29 Boulevard is a project by Emaar Properties (P.J.S.C), recorded at 100% complete at its last Dubai Land Department inspection. 79 sales registered in the trailing 12 months at a median AED 2.25M (2 343 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 79 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Emaar Properties (P.J.S.C) | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% — at the last DLD inspection | DLD verified |
| Registered with DLD | 7 Jul 2010 | DLD verified |
| Construction started | 26 Aug 2008 | DLD verified |
| Declared completion | 10 Apr 2013 — registry date, not a handover promise | DLD verified |
| Units in the project | 756 | DLD verified |
| Project area | 75 211 sqm | DLD verified |
| Escrow agent | Mashreq Bank Psc | DLD verified |
| Project number | 1276 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 23 Sep 2012 at 71.0% to 4 Feb 2013 at 94.3%. Over the inspections since 23 Sep 2012 it moved 5.29 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 4 Feb 2013 | 94.3% | +23.3 pp |
| 23 Sep 2012 | 71.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Sep 2026 | 8 | AED 2.65M | 2 272 | 2 113 – 2 400 |
| Aug 2026 | 2 | — | — | — |
| Jul 2026 | 7 | AED 2.20M | 2 113 | 1 938 – 2 518 |
| Jun 2026 | 2 | — | — | — |
| May 2026 | 3 | — | — | — |
| Apr 2026 | 1 | — | — | — |
| Mar 2026 | 4 | — | — | — |
| Feb 2026 | 9 | AED 2.73M | 2 421 | 2 324 – 2 596 |
| Jan 2026 | 2 | — | — | — |
| Dec 2025 | 8 | AED 2.62M | 2 453 | 2 124 – 2 658 |
| Nov 2025 | 10 | AED 2.33M | 2 287 | 2 208 – 2 364 |
| Oct 2025 | 11 | AED 2.36M | 2 446 | 2 259 – 2 521 |
| Sep 2025 | 4 | — | — | — |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (10) | 10 | AED 1.13M | 2 365 | 465 sqft | — | — |
| 1-bedroom apartments | 36 | AED 2.00M | 2 293 | 838 sqft | — | — |
| 2-bedroom apartments | 30 | AED 2.92M | 2 373 | 1 202 sqft | — | — |
| 3-bedroom apartments insufficient data | 3 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 49 | AED 2.22M | 2 328 | AED 92.50M |
| 2025 | 101 | AED 2.25M | 2 428 | AED 229.86M |
| 2024 | 90 | AED 1.95M | 2 146 | AED 184.20M |
| 2023 | 111 | AED 1.74M | 1 940 | AED 218.61M |
| 2022 | 66 | AED 1.69M | 1 762 | AED 115.05M |
| 2021 | 48 | AED 1.40M | 1 462 | AED 69.50M |
| 2020 | 36 | AED 1.20M | 1 254 | AED 44.53M |
| 2019 | 34 | AED 1.28M | 1 408 | AED 49.74M |
| 2018 | 26 | AED 1.45M | 1 660 | AED 40.09M |
| 2017 | 35 | AED 1.72M | 2 113 | AED 63.72M |
| 2016 | 60 | AED 1.86M | 2 178 | AED 117.07M |
| 2015 | 58 | AED 2.10M | 2 190 | AED 128.03M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 24 Sep 2026 | 1 B/R Flat — 29 BOULEVARD | Ready | 802 sqft | AED 2 000 000 | 2 493 |
| 15 Sep 2026 | 1 B/R Flat — 29 BOULEVARD | Ready | 799 sqft | AED 1 750 000 | 2 190 |
| 15 Sep 2026 | 2 B/R Flat — 29 BOULEVARD | Ready | 1 286 sqft | AED 3 050 000 | 2 372 |
| 15 Sep 2026 | 2 B/R Flat — 29 BOULEVARD | Ready | 1 284 sqft | AED 3 025 000 | 2 355 |
| 14 Sep 2026 | 2 B/R Flat — 29 BOULEVARD | Ready | 1 112 sqft | AED 2 380 000 | 2 139 |
| 4 Sep 2026 | 1 B/R Flat — 29 BOULEVARD | Ready | 1 056 sqft | AED 2 150 000 | 2 035 |
| 2 Sep 2026 | 2 B/R Flat — 29 BOULEVARD | Ready | 1 174 sqft | AED 2 915 000 | 2 484 |
| 1 Sep 2026 | 2 B/R Flat — 29 BOULEVARD | Ready | 1 487 sqft | AED 3 000 000 | 2 018 |
| 18 Aug 2026 | 3 B/R Flat — 29 BOULEVARD | Ready | 1 752 sqft | AED 3 350 000 | 1 912 |
| 7 Aug 2026 | 2 B/R Flat — 29 BOULEVARD | Ready | 1 426 sqft | AED 2 640 000 | 1 851 |
| 30 Jul 2026 | Studio Flat — 29 BOULEVARD | Ready | 469 sqft | AED 2 552 | 5 |
| 29 Jul 2026 | 1 B/R Flat — 29 BOULEVARD | Ready | 828 sqft | AED 46 154 | 56 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in DownTown Dubai
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “29 Boulevard — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/29-boulevard/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for 29 Boulevard. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.