Eltiera Heights
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Eltiera Heights is a project by Ellington Pcfc Developers L.L.C, recorded at 3% complete at its last Dubai Land Department inspection. 301 sales registered in the trailing 12 months at a median AED 2.28M (2 539 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 301 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Ellington Pcfc Developers L.L.C | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 3% — at the last DLD inspection | DLD verified |
| Registered with DLD | 11 Sep 2025 | DLD verified |
| Construction started | 19 Jun 2025 | DLD verified |
| Declared completion | 31 Dec 2028 — registry date, not a handover promise | DLD verified |
| Units in the project | 357 | DLD verified |
| Project area | 38 017 sqm | DLD verified |
| Escrow agent | National Bank Of Ras Al- Khaimah (P.S.C) | DLD verified |
| Project number | 3852 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2026: in the 2 months since, no month reached the five registered sales a median needs (4 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 3 technical inspections for this project, from 2 Jul 2025 at 0.0% to 20 Jul 2026 at 3.0%. Since 2 Jul 2025 the recorded percentage has moved 0.24 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 20 Jul 2026 | 3.0% | +2.7 pp |
| 13 Mar 2026 | 0.3% | +0.3 pp |
| 2 Jul 2025 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2026 | 5 | AED 2.06M | 2 475 | 2 429 – 2 476 |
| Jun 2026 | 2 | — | — | — |
| May 2026 | 1 | — | — | — |
| Apr 2026 | 9 | AED 2.28M | 2 555 | 2 513 – 2 604 |
| Mar 2026 | 7 | AED 2.11M | 2 531 | 2 419 – 2 601 |
| Feb 2026 | 11 | AED 2.22M | 2 507 | 2 408 – 2 658 |
| Jan 2026 | 29 | AED 2.94M | 2 511 | 2 437 – 2 587 |
| Dec 2025 | 50 | AED 2.31M | 2 531 | 2 462 – 2 639 |
| Nov 2025 | 113 | AED 2.30M | 2 554 | 2 461 – 2 642 |
| Oct 2025 | 68 | AED 2.23M | 2 533 | 2 440 – 2 608 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments | 158 | AED 2.11M | 2 547 | 826 sqft | — | — |
| 2-bedroom apartments | 109 | AED 3.27M | 2 541 | 1 254 sqft | — | — |
| 3-bedroom apartments | 31 | AED 4.06M | 2 450 | 1 641 sqft | — | — |
| 4-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 69 | AED 2.31M | 2 520 | AED 189.44M |
| 2025 | 232 | AED 2.28M | 2 542 | AED 644.13M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 30 Sep 2026 | 1 B/R Flat — ELTIERA HEIGHTS | Off-plan | 820 sqft | AED 2 097 828 | 2 557 |
| 23 Sep 2026 | 2 B/R Flat — ELTIERA HEIGHTS | Off-plan | 1 251 sqft | AED 3 190 828 | 2 551 |
| 2 Sep 2026 | 2 B/R Flat — ELTIERA HEIGHTS | Off-plan | 1 369 sqft | AED 3 679 828 | 2 688 |
| 20 Aug 2026 | 2 B/R Flat — ELTIERA HEIGHTS | Off-plan | 1 238 sqft | AED 3 137 828 | 2 536 |
| 30 Jul 2026 | 1 B/R Flat — ELTIERA HEIGHTS | Off-plan | 844 sqft | AED 2 050 828 | 2 429 |
| 29 Jul 2026 | 1 B/R Flat — ELTIERA HEIGHTS | Off-plan | 826 sqft | AED 2 057 828 | 2 491 |
| 23 Jul 2026 | 1 B/R Flat — ELTIERA HEIGHTS | Off-plan | 822 sqft | AED 2 034 828 | 2 476 |
| 16 Jul 2026 | 3 B/R Flat — ELTIERA HEIGHTS | Off-plan | 1 641 sqft | AED 4 061 828 | 2 475 |
| 16 Jul 2026 | 3 B/R Flat — ELTIERA HEIGHTS | Off-plan | 1 948 sqft | AED 4 547 828 | 2 335 |
| 8 Jun 2026 | 2 B/R Flat — ELTIERA HEIGHTS | Off-plan | 1 238 sqft | AED 3 286 828 | 2 656 |
| 4 Jun 2026 | 1 B/R Flat — ELTIERA HEIGHTS | Off-plan | 844 sqft | AED 2 007 828 | 2 378 |
| 5 May 2026 | 2 B/R Flat — ELTIERA HEIGHTS | Off-plan | 1 369 sqft | AED 3 376 828 | 2 467 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Jumeirah Islands
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Eltiera Heights — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/eltiera-heights/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Eltiera Heights. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.