DubaiData

La Tilia At Villanova Phase 2

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

La Tilia At Villanova Phase 2 is a project by North Dubailand Projects L.L.C, recorded at 11% complete at its last Dubai Land Department inspection. 70 sales registered in the trailing 12 months at a median AED 3.45M (1 493 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 3.45M +9.0%
IQR AED 3.16M – AED 3.64M
DLD verified
Median price per sqft
AED 1 493/sqft +5.3%
IQR 1 272 – 1 674 AED/sqft
DLD verified
Registered sales
70 -82.6%
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 70 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperNorth Dubailand Projects L.L.C DLD verified
StatusActive DLD verified
Construction progress11% — at the last DLD inspection DLD verified
Registered with DLD23 Dec 2024 DLD verified
Construction started21 Jan 2025 DLD verified
Declared completion21 Aug 2028 — registry date, not a handover promise DLD verified
Units in the project440 DLD verified
Project area101 041 sqm DLD verified
Escrow agentFirst Abu Dhabi Bank P.J.S.C. DLD verified
Project number3456 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 2001 4001 600Jan 2025Mar 2025May 2025Jul 2025Sep 2025Nov 2025Jan 2026Mar 2026May 2026Jul 2026Sep 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 7 technical inspections for this project, from 18 Dec 2024 at 0.0% to 5 Oct 2026 at 10.6%. Since 26 Jun 2025 the recorded percentage has moved 0.68 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2028-08-212024-12-182026-10-05

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
5 Oct 202610.6% +5.2 pp
29 Jun 20265.3% +3.9 pp
24 Mar 20261.5% +0.4 pp
22 Dec 20251.1% +0.4 pp
8 Sep 20250.6% +0.5 pp
26 Jun 20250.1% +0.1 pp
18 Dec 20240.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Sep 20267 AED 3.48M1 143 1 103 – 1 306
Aug 20266 AED 3.24M1 480 1 227 – 1 547
Jul 20261 —— —
Jun 20264 —— —
May 20263 —— —
Apr 20264 —1 493 1 297 – 1 728
Mar 20264 —— —
Feb 202614 AED 3.47M1 674 1 537 – 1 737
Jan 202623 AED 3.16M1 664 1 319 – 1 677
Dec 20250 —— —
Nov 20251 —— —
Oct 20252 —— —
Sep 20251 —— —

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
3-bedroom apartments 38AED 3.16M 1 674 1 897 sqft — —
4-bedroom apartments 32AED 3.61M 1 260 2 980 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

020040020252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202667AED 3.45M 1 517AED 229.50M
2025406AED 3.16M 1 419AED 1.34B

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
29 Sep 20264 B/R Villa — La Tilia at Villanova Phase 2Off-plan 3 014 sqftAED 3 525 000 1 170
28 Sep 20264 B/R Villa — La Tilia at Villanova Phase 2Off-plan 3 352 sqftAED 3 577 000 1 067
28 Sep 20263 B/R Villa — La Tilia at Villanova Phase 2Off-plan 2 112 sqftAED 3 357 000 1 590
28 Sep 20264 B/R Villa — La Tilia at Villanova Phase 2Off-plan 4 086 sqftAED 4 568 000 1 118
25 Sep 20263 B/R Villa — La Tilia at Villanova Phase 2Off-plan 2 110 sqftAED 3 044 000 1 443
22 Sep 20264 B/R Villa — La Tilia at Villanova Phase 2Off-plan 3 014 sqftAED 3 446 000 1 143
14 Sep 20264 B/R Villa — La Tilia at Villanova Phase 2Off-plan 3 200 sqftAED 3 483 000 1 088
26 Aug 20263 B/R Villa — La Tilia at Villanova Phase 2Off-plan 2 110 sqftAED 3 284 000 1 557
21 Aug 20264 B/R Villa — La Tilia at Villanova Phase 2Off-plan 3 334 sqftAED 3 699 000 1 109
19 Aug 20264 B/R Villa — La Tilia at Villanova Phase 2Off-plan 3 852 sqftAED 4 450 000 1 155
18 Aug 20263 B/R Villa — La Tilia at Villanova Phase 2Off-plan 2 003 sqftAED 3 141 000 1 568
12 Aug 20263 B/R Villa — La Tilia at Villanova Phase 2Off-plan 2 110 sqftAED 3 044 000 1 443

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects by North Dubailand Projects L.L.C

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “La Tilia At Villanova Phase 2 — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/la-tilia-at-villanova-phase-2/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for La Tilia At Villanova Phase 2. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.