Legacy By Sunrise
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Legacy By Sunrise: ChatGPT · Claude · Perplexity
Legacy By Sunrise is a project by Sunrise Capital Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 10 sales registered in the trailing 12 months at a median AED 690k (1 612 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 10 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Sunrise Capital Real Estate Development L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 27 Sep 2023 |
| Construction started | 22 Oct 2022 |
| Declared completion | 15 May 2024 — registry date, not a handover promise |
| Units in the project | 132 |
| Project area | 8 368 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 2632 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jan 2025: in the 21 months since, no month reached the five registered sales a median needs (19 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 3 technical inspections for this project, from 4 Jul 2023 at 35.7% to 9 Jul 2024 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 9 Jul 2024 | 100.0% | +35.0 pp |
| 30 Nov 2023 | 65.0% | +29.3 pp |
| 4 Jul 2023 | 35.7% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (6) | 6 | AED 685k | 1 701 | 403 sqft | — | — |
| 1-bedroom apartments insufficient data | 4 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 23 Nov 2026 | 1 B/R Flat | Ready | 804 sqft | AED 1 190 000 | 1 480 |
| 29 Oct 2026 | Studio Flat | Ready | 412 sqft | AED 680 000 | 1 649 |
| 26 Oct 2026 | Studio Flat | Ready | 406 sqft | AED 640 000 | 1 575 |
| 20 Oct 2026 | 1 B/R Flat | Ready | 781 sqft | AED 1 100 000 | 1 409 |
| 30 Sep 2026 | 1 B/R Flat | Ready | 812 sqft | AED 1 050 000 | 1 293 |
| 29 Jul 2026 | Studio Flat | Ready | 391 sqft | AED 690 000 | 1 766 |
| 16 Jul 2026 | 1 B/R Flat | Ready | 808 sqft | AED 1 100 000 | 1 361 |
| 19 Feb 2026 | Studio Flat | Ready | 409 sqft | AED 690 000 | 1 686 |
| 7 Jan 2026 | 1 B/R Flat | Ready | 808 sqft | AED 1 200 000 | 1 485 |
| 26 Dec 2025 | Studio Flat | Ready | 399 sqft | AED 690 000 | 1 728 |
| 5 Nov 2025 | Studio Flat | Ready | 391 sqft | AED 670 000 | 1 715 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Legacy By Sunrise: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Feb 2025 – Jan 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 8 | AED 870k | 1 530 | AED 7.15M |
| 2025 | 16 | AED 1.10M | 1 484 | AED 18.20M |
| 2024 | 121 | AED 665k | 1 283 | AED 98.46M |
| 2023 | 24 | AED 832k | 1 128 | AED 19.30M |
| 2021 | 1 | — | — | AED 12.78M |
| 2016 | 1 | — | — | AED 12.27M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2024–2026
| Year | Studio | 1-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 50k | 82k | — |
| 2025 | 54k | 85k | — |
| 2024 | 52k | 89k | 8.97% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jan 2025 | 5 | AED 1.10M | 1 423 | 1 402 – 1 636 |
| Dec 2024 | 5 | AED 1.10M | 1 406 | 1 390 – 1 452 |
| Nov 2024 | 4 | — | — | — |
| Oct 2024 | 20 | AED 580k | 1 376 | 1 176 – 1 455 |
| Sep 2024 | 2 | — | — | — |
| Aug 2024 | 2 | — | — | — |
| Jul 2024 | 0 | — | — | — |
| Jun 2024 | 8 | AED 513k | 1 293 | 1 261 – 1 328 |
| May 2024 | 18 | AED 590k | 1 309 | 1 223 – 1 411 |
| Apr 2024 | 9 | AED 925k | 1 151 | 1 144 – 1 224 |
| Mar 2024 | 0 | — | — | — |
| Feb 2024 | 13 | AED 895k | 1 151 | 1 126 – 1 331 |
| Jan 2024 | 40 | AED 814k | 1 154 | 1 067 – 1 316 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 10 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Arjan
Questions about Legacy By Sunrise
Who is the developer of Legacy By Sunrise?
The Dubai Land Department project registry lists Sunrise Capital Real Estate Development L.L.C as the developer of Legacy By Sunrise.
Is Legacy By Sunrise completed?
The DLD registry status of Legacy By Sunrise is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 15 May 2024 — a registry date, not a handover promise.
How many homes are in Legacy By Sunrise?
The DLD registry records 132 units in Legacy By Sunrise.
What is the price per square foot in Legacy By Sunrise?
Over the last 12 complete months the median registered sale in Legacy By Sunrise was AED 690k, or AED 1 612 per sqft, from 10 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Legacy By Sunrise?
The escrow agent recorded by DLD for Legacy By Sunrise is Mashreq Bank Psc.
Where is Legacy By Sunrise?
Legacy By Sunrise is in the Arjan community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗