Crystal Residence
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Crystal Residence: ChatGPT · Claude · Perplexity
Crystal Residence is a project by Myra Real Estate Deveiopment L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 8 sales registered in the trailing 12 months at a median AED 638k (975 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 8 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Myra Real Estate Deveiopment L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 11 May 2016 |
| Construction started | 1 Apr 2016 |
| Declared completion | 20 Dec 2018 — registry date, not a handover promise |
| Units in the project | 225 |
| Project area | 14 147 sqm |
| Escrow agent | First Abu Dhabi Bank P.J.S.C. |
| Project number | 1752 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jan 2024: in the 33 months since, no month reached the five registered sales a median needs (44 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 20 Dec 2016 at 8.9% to 20 Dec 2018 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 20 Dec 2018 | 100.0% | +1.9 pp |
| 5 Sep 2018 | 98.1% | +27.9 pp |
| 21 Feb 2018 | 70.1% | +20.0 pp |
| 10 Oct 2017 | 50.1% | +26.8 pp |
| 17 Apr 2017 | 23.3% | +14.4 pp |
| 20 Dec 2016 | 8.9% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 3 | — | — | — | — | — |
| 1-bedroom apartments low sample (5) | 5 | AED 750k | 967 | 776 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 9 Nov 2026 | 1 B/R Flat | Ready | 1 049 sqft | AED 875 000 | 834 |
| 14 Oct 2026 | 1 B/R Flat | Ready | 693 sqft | AED 560 000 | 808 |
| 21 Sep 2026 | 1 B/R Flat | Ready | 692 sqft | AED 715 000 | 1 034 |
| 24 Jul 2026 | Studio Flat | Ready | 419 sqft | AED 530 000 | 1 264 |
| 30 Jun 2026 | 1 B/R Flat | Ready | 839 sqft | AED 750 000 | 893 |
| 18 May 2026 | 1 B/R Flat | Ready | 776 sqft | AED 750 000 | 967 |
| 18 May 2026 | Studio Flat | Ready | 513 sqft | AED 500 000 | 975 |
| 3 Feb 2026 | 1 B/R Flat | Ready | 801 sqft | AED 860 000 | 1 074 |
| 19 Jan 2026 | Studio Flat | Ready | 513 sqft | AED 500 000 | 975 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Crystal Residence: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Feb 2024 – Jan 2025
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 8 | AED 638k | 975 | AED 5.17M |
| 2025 | 14 | AED 585k | 1 352 | AED 9.48M |
| 2024 | 37 | AED 700k | 891 | AED 26.08M |
| 2023 | 23 | AED 470k | 930 | AED 14.77M |
| 2022 | 24 | AED 400k | 880 | AED 9.40M |
| 2021 | 15 | AED 350k | 692 | AED 7.92M |
| 2020 | 8 | AED 415k | 731 | AED 3.78M |
| 2019 | 14 | AED 420k | 830 | AED 6.96M |
| 2018 | 31 | AED 434k | 948 | AED 19.45M |
| 2017 | 166 | AED 419k | 950 | AED 88.96M |
| 2016 | 23 | AED 416k | 953 | AED 10.63M |
| 2014 | 2 | — | — | AED 38.95M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2019–2026
Studio: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | Studio | 1-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 45k | 63k | — |
| 2025 | 45k | 65k | — |
| 2024 | 42k | 62k | 8.40% |
| 2023 | 35k | 55k | — |
| 2022 | 29k | 47k | 7.25% |
| 2021 | 25k | 44k | — |
| 2020 | 27k | 45k | — |
| 2019 | 34k | 55k | — |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jan 2024 | 15 | AED 724k | 651 | 646 – 709 |
| Dec 2023 | 1 | — | — | — |
| Nov 2023 | 4 | — | — | — |
| Oct 2023 | 2 | — | — | — |
| Sep 2023 | 0 | — | — | — |
| Aug 2023 | 2 | — | — | — |
| Jul 2023 | 1 | — | — | — |
| Jun 2023 | 6 | AED 440k | 958 | 916 – 1 005 |
| May 2023 | 0 | — | — | — |
| Apr 2023 | 2 | — | — | — |
| Mar 2023 | 2 | — | — | — |
| Feb 2023 | 0 | — | — | — |
| Jan 2023 | 3 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 8 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Crystal Residence. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Mirabella 5 Finished · Fortis Plus Holdings Limited |
104 m | 100% |
| Fortunato Finished · Al Tajir Real Estate (L.L.C) |
170 m | 100% |
| Mirabella 6 Finished · Fortis Plus Holdings Limited |
188 m | 100% |
| Joya Verde Residences Dubai Finished · Green Yard Propertes Development L.L.C |
262 m | 100% |
| Cadi5 Cancelled · Al Masah International Real Estate Development (Llc) |
292 m | 40% |
| Diamond Views 4 Finished · Diamond Developers Co.Limited |
299 m | 100% |
| Mirabella 4 Finished · Fortis Plus Holdings Limited |
305 m | 100% |
| Diamond Views 4 - Villas B Finished · Diamond Developers Co.Limited |
308 m | 100% |
| Diamond Views 4 - Villas A Finished · Diamond Developers Co.Limited |
321 m | 100% |
| Aces Chateau Finished · Aces Property Development L.L.C |
354 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Jumeirah Village Circle
Questions about Crystal Residence
Who is the developer of Crystal Residence?
The Dubai Land Department project registry lists Myra Real Estate Deveiopment L.L.C as the developer of Crystal Residence.
Is Crystal Residence completed?
The DLD registry status of Crystal Residence is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 20 Dec 2018 — a registry date, not a handover promise.
How many homes are in Crystal Residence?
The DLD registry records 225 units in Crystal Residence.
What is the price per square foot in Crystal Residence?
Over the last 12 complete months the median registered sale in Crystal Residence was AED 638k, or AED 975 per sqft, from 8 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Crystal Residence?
The escrow agent recorded by DLD for Crystal Residence is First Abu Dhabi Bank P.J.S.C..
Where is Crystal Residence?
Crystal Residence is in the Jumeirah Village Circle community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Mirabella 5, about 104 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗