Cloud Tower
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Cloud Tower is a project by Tiger Properties, recorded at 100% complete at its last Dubai Land Department inspection. 65 sales registered in the trailing 12 months at a median AED 907k (1 434 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 65 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Tiger Properties | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% — at the last DLD inspection | DLD verified |
| Registered with DLD | 11 Mar 2022 | DLD verified |
| Construction started | 1 Mar 2022 | DLD verified |
| Declared completion | 28 Feb 2025 — registry date, not a handover promise | DLD verified |
| Units in the project | 456 | DLD verified |
| Project area | 30 176 sqm | DLD verified |
| Escrow agent | Abu Dhabi Commercial Bank | DLD verified |
| Project number | 2212 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 5 technical inspections for this project, from 3 Nov 2022 at 3.5% to 20 Oct 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 20 Oct 2025 | 100.0% | +1.7 pp |
| 14 Oct 2025 | 98.3% | +26.2 pp |
| 10 Feb 2025 | 72.1% | +56.7 pp |
| 29 Aug 2023 | 15.4% | +11.9 pp |
| 3 Nov 2022 | 3.5% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Sep 2026 | 5 | AED 923k | 1 383 | 1 329 – 1 419 |
| Aug 2026 | 4 | — | — | — |
| Jul 2026 | 6 | AED 888k | 1 377 | 1 329 – 1 419 |
| Jun 2026 | 3 | — | — | — |
| May 2026 | 2 | — | — | — |
| Apr 2026 | 5 | AED 910k | 1 547 | 1 359 – 1 566 |
| Mar 2026 | 6 | AED 785k | 1 531 | 1 429 – 1 652 |
| Feb 2026 | 6 | AED 757k | 1 486 | 1 227 – 1 523 |
| Jan 2026 | 11 | AED 907k | 1 493 | 1 449 – 1 511 |
| Dec 2025 | 13 | AED 970k | 1 519 | 1 310 – 1 596 |
| Nov 2025 | 4 | — | — | — |
| Oct 2025 | 0 | — | — | — |
| Sep 2025 | 15 | AED 725k | 1 258 | 1 141 – 1 858 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (11) | 11 | AED 585k | 1 493 | 392 sqft | — | — |
| 1-bedroom apartments | 42 | AED 904k | 1 440 | 599 sqft | — | — |
| 2-bedroom apartments low sample (11) | 11 | AED 1.35M | 1 383 | 940 sqft | — | — |
| 3-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 48 | AED 900k | 1 433 | AED 45.03M |
| 2025 | 134 | AED 761k | 1 202 | AED 109.06M |
| 2024 | 132 | AED 751k | 1 178 | AED 103.70M |
| 2023 | 89 | AED 690k | 1 142 | AED 65.20M |
| 2022 | 76 | AED 653k | 1 142 | AED 50.61M |
| 2018 | 1 | — | — | AED 15.00M |
| 2014 | 1 | — | — | AED 14.85M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 29 Sep 2026 | 2 B/R Flat — CLOUD Tower | Ready | 1 473 sqft | AED 1 910 000 | 1 297 |
| 29 Sep 2026 | 1 B/R Flat — CLOUD Tower | Ready | 563 sqft | AED 820 000 | 1 456 |
| 17 Sep 2026 | 1 B/R Flat — CLOUD Tower | Ready | 564 sqft | AED 750 000 | 1 329 |
| 17 Sep 2026 | 1 B/R Flat — CLOUD Tower | Ready | 651 sqft | AED 923 000 | 1 419 |
| 7 Sep 2026 | 2 B/R Flat — CLOUD Tower | Ready | 940 sqft | AED 1 300 000 | 1 383 |
| 31 Aug 2026 | 1 B/R Flat — CLOUD Tower | Ready | 553 sqft | AED 800 000 | 1 446 |
| 26 Aug 2026 | 1 B/R Flat — CLOUD Tower | Ready | 563 sqft | AED 669 000 | 1 188 |
| 25 Aug 2026 | 1 B/R Flat — CLOUD Tower | Ready | 651 sqft | AED 923 000 | 1 419 |
| 24 Aug 2026 | 1 B/R Flat — CLOUD Tower | Ready | 635 sqft | AED 900 000 | 1 418 |
| 27 Jul 2026 | 1 B/R Flat — CLOUD Tower | Ready | 742 sqft | AED 975 000 | 1 315 |
| 23 Jul 2026 | Studio Flat — CLOUD Tower | Ready | 399 sqft | AED 570 000 | 1 430 |
| 13 Jul 2026 | Studio Flat — CLOUD Tower | Ready | 379 sqft | AED 525 000 | 1 384 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Jumeirah Village Triangle
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Cloud Tower — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/cloud-tower/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Cloud Tower. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.