May Residence
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about May Residence: ChatGPT · Claude · Perplexity
May Residence is a project by May Real Estate Development, recorded at 100% complete at its last Dubai Land Department inspection. 31 sales registered in the trailing 12 months at a median AED 700k (847 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 31 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | May Real Estate Development |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 8 Nov 2015 |
| Construction started | 1 Jan 2016 |
| Declared completion | 29 Dec 2019 — registry date, not a handover promise |
| Units in the project | 339 |
| Project area | 24 463 sqm |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) |
| Project number | 1692 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2026: in the 2 months since, no month reached the five registered sales a median needs (2 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 2 Aug 2016 at 2.1% to 29 Dec 2019 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 29 Dec 2019 | 100.0% | +1.9 pp |
| 4 Sep 2019 | 98.1% | +30.5 pp |
| 7 Nov 2018 | 67.6% | +36.4 pp |
| 21 Feb 2018 | 31.1% | +27.0 pp |
| 26 Mar 2017 | 4.2% | +2.1 pp |
| 2 Aug 2016 | 2.1% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (8) | 8 | AED 500k | 1 185 | 422 sqft | — | — |
| 1-bedroom apartments | 22 | AED 750k | 808 | 910 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 23 Nov 2026 | 1 B/R Flat — Tower 5 | Ready | 1 225 sqft | AED 765 000 | 625 |
| 12 Nov 2026 | 1 B/R Flat — Tower 3 | Ready | 756 sqft | AED 750 000 | 992 |
| 5 Oct 2026 | 1 B/R Flat — Tower 3 | Ready | 1 217 sqft | AED 875 000 | 719 |
| 1 Oct 2026 | 1 B/R Flat — Tower 4 | Ready | 857 sqft | AED 660 000 | 770 |
| 24 Aug 2026 | 1 B/R Flat — Tower 2 | Ready | 1 218 sqft | AED 950 000 | 780 |
| 21 Aug 2026 | 1 B/R Flat — Tower 3 | Ready | 882 sqft | AED 600 000 | 681 |
| 13 Aug 2026 | 1 B/R Flat — Tower 5 | Ready | 1 075 sqft | AED 750 000 | 698 |
| 11 Aug 2026 | 1 B/R Flat — Tower 3 | Ready | 845 sqft | AED 660 000 | 781 |
| 7 Aug 2026 | Studio Flat — Tower 2 | Ready | 422 sqft | AED 510 000 | 1 209 |
| 27 Jul 2026 | Studio Flat — Tower 2 | Ready | 421 sqft | AED 500 000 | 1 187 |
| 14 Jul 2026 | Studio Flat — Tower 2 | Ready | 422 sqft | AED 435 000 | 1 031 |
| 10 Jul 2026 | 1 B/R Flat — Tower 1 | Ready | 758 sqft | AED 650 000 | 857 |
| 8 Jun 2026 | Studio Flat — Tower 3 | Ready | 422 sqft | AED 500 000 | 1 185 |
| 21 May 2026 | 1 B/R Flat — Tower 4 | Ready | 705 sqft | AED 499 950 | 709 |
| 7 Apr 2026 | 1 B/R Flat — Tower 3 | Ready | 1 167 sqft | AED 763 000 | 654 |
| 6 Apr 2026 | Studio Flat — Tower 2 | Ready | 464 sqft | AED 498 000 | 1 072 |
| 23 Feb 2026 | 1 B/R Flat — Tower 1 | Ready | 928 sqft | AED 700 000 | 754 |
| 23 Feb 2026 | 1 B/R Flat — Tower 4 | Ready | 882 sqft | AED 795 000 | 902 |
| 20 Feb 2026 | 1 B/R Flat — Tower 2 | Ready | 721 sqft | AED 750 000 | 1 041 |
| 18 Feb 2026 | 1 B/R Flat — Tower 2 | Ready | 1 354 sqft | AED 902 088 | 666 |
| 18 Feb 2026 | Shop Show Rooms — Tower 1 | Ready | 1 419 sqft | AED 1 300 000 | — |
| 13 Feb 2026 | 1 B/R Flat — Tower 1 | Ready | 927 sqft | AED 810 775 | 874 |
| 6 Feb 2026 | 1 B/R Flat — Tower 4 | Ready | 881 sqft | AED 740 000 | 840 |
| 4 Feb 2026 | 1 B/R Flat — Tower 5 | Ready | 928 sqft | AED 775 000 | 835 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for May Residence: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 29 | AED 700k | 854 | AED 20.08M |
| 2025 | 69 | AED 636k | 759 | AED 44.67M |
| 2024 | 148 | AED 611k | 743 | AED 92.35M |
| 2023 | 160 | AED 535k | 700 | AED 86.49M |
| 2022 | 3 | — | — | AED 3.52M |
| 2021 | 8 | AED 282k | 663 | AED 4.77M |
| 2019 | 5 | AED 650k | 692 | AED 2.92M |
| 2018 | 19 | AED 395k | 675 | AED 9.01M |
| 2017 | 31 | AED 389k | 837 | AED 11.87M |
| 2016 | 57 | AED 364k | 850 | AED 22.26M |
| 2015 | 1 | — | — | AED 10.25M |
| 2014 | 1 | — | — | AED 9.93M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2020–2026
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | Studio | 1-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 42k | 60k | 8.00% |
| 2025 | 42k | 60k | 9.23% |
| 2024 | 40k | 58k | 9.46% |
| 2023 | 31k | 44k | 8.20% |
| 2022 | 26k | 37k | — |
| 2021 | 21k | 32k | — |
| 2020 | 34k | 40k | — |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2026 | 5 | AED 660k | 780 | 698 – 781 |
| Jul 2026 | 3 | — | — | — |
| Jun 2026 | 1 | — | — | — |
| May 2026 | 1 | — | — | — |
| Apr 2026 | 2 | — | — | — |
| Mar 2026 | 0 | — | — | — |
| Feb 2026 | 8 | AED 785k | 840 | 795 – 888 |
| Jan 2026 | 7 | AED 665k | 877 | 860 – 1 065 |
| Dec 2025 | 2 | — | — | — |
| Nov 2025 | 0 | — | — | — |
| Oct 2025 | 3 | — | — | — |
| Sep 2025 | 6 | AED 575k | 907 | 772 – 1 067 |
| Aug 2025 | 7 | AED 675k | 864 | 829 – 930 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| May Residence Tower 2 low sample (8) | 8 | AED 630k | 1 036 | 0.0% |
| May Residence Tower 3 low sample (7) | 7 | AED 600k | 781 | 0.0% |
| May Residence Tower 1 low sample (7) | 7 | AED 670k | 866 | 0.0% |
| May Residence Tower 5 low sample (5) | 5 | AED 775k | 835 | 0.0% |
| May Residence Tower 4 insufficient data | 4 | — | — | 0.0% |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of May Residence. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Bloom Towers Finished · Bloom Heights Properties L.L.C |
48 m | 100% |
| Spica Finished · Five Elements Real Estate Development L.L.C |
146 m | 100% |
| Hanover Square Finished · Acw Holding Ltd |
195 m | 100% |
| Luma22 Finished · Townx Real Estate Development L.L.C |
241 m | 100% |
| The Habitat Finished · Radiant Star Properties L.L.C |
277 m | 100% |
| Park Villa'S Finished · Arabian Gulf Properties |
280 m | 100% |
| Haven Villas 1 Finished · Gnhomes Real Estate Development L.L.C |
329 m | 100% |
| Signature Livings Finished · Green Properties Development Co. L.L.C |
331 m | 100% |
| Haven Villas Finished · Gnhomes Real Estate Development L.L.C |
340 m | 100% |
| Manhattan Finished · Al Fara'A Properties (Llc) |
416 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Jumeirah Village Circle
Questions about May Residence
Who is the developer of May Residence?
The Dubai Land Department project registry lists May Real Estate Development as the developer of May Residence.
Is May Residence completed?
The DLD registry status of May Residence is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 29 Dec 2019 — a registry date, not a handover promise.
How many homes are in May Residence?
The DLD registry records 339 units in May Residence.
What is the price per square foot in May Residence?
Over the last 12 complete months the median registered sale in May Residence was AED 700k, or AED 847 per sqft, from 31 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for May Residence?
The escrow agent recorded by DLD for May Residence is Emirates Nbd Bank (P.J.S.C).
Where is May Residence?
May Residence is in the Jumeirah Village Circle community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Bloom Towers, about 48 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗