DubaiData

Binghatti Aurora

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Binghatti Aurora is a project by Binghatti Developers Fze, recorded at 100% complete at its last Dubai Land Department inspection. 73 sales registered in the trailing 12 months at a median AED 1.13M (1 539 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.13M +18.9%
IQR AED 1.02M – AED 1.47M
DLD verified
Median price per sqft
AED 1 539/sqft +7.0%
IQR 1 337 – 1 901 AED/sqft
DLD verified
Registered sales
73 -70.8%
all property types · trailing 12 complete months
DLD verified
Off-plan share
6.8%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 73 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperBinghatti Developers Fze DLD verified
StatusFinished DLD verified
Construction progress100% — at the last DLD inspection DLD verified
Registered with DLD29 Oct 2024 DLD verified
Construction started1 Aug 2024 DLD verified
Declared completion31 Dec 2025 — registry date, not a handover promise DLD verified
Units in the project275 DLD verified
Project area18 442 sqm DLD verified
Escrow agentAbu Dhabi Islamic Bank DLD verified
Project number3165 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 0001 5002 000Dec 2024Feb 2025Apr 2025Jun 2025Aug 2025Oct 2025Dec 2025Feb 2026Apr 2026Jun 2026Aug 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at May 2026: in the 4 months since, no month reached the five registered sales a median needs (12 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 4 technical inspections for this project, from 2 Jul 2024 at 9.3% to 14 Oct 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2025-12-312024-07-022025-10-14

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
14 Oct 2025100.0% +0.0 pp
14 Oct 2025100.0% +62.3 pp
17 Feb 202537.7% +28.4 pp
2 Jul 20249.3% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
May 20267 AED 1.03M1 024 994 – 1 025
Apr 20265 AED 1.00M1 899 1 867 – 1 919
Mar 20266 AED 1.33M1 726 1 572 – 1 938
Feb 20266 AED 1.11M1 896 1 576 – 1 921
Jan 202616 AED 1.17M1 523 1 340 – 1 914
Dec 202513 AED 1.47M1 885 1 367 – 1 892
Nov 20254 —— —
Oct 20254 —— —
Sep 20256 AED 1.35M1 848 1 757 – 1 913
Aug 202519 AED 1.49M1 888 1 756 – 1 903
Jul 202513 AED 1.46M1 890 1 760 – 2 278
Jun 20253 —— —
May 202515 AED 1.00M1 400 1 308 – 1 835

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios low sample (16) 16AED 722k 1 883 384 sqft — —
1-bedroom apartments 52AED 1.17M 1 455 785 sqft — —
2-bedroom apartments low sample (5) 5AED 2.15M 1 268 1 365 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

050100150202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202652AED 1.07M 1 523AED 58.22M
2025176AED 1.00M 1 740AED 188.25M
202496AED 950k 1 279AED 149.02M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
24 Sep 20261 B/R Flat — Binghatti AuroraReady 784 sqftAED 1 150 000 1 467
2 Sep 2026Studio Flat — Binghatti AuroraReady 380 sqftAED 675 000 1 778
12 Aug 20261 B/R Flat — Binghatti AuroraReady 1 449 sqftAED 1 220 000 842
10 Aug 20261 B/R Flat — Binghatti AuroraReady 782 sqftAED 1 025 000 1 311
5 Aug 20262 B/R Flat — Binghatti AuroraReady 1 365 sqftAED 1 730 000 1 268
22 Jul 2026Studio Flat — Binghatti AuroraReady 387 sqftAED 650 000 1 679
21 Jul 20261 B/R Flat — Binghatti AuroraReady 784 sqftAED 1 050 000 1 340
7 Jul 20261 B/R Flat — Binghatti AuroraReady 779 sqftAED 1 050 000 1 347
6 Jul 20261 B/R Flat — Binghatti AuroraReady 1 005 sqftAED 1 130 000 1 124
23 Jun 20261 B/R Flat — Binghatti AuroraReady 782 sqftAED 1 160 000 1 484
10 Jun 20261 B/R Flat — Binghatti AuroraReady 782 sqftAED 1 070 000 1 368
2 Jun 2026Studio Flat — Binghatti AuroraReady 384 sqftAED 690 000 1 799

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Jumeirah Village Circle

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Binghatti Aurora — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/binghatti-aurora/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Binghatti Aurora. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.