Data Dubai

Burj Sabah

Burj SabahFinished100% built230 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Burj Sabah: ChatGPT · Claude · Perplexity

Burj Sabah is a project by R S G Property Management L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
2
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 2 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperR S G Property Management L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD26 Jul 2016
Construction started15 May 2016
Declared completion12 Feb 2020 — registry date, not a handover promise
Units in the project230
Project area12 240 sqm
Escrow agentEmirates Nbd Bank (P.J.S.C)
Project number1769

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 26 Dec 2017 at 15.9% to 12 Feb 2020 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2020-02-122017-12-262020-02-12

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
12 Feb 2020100.0% +42.6 pp
20 Dec 201857.4% +41.4 pp
26 Dec 201715.9% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
6 Jul 2026BuildingReady 21 539 sqftAED 115 000 000 —
29 Jun 2026BuildingReady 21 539 sqftAED 115 000 000 —

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Burj Sabah: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

012201420152026012201420152026

registered sales per calendar year; the current year is incomplete

By month

001NovDecJanFebMarAprMayJunJulAugSepOct001DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20262— —AED 230.00M
20151— —AED 11.03M
20141— —AED 14.86M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent by year, 2023–2025

Median annual rent, AED thousand
Year1-bed flat
2025 72k
2024 67k
2023 62k

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 2 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Burj Sabah. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Belgravia Heights I
Finished · Ellington Properties Development L.L.C
37 m100%156
Las Casas
Finished · Shams Eldien Eissawy Naja & Tarek Mahmoud Fils Halim & Tarek Ossama Abdou
136 m100%26
Marwa Homes
Finished · New World Developments L.L.C
136 m100%14
7 West Villas
Finished · A. S. A 1 Developers Limited
243 m100%14
Lilac Park
Finished · Ab Properties Limited
267 m100%17
Dana Tower
Finished · Tiger Properties
327 m100%154
Lawnsv
Cancelled · Dheeraj & East Coast (L.L.C)
360 m10%—
Erantis
Finished · Crown One Holding Limited
387 m100%16
Lawnsiv
Cancelled · Gold Line Real Estate Development L.L.C
391 m59%—
Mirabella 3
Finished · Fortis Plus Holdings Limited
496 m100%20

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Jumeirah Village Circle

Questions about Burj Sabah

Who is the developer of Burj Sabah?

The Dubai Land Department project registry lists R S G Property Management L.L.C as the developer of Burj Sabah.

Is Burj Sabah completed?

The DLD registry status of Burj Sabah is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 12 Feb 2020 — a registry date, not a handover promise.

How many homes are in Burj Sabah?

The DLD registry records 230 units in Burj Sabah.

What is the price per square foot in Burj Sabah?

Too few sales were registered in Burj Sabah in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Burj Sabah?

The escrow agent recorded by DLD for Burj Sabah is Emirates Nbd Bank (P.J.S.C).

Where is Burj Sabah?

Burj Sabah is in the Jumeirah Village Circle community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Belgravia Heights I, about 37 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Burj Sabah — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/burj-sabah/”. Reuse is permitted with attribution.