registered sales a median needs (23 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 3 technical inspections for this project, from 29 Mar 2023 at 10.4% to 23 Dec 2024 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 23 Dec 2024 | 100.0% | +2.9 pp |
| 26 Aug 2024 | 97.1% | +86.7 pp |
| 29 Mar 2023 | 10.4% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 2 | — | — | — | — | — |
| 2-bedroom apartments low sample (7) | 7 | AED 1.30M | 1 316 | 985 sqft | — | — |
| 3-bedroom apartments low sample (6) | 6 | AED 1.75M | 1 337 | 1 261 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 4 Nov 2026 | Studio Flat | Ready | 365 sqft | AED 550 000 | 1 506 |
| 8 Sep 2026 | Studio Flat | Ready | 365 sqft | AED 600 000 | 1 642 |
| 3 Aug 2026 | Studio Flat | Ready | 376 sqft | AED 657 660 | 1 749 |
| 17 Jun 2026 | 2 B/R Flat | Ready | 985 sqft | AED 1 190 000 | 1 209 |
| 4 Jun 2026 | 2 B/R Flat | Ready | 974 sqft | AED 1 435 500 | 1 473 |
| 13 May 2026 | 3 B/R Flat | Ready | 1 261 sqft | AED 1 811 040 | 1 436 |
| 11 Mar 2026 | 2 B/R Flat | Ready | 988 sqft | AED 1 300 000 | 1 316 |
| 6 Mar 2026 | 3 B/R Flat | Ready | 1 261 sqft | AED 1 660 000 | 1 316 |
| 23 Feb 2026 | 3 B/R Flat | Ready | 1 261 sqft | AED 1 810 160 | 1 435 |
| 23 Feb 2026 | 2 B/R Flat | Ready | 985 sqft | AED 1 329 680 | 1 350 |
| 28 Jan 2026 | 2 B/R Flat | Ready | 974 sqft | AED 1 390 000 | 1 427 |
| 27 Jan 2026 | 3 B/R Flat | Ready | 1 534 sqft | AED 2 047 610 | 1 335 |
| 8 Dec 2025 | 2 B/R Flat | Ready | 988 sqft | AED 1 200 000 | 1 214 |
| 3 Dec 2025 | 3 B/R Flat | Ready | 1 261 sqft | AED 1 689 251 | 1 339 |
| 25 Nov 2025 | 2 B/R Flat | Ready | 992 sqft | AED 1 200 000 | 1 209 |
| 10 Nov 2025 | 3 B/R Flat | Ready | 1 261 sqft | AED 1 681 776 | 1 333 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Azizi Amber: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Aug 2025 – Jul 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 11 | AED 1.39M | 1 427 | AED 15.23M |
| 2025 | 43 | AED 1.32M | 1 352 | AED 57.58M |
| 2024 | 76 | AED 857k | 1 422 | AED 69.42M |
| 2023 | 1 | — | — | AED 968k |
| 2016 | 1 | — | — | AED 13.31M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2025 | 5 | AED 1.36M | 1 332 | 1 310 – 1 537 |
| Jun 2025 | 1 | — | — | — |
| May 2025 | 1 | — | — | — |
| Apr 2025 | 4 | — | — | — |
| Mar 2025 | 4 | — | — | — |
| Feb 2025 | 3 | — | — | — |
| Jan 2025 | 13 | AED 1.39M | 1 433 | 1 372 – 1 509 |
| Dec 2024 | 3 | — | — | — |
| Nov 2024 | 4 | — | — | — |
| Oct 2024 | 37 | AED 989k | 1 405 | 1 294 – 1 475 |
| Sep 2024 | 8 | AED 863k | 1 352 | 1 322 – 1 451 |
| Aug 2024 | 18 | AED 565k | 1 479 | 1 415 – 1 487 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 15 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Al Furjan
Questions about Azizi Amber
Who is the developer of Azizi Amber?
The Dubai Land Department project registry lists Azizi Developments L.L.C as the developer of Azizi Amber.
Is Azizi Amber completed?
The DLD registry status of Azizi Amber is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 31 Jul 2025 — a registry date, not a handover promise.
How many homes are in Azizi Amber?
The DLD registry records 115 units in Azizi Amber.
What is the price per square foot in Azizi Amber?
Over the last 12 complete months the median registered sale in Azizi Amber was AED 1.39M, or AED 1 339 per sqft, from 15 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Azizi Amber?
The escrow agent recorded by DLD for Azizi Amber is Abu Dhabi Commercial Bank.
Where is Azizi Amber?
Azizi Amber is in the Al Furjan community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗