H Three By Aurora
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about H Three By Aurora: ChatGPT · Claude · Perplexity
H Three By Aurora is a project by Aurora Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 15 sales registered in the trailing 12 months at a median AED 950k (1 457 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 15 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Aurora Real Estate Development L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 5 Jan 2024 |
| Construction started | 2 May 2023 |
| Declared completion | 20 Mar 2025 — registry date, not a handover promise |
| Units in the project | 147 |
| Project area | 12 809 sqm |
| Escrow agent | The National Bank Of Fujairah P S C |
| Project number | 2763 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Oct 2025: in the 12 months since, no month reached the five registered sales a median needs (15 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 3 technical inspections for this project, from 1 Sep 2023 at 10.1% to 20 Mar 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 20 Mar 2025 | 100.0% | +19.7 pp |
| 4 Oct 2024 | 80.3% | +70.2 pp |
| 1 Sep 2023 | 10.1% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 3 | — | — | — | — | — |
| 1-bedroom apartments low sample (10) | 10 | AED 1.06M | 1 249 | 874 sqft | — | — |
| 2-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 15 Sep 2026 | 1 B/R Flat | Ready | 824 sqft | AED 1 200 000 | 1 457 |
| 14 Jul 2026 | 1 B/R Flat | Ready | 976 sqft | AED 1 500 000 | 1 537 |
| 4 May 2026 | 1 B/R Flat | Ready | 874 sqft | AED 1 300 000 | 1 487 |
| 2 Mar 2026 | 1 B/R Flat | Ready | 876 sqft | AED 1 525 000 | 1 741 |
| 27 Feb 2026 | 1 B/R Flat | Ready | 874 sqft | AED 930 000 | 1 064 |
| 15 Jan 2026 | 1 B/R Flat | Ready | 824 sqft | AED 950 000 | 1 152 |
| 7 Jan 2026 | 2 B/R Flat | Ready | 1 238 sqft | AED 2 100 000 | 1 696 |
| 29 Dec 2025 | 1 B/R Flat | Ready | 876 sqft | AED 925 000 | 1 056 |
| 22 Dec 2025 | Studio Flat | Ready | 481 sqft | AED 500 000 | 1 040 |
| 9 Dec 2025 | 1 B/R Flat | Ready | 875 sqft | AED 1 175 000 | 1 343 |
| 9 Dec 2025 | 2 B/R Flat | Ready | 1 507 sqft | AED 2 200 000 | 1 460 |
| 26 Nov 2025 | 1 B/R Flat | Ready | 822 sqft | AED 950 000 | 1 155 |
| 20 Nov 2025 | 1 B/R Flat | Ready | 822 sqft | AED 930 000 | 1 131 |
| 18 Nov 2025 | Studio Flat | Ready | 437 sqft | AED 750 000 | 1 715 |
| 5 Nov 2025 | Studio Flat | Ready | 433 sqft | AED 830 000 | 1 916 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for H Three By Aurora: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 7 | AED 1.30M | 1 487 | AED 9.51M |
| 2025 | 140 | AED 950k | 1 120 | AED 163.37M |
| 2024 | 34 | AED 950k | 1 119 | AED 33.71M |
| 2021 | 1 | — | — | AED 9.26M |
| 2016 | 1 | — | — | AED 11.23M |
| 2014 | 1 | — | — | AED 13.25M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Oct 2025 | 7 | AED 1.27M | 1 484 | 1 087 – 1 525 |
| Sep 2025 | 14 | AED 1.35M | 1 481 | 1 152 – 1 577 |
| Aug 2025 | 18 | AED 1.32M | 1 096 | 913 – 1 305 |
| Jul 2025 | 26 | AED 950k | 1 116 | 1 073 – 1 166 |
| Jun 2025 | 17 | AED 940k | 1 112 | 1 075 – 1 155 |
| May 2025 | 9 | AED 920k | 1 120 | 1 116 – 1 147 |
| Apr 2025 | 14 | AED 935k | 1 087 | 1 002 – 1 257 |
| Mar 2025 | 14 | AED 950k | 1 086 | 1 078 – 1 156 |
| Feb 2025 | 8 | AED 550k | 1 150 | 1 130 – 1 223 |
| Jan 2025 | 3 | — | — | — |
| Dec 2024 | 1 | — | — | — |
| Nov 2024 | 6 | AED 945k | 1 126 | 1 099 – 1 149 |
| Oct 2024 | 2 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 15 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Jumeirah Village Circle
Questions about H Three By Aurora
Who is the developer of H Three By Aurora?
The Dubai Land Department project registry lists Aurora Real Estate Development L.L.C as the developer of H Three By Aurora.
Is H Three By Aurora completed?
The DLD registry status of H Three By Aurora is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 20 Mar 2025 — a registry date, not a handover promise.
How many homes are in H Three By Aurora?
The DLD registry records 147 units in H Three By Aurora.
What is the price per square foot in H Three By Aurora?
Over the last 12 complete months the median registered sale in H Three By Aurora was AED 950k, or AED 1 457 per sqft, from 15 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for H Three By Aurora?
The escrow agent recorded by DLD for H Three By Aurora is The National Bank Of Fujairah P S C.
Where is H Three By Aurora?
H Three By Aurora is in the Jumeirah Village Circle community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗