Golf Hillside
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Golf Hillside: ChatGPT · Claude · Perplexity
Golf Hillside is a project by Dubai Hills Estate L.L.C, recorded at 66% complete at its last Dubai Land Department inspection. 26 sales registered in the trailing 12 months at a median AED 3.76M (2 512 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 26 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Dubai Hills Estate L.L.C |
| Status | Active |
| Construction progress | 66% — at the last DLD inspection |
| Registered with DLD | 3 Sep 2024 |
| Construction started | 16 Oct 2024 |
| Declared completion | 31 Dec 2028 — registry date, not a handover promise |
| Units in the project | 185 |
| Project area | 20 018 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 3237 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2026: in the 3 months since, no month reached the five registered sales a median needs (3 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 7 technical inspections for this project, from 15 Aug 2024 at 0.0% to 11 Aug 2026 at 65.8%. Over the inspections since 12 Mar 2025 it moved 3.46 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 11 Aug 2026 | 65.8% | +11.1 pp |
| 21 Apr 2026 | 54.7% | +18.0 pp |
| 5 Jan 2026 | 36.6% | +12.7 pp |
| 17 Sep 2025 | 24.0% | +9.5 pp |
| 18 Jun 2025 | 14.4% | +7.3 pp |
| 12 Mar 2025 | 7.1% | +7.1 pp |
| 15 Aug 2024 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
Off-plan sale registrations in Golf Hillside (198) already equal 100% of the 184 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.
| Homes | In unit register | Registered sales |
|---|---|---|
| 1 bedroom | 78 | 84 |
| 2 bedrooms | 62 | 67 |
| 3 bedrooms | 44 | 47 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (5) | 5 | AED 1.54M | 2 028 | 746 sqft | — | — |
| 2-bedroom apartments low sample (7) | 7 | AED 2.96M | 2 458 | 1 193 sqft | — | — |
| 3-bedroom apartments low sample (14) | 14 | AED 4.31M | 2 687 | 1 603 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 13 Nov 2026 | 2 B/R Flat | Off-plan | 1 193 sqft | AED 2 966 292 | 2 486 |
| 13 Nov 2026 | 3 B/R Flat | Off-plan | 1 603 sqft | AED 4 322 772 | 2 697 |
| 13 Nov 2026 | 2 B/R Flat | Off-plan | 1 222 sqft | AED 3 236 052 | 2 649 |
| 13 Nov 2026 | 3 B/R Flat | Off-plan | 1 603 sqft | AED 4 323 732 | 2 697 |
| 13 Nov 2026 | 1 B/R Flat | Off-plan | 806 sqft | AED 1 625 172 | 2 016 |
| 26 Oct 2026 | 3 B/R Flat | Off-plan | 1 603 sqft | AED 4 706 888 | 2 936 |
| 7 Sep 2026 | 1 B/R Flat | Off-plan | 806 sqft | AED 1 788 888 | 2 219 |
| 12 Aug 2026 | 3 B/R Flat | Off-plan | 1 603 sqft | AED 3 575 910 | 2 230 |
| 30 Jul 2026 | 3 B/R Flat | Off-plan | 1 603 sqft | AED 4 307 412 | 2 687 |
| 30 Jul 2026 | 3 B/R Flat | Off-plan | 1 603 sqft | AED 4 306 452 | 2 687 |
| 17 Jul 2026 | 1 B/R Flat | Off-plan | 746 sqft | AED 1 512 888 | 2 028 |
| 16 Jul 2026 | 1 B/R Flat | Off-plan | 813 sqft | AED 1 639 572 | 2 017 |
| 16 Jul 2026 | 2 B/R Flat | Off-plan | 1 190 sqft | AED 2 957 652 | 2 486 |
| 24 Jun 2026 | 2 B/R Flat | Off-plan | 1 193 sqft | AED 2 931 888 | 2 458 |
| 16 Jun 2026 | 2 B/R Flat | Off-plan | 1 880 sqft | AED 3 026 888 | 1 610 |
| 18 May 2026 | 1 B/R Flat | Off-plan | 741 sqft | AED 749 444 | 1 011 |
| 6 May 2026 | 3 B/R Flat | Off-plan | 1 603 sqft | AED 4 374 888 | 2 729 |
| 30 Mar 2026 | 3 B/R Flat | Off-plan | 1 603 sqft | AED 4 070 888 | 2 539 |
| 18 Mar 2026 | 2 B/R Flat | Off-plan | 1 190 sqft | AED 2 793 492 | 2 348 |
| 19 Feb 2026 | 2 B/R Flat | Off-plan | 1 193 sqft | AED 3 065 888 | 2 570 |
| 18 Feb 2026 | 2 B/R Flat | Off-plan | 1 193 sqft | AED 3 060 888 | 2 566 |
| 27 Jan 2026 | 3 B/R Flat | Off-plan | 1 603 sqft | AED 4 160 970 | 2 595 |
| 22 Jan 2026 | 3 B/R Flat | Off-plan | 1 603 sqft | AED 4 344 888 | 2 710 |
| 20 Jan 2026 | 3 B/R Flat | Off-plan | 1 603 sqft | AED 4 344 888 | 2 710 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Golf Hillside: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 22 | AED 3.32M | 2 512 | AED 71.36M |
| 2025 | 48 | AED 3.94M | 2 568 | AED 174.02M |
| 2024 | 123 | AED 1.68M | 2 073 | AED 278.02M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2026 | 5 | AED 2.96M | 2 486 | 2 028 – 2 687 |
| Jun 2026 | 2 | — | — | — |
| May 2026 | 2 | — | — | — |
| Apr 2026 | 0 | — | — | — |
| Mar 2026 | 2 | — | — | — |
| Feb 2026 | 2 | — | — | — |
| Jan 2026 | 6 | AED 4.15M | 2 591 | 2 495 – 2 681 |
| Dec 2025 | 2 | — | — | — |
| Nov 2025 | 2 | — | — | — |
| Oct 2025 | 0 | — | — | — |
| Sep 2025 | 1 | — | — | — |
| Aug 2025 | 0 | — | — | — |
| Jul 2025 | 7 | AED 4.31M | 2 690 | 2 359 – 2 751 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Hills Estate
Questions about Golf Hillside
Who is the developer of Golf Hillside?
The Dubai Land Department project registry lists Dubai Hills Estate L.L.C as the developer of Golf Hillside.
Is Golf Hillside completed?
The DLD registry status of Golf Hillside is Active, 66% complete at the last DLD inspection. The declared completion date in the registry is 31 Dec 2028 — a registry date, not a handover promise.
How many homes are in Golf Hillside?
The DLD registry records 185 units in Golf Hillside. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Golf Hillside?
Over the last 12 complete months the median registered sale in Golf Hillside was AED 3.76M, or AED 2 512 per sqft, from 26 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Golf Hillside?
The escrow agent recorded by DLD for Golf Hillside is Mashreq Bank Psc.
Where is Golf Hillside?
Golf Hillside is in the Dubai Hills Estate community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Golf Hillside. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.