La Riviera Azure
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about La Riviera Azure: ChatGPT · Claude · Perplexity
La Riviera Azure is a project by Riviera Azure Properties Development, recorded at 100% complete at its last Dubai Land Department inspection. 7 sales registered in the trailing 12 months at a median AED 1.10M (1 028 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 7 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Riviera Azure Properties Development |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 29 Aug 2021 |
| Construction started | 1 Jan 2018 |
| Declared completion | 15 May 2022 — registry date, not a handover promise |
| Units in the project | 88 |
| Project area | 8 095 sqm |
| Escrow agent | United Bank Limited (Management Office) |
| Project number | 2268 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Nov 2022: in the 47 months since, no month reached the five registered sales a median needs (34 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 4 technical inspections for this project, from 16 Jun 2021 at 50.5% to 19 Jul 2022 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 19 Jul 2022 | 100.0% | +6.4 pp |
| 29 Mar 2022 | 93.6% | +31.6 pp |
| 11 Oct 2021 | 62.0% | +11.5 pp |
| 16 Jun 2021 | 50.5% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 1 | — | — | — | — | — |
| 1-bedroom apartments low sample (5) | 5 | AED 1.10M | 1 028 | 1 070 sqft | — | — |
| 2-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 19 Oct 2026 | Studio Flat | Ready | 467 sqft | AED 630 000 | 1 350 |
| 24 Sep 2026 | 2 B/R Flat | Ready | 1 376 sqft | AED 1 230 000 | 894 |
| 2 Apr 2026 | 1 B/R Flat | Ready | 943 sqft | AED 825 000 | 875 |
| 13 Jan 2026 | 1 B/R Flat | Ready | 992 sqft | AED 980 000 | 988 |
| 18 Dec 2025 | 1 B/R Flat | Ready | 1 070 sqft | AED 1 100 000 | 1 028 |
| 17 Nov 2025 | 1 B/R Flat | Ready | 1 070 sqft | AED 1 160 000 | 1 084 |
| 12 Nov 2025 | 1 B/R Flat | Ready | 1 070 sqft | AED 1 180 000 | 1 103 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for La Riviera Azure: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Dec 2022 – Nov 2023
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 4 | — | — | AED 3.67M |
| 2025 | 11 | AED 1.01M | 1 023 | AED 11.46M |
| 2024 | 9 | AED 1.01M | 1 018 | AED 9.64M |
| 2023 | 8 | AED 938k | 955 | AED 7.53M |
| 2022 | 73 | AED 750k | 768 | AED 55.52M |
| 2021 | 17 | AED 718k | 709 | AED 12.64M |
| 2020 | 1 | — | — | AED 11.50M |
| 2017 | 1 | — | — | AED 5.22M |
| 2015 | 1 | — | — | AED 7.49M |
| 2014 | 1 | — | — | AED 11.81M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2022–2026
| Year | 1-bed flat | Gross yield |
|---|---|---|
| 2026 YTD | 74k | — |
| 2025 | 80k | — |
| 2024 | 80k | — |
| 2023 | 76k | — |
| 2022 | 70k | 8.44% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Nov 2022 | 13 | AED 830k | 866 | 842 – 931 |
| Oct 2022 | 10 | AED 691k | 753 | 695 – 821 |
| Sep 2022 | 1 | — | — | — |
| Aug 2022 | 1 | — | — | — |
| Jul 2022 | 2 | — | — | — |
| Jun 2022 | 4 | — | — | — |
| May 2022 | 8 | AED 676k | 687 | 684 – 707 |
| Apr 2022 | 1 | — | — | — |
| Mar 2022 | 6 | AED 748k | 784 | 747 – 859 |
| Feb 2022 | 4 | — | — | — |
| Jan 2022 | 20 | AED 733k | 745 | 708 – 765 |
| Dec 2021 | 6 | AED 598k | 772 | 653 – 782 |
| Nov 2021 | 8 | AED 725k | 696 | 626 – 721 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 7 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Jumeirah Village Circle
Questions about La Riviera Azure
Who is the developer of La Riviera Azure?
The Dubai Land Department project registry lists Riviera Azure Properties Development as the developer of La Riviera Azure.
Is La Riviera Azure completed?
The DLD registry status of La Riviera Azure is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 15 May 2022 — a registry date, not a handover promise.
How many homes are in La Riviera Azure?
The DLD registry records 88 units in La Riviera Azure.
What is the price per square foot in La Riviera Azure?
Over the last 12 complete months the median registered sale in La Riviera Azure was AED 1.10M, or AED 1 028 per sqft, from 7 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for La Riviera Azure?
The escrow agent recorded by DLD for La Riviera Azure is United Bank Limited (Management Office).
Where is La Riviera Azure?
La Riviera Azure is in the Jumeirah Village Circle community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗