Data Dubai

Boulevard Point

Boulevard PointFinished100% built449 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Boulevard Point: ChatGPT · Claude · Perplexity

Boulevard Point is a project by Emaar Development P.J.S.C., recorded at 100% complete at its last Dubai Land Department inspection. 36 sales registered in the trailing 12 months at a median AED 3.23M (2 715 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 3.23M +13.3% y/y
≈ US$ 880k · typical range AED 2.25M – AED 5.40M
DLD verified
Median price per sqft
AED 2 715/sqft -14.4% y/y
typical range 2 421 – 3 186 AED/sqft
DLD verified
Registered sales
36 -51.4% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 36 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperEmaar Development P.J.S.C.
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD21 Jan 2014
Construction started8 Jan 2013
Declared completion10 Feb 2020 — registry date, not a handover promise
Units in the project449
Project area87 821 sqm
Escrow agentMashreq Bank Psc
Project number1405

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

2 0003 000Nov 2021Jun 2022Jan 2023Aug 2023Mar 2024Oct 2024May 2025Dec 2025Jul 20262 0003 000Nov 2021Jul 2023Mar 2025

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Mar 2026: in the 7 months since, no month reached the five registered sales a median needs (15 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 11 technical inspections for this project, from 29 Oct 2014 at 5.7% to 10 Feb 2020 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2020-02-102014-10-292020-02-10

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
10 Feb 2020100.0% +9.9 pp
5 Aug 201990.1% +10.0 pp
21 Mar 201980.1% +10.0 pp
28 Nov 201870.2% +9.1 pp
16 Aug 201861.1% +10.0 pp
3 Apr 201851.1% +10.2 pp
12 Dec 201740.9% +10.4 pp
8 Aug 201730.5% +6.8 pp
29 Mar 201723.7% +9.2 pp
12 Jul 201614.5% +8.8 pp
29 Oct 20145.7% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (15) 15AED 2.25M 2 542 930 sqft — —
2-bedroom apartments low sample (13) 13AED 4.25M 2 769 1 414 sqft — —
3-bedroom apartments low sample (6) 6AED 8.25M — 1 827 sqft — —
5-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
20 Nov 20262 B/R FlatReady 1 414 sqftAED 5 000 000 3 535
28 Oct 20262 B/R FlatReady 1 417 sqftAED 4 250 000 3 000
6 Oct 20262 B/R FlatReady 2 001 sqftAED 5 500 000 2 748
16 Sep 20261 B/R FlatReady 933 sqftAED 2 100 000 2 250
26 Aug 20262 B/R FlatReady 1 332 sqftAED 3 250 000 2 441
19 Aug 20261 B/R FlatReady 933 sqftAED 2 190 000 2 347
13 Aug 20262 B/R FlatReady 1 433 sqftAED 4 000 000 2 791
12 Aug 20261 B/R FlatReady 795 sqftAED 2 000 000 2 514
10 Aug 20263 B/R FlatReady 1 829 sqftAED 8 390 000 4 587
23 Jul 20262 B/R FlatReady 1 457 sqftAED 4 700 000 3 226
17 Jul 20261 B/R FlatReady 930 sqftAED 2 400 000 2 581
13 Jul 20261 B/R FlatReady 931 sqftAED 2 250 000 2 417
9 Jul 20263 B/R FlatReady 1 821 sqftAED 6 900 000 3 789
23 Jun 20262 B/R FlatReady 1 400 sqftAED 5 600 000 4 001
30 Apr 20261 B/R FlatReady 933 sqftAED 2 250 000 2 411
22 Apr 20262 B/R FlatReady 1 414 sqftAED 4 100 000 2 899
15 Apr 20261 B/R FlatReady 773 sqftAED 2 670 000 3 455
6 Apr 20262 B/R FlatReady 1 332 sqftAED 3 230 000 2 425
26 Mar 20261 B/R FlatReady 983 sqftAED 2 500 000 2 542
25 Mar 20261 B/R FlatReady 773 sqftAED 2 600 000 3 365
24 Mar 20262 B/R FlatReady 2 001 sqftAED 5 700 000 2 848
19 Mar 20262 B/R FlatReady 1 332 sqftAED 3 100 000 2 328
9 Mar 20262 B/R FlatReady 1 400 sqftAED 3 800 000 2 715
17 Feb 20261 B/R FlatReady 866 sqftAED 2 725 000 3 147

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Boulevard Point: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

02550752015201620172018201920202021202220232024202520260255075201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

024NovDecJanFebMarAprMayJunJulAugSepOct024DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202630AED 3.17M 2 748AED 106.66M
202567AED 2.69M 3 054AED 245.90M
202463AED 4.75M 3 035AED 263.62M
202365AED 3.65M 2 647AED 228.68M
202260AED 3.23M 2 339AED 182.50M
202155AED 2.90M 2 091AED 159.60M
202043AED 2.23M 1 592AED 93.73M
201969AED 1.65M 1 962AED 123.85M
201816AED 2.60M 1 732AED 40.26M
201731AED 3.53M 2 318AED 108.11M
201611AED 2.80M 1 931AED 30.52M
201582AED 3.05M 2 106AED 259.16M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2020–2026

75k100k125k150k202020212022202320242025202675k100k125k150k2020202220242026

1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year1-bed flat2-bed flat3-bed flatGross yield
2026 YTD 128k228k323k—
2025 140k242k330k5.36%
2024 135k214k320k5.16%
2023 115k195k300k5.34%
2022 95k160k260k5.16%
2021 80k125k175k4.29%
2020 75k120k160k5.31%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Mar 20265 AED 3.10M2 715 2 542 – 2 848
Feb 20261 —— —
Jan 20265 AED 2.95M3 155 2 674 – 3 391
Dec 20252 —— —
Nov 20253 —— —
Oct 20252 —— —
Sep 20255 AED 2.53M2 925 2 250 – 3 671
Aug 20252 —— —
Jul 202514 AED 2.67M3 069 2 563 – 3 210
Jun 20255 AED 2.50M3 054 2 683 – 3 204
May 20256 AED 2.55M3 138 2 746 – 3 562
Apr 20255 AED 4.22M2 970 2 920 – 3 501
Mar 202512 AED 2.60M3 184 2 864 – 3 390

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

Buildings in this project

Building (DLD name)SalesMedian priceMedian AED/sqftOff-plan
Address Fountain Views Residences - Tower 1 insufficient data 0— ——
The Dubai Mall – Fountain Views insufficient data 0— ——
Address Fountain Views Residences - Tower 2 insufficient data 0— ——
Vida Dubai Mall Tower 1 insufficient data 0— ——
Vida Dubai Mall Tower 2 insufficient data 0— ——
Address Fountain Views Hotel insufficient data 0— ——

Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Boulevard Point. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
The Address Residence Fountain Views Ii
Finished · Emaar Development P.J.S.C.
59 m100%289
The 118
Finished · Signature D T Real Estate Development
92 m100%28
The Address Residence Fountain Views Iii
Finished · Emaar Development P.J.S.C.
120 m100%212
Mon Reve
Finished · Credo Investments F Z E
144 m100%97
Vizir Downtown
Cancelled · Dara Development L.L.C
200 m12%1
The Address Residence-Fountain Views
Finished · Emaar Development P.J.S.C.
251 m100%286
The Signature
Finished · Damac Star Properties (L L C)
278 m100%357
Burj Al Nujoom
Finished · Althuraya Real Estate Development Limited
290 m100%408
Rp Heights
Finished · Rp Global Developers L.L.C
308 m100%297
Upper Crest
Finished · Damac Development(L L C)
320 m100%397

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in DownTown Dubai

Questions about Boulevard Point

Who is the developer of Boulevard Point?

The Dubai Land Department project registry lists Emaar Development P.J.S.C. as the developer of Boulevard Point.

Is Boulevard Point completed?

The DLD registry status of Boulevard Point is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 10 Feb 2020 — a registry date, not a handover promise.

How many homes are in Boulevard Point?

The DLD registry records 449 units in Boulevard Point.

What is the price per square foot in Boulevard Point?

Over the last 12 complete months the median registered sale in Boulevard Point was AED 3.23M, or AED 2 715 per sqft, from 36 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Boulevard Point?

The escrow agent recorded by DLD for Boulevard Point is Mashreq Bank Psc.

Where is Boulevard Point?

Boulevard Point is in the DownTown Dubai community. 10 other projects with a page on this site are registered within 1.2 km; the closest is The Address Residence Fountain Views Ii, about 59 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Boulevard Point — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/boulevard-point/”. Reuse is permitted with attribution.