Binghatti Point
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Binghatti Point: ChatGPT · Claude · Perplexity
Binghatti Point is a project by Binghatti Developers Fze, recorded at 100% complete at its last Dubai Land Department inspection. 7 sales registered in the trailing 12 months at a median AED 765k (1 038 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 7 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Binghatti Developers Fze |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 14 Apr 2020 |
| Construction started | 1 Mar 2019 |
| Declared completion | 3 Feb 2022 — registry date, not a handover promise |
| Units in the project | 127 |
| Project area | 10 240 sqm |
| Escrow agent | Sharjah Islamic Bank |
| Project number | 2203 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2022: in the 49 months since, no month reached the five registered sales a median needs (52 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 5 technical inspections for this project, from 9 Feb 2020 at 38.0% to 3 Feb 2022 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 3 Feb 2022 | 100.0% | +17.3 pp |
| 23 Aug 2021 | 82.7% | +15.7 pp |
| 9 Mar 2021 | 67.0% | +6.9 pp |
| 5 Nov 2020 | 60.2% | +22.1 pp |
| 9 Feb 2020 | 38.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (5) | 5 | AED 745k | 1 104 | 687 sqft | — | — |
| 2-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 3 Nov 2026 | 2 B/R Flat | Ready | 896 sqft | AED 900 000 | 1 004 |
| 16 Oct 2026 | 1 B/R Flat | Ready | 821 sqft | AED 745 000 | 907 |
| 26 Aug 2026 | 1 B/R Flat | Ready | 621 sqft | AED 685 000 | 1 104 |
| 11 Mar 2026 | 1 B/R Flat | Ready | 687 sqft | AED 765 000 | 1 113 |
| 18 Feb 2026 | 1 B/R Flat | Ready | 821 sqft | AED 710 000 | 865 |
| 26 Jan 2026 | 1 B/R Flat | Ready | 687 sqft | AED 765 000 | 1 113 |
| 21 Nov 2025 | 2 B/R Flat | Ready | 1 487 sqft | AED 1 100 000 | 740 |
| 20 Nov 2025 | 2 B/R Flat | Ready | 896 sqft | AED 930 000 | 1 038 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Binghatti Point: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Oct 2022 – Sep 2023
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 5 | AED 745k | 1 104 | AED 3.67M |
| 2025 | 9 | AED 900k | 784 | AED 7.64M |
| 2024 | 11 | AED 615k | 815 | AED 7.47M |
| 2023 | 19 | AED 540k | 666 | AED 11.38M |
| 2022 | 71 | AED 520k | 692 | AED 42.78M |
| 2021 | 71 | AED 495k | 582 | AED 37.04M |
| 2017 | 1 | — | — | AED 20.52M |
| 2011 | 1 | — | — | AED 9.37M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2022–2026
| Year | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 52k | 72k | — |
| 2025 | 54k | 70k | — |
| 2024 | 48k | 64k | — |
| 2023 | 41k | 58k | — |
| 2022 | 36k | 50k | 7.54% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Sep 2022 | 7 | AED 660k | 680 | 604 – 723 |
| Aug 2022 | 2 | — | — | — |
| Jul 2022 | 6 | AED 465k | 552 | 548 – 713 |
| Jun 2022 | 3 | — | — | — |
| May 2022 | 3 | — | — | — |
| Apr 2022 | 6 | AED 630k | 704 | 703 – 720 |
| Mar 2022 | 6 | AED 490k | — | — |
| Feb 2022 | 21 | AED 475k | 699 | 667 – 722 |
| Jan 2022 | 7 | AED 492k | — | — |
| Dec 2021 | 22 | AED 516k | 588 | 521 – 746 |
| Nov 2021 | 15 | AED 495k | 619 | 536 – 671 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 7 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Silicon Oasis
Questions about Binghatti Point
Who is the developer of Binghatti Point?
The Dubai Land Department project registry lists Binghatti Developers Fze as the developer of Binghatti Point.
Is Binghatti Point completed?
The DLD registry status of Binghatti Point is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 3 Feb 2022 — a registry date, not a handover promise.
How many homes are in Binghatti Point?
The DLD registry records 127 units in Binghatti Point.
What is the price per square foot in Binghatti Point?
Over the last 12 complete months the median registered sale in Binghatti Point was AED 765k, or AED 1 038 per sqft, from 7 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Binghatti Point?
The escrow agent recorded by DLD for Binghatti Point is Sharjah Islamic Bank.
Where is Binghatti Point?
Binghatti Point is in the Silicon Oasis community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗