Data Dubai

Murooj Alfurjan West

Murooj Alfurjan WestFinished100% built524 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Murooj Alfurjan West: ChatGPT · Claude · Perplexity

Murooj Alfurjan West is a project by Alfurjan ( L.L.C ), recorded at 100% complete at its last Dubai Land Department inspection. 24 sales registered in the trailing 12 months at a median AED 4.90M. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 4.90M +11.4% y/y
≈ US$ 1.33M · typical range AED 4.34M – AED 5.05M
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
24 -85.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 24 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAlfurjan ( L.L.C )
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD11 Jul 2021
Construction started30 Nov 2021
Declared completion24 Sep 2024 — registry date, not a handover promise
Units in the project524
Project area269 890 sqm
Escrow agentDubai Islamic Bank (Public Joint Stock Company)
Project number2273

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 8 technical inspections for this project, from 4 Apr 2022 at 0.0% to 24 Sep 2024 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2024-09-242022-04-042024-09-24

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
24 Sep 2024100.0% +17.3 pp
15 Feb 202482.7% +14.4 pp
17 Oct 202368.3% +13.6 pp
27 Jul 202354.7% +22.1 pp
15 Mar 202332.6% +12.6 pp
13 Dec 202220.0% +16.6 pp
15 Sep 20223.5% +3.5 pp
4 Apr 20220.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
19 Nov 2026LandReady 4 041 sqftAED 5 850 000 —
19 Nov 2026LandReady 2 562 sqftAED 4 650 000 —
13 Nov 2026LandReady 2 562 sqftAED 4 650 000 —
13 Nov 2026LandReady 4 024 sqftAED 4 995 000 —
9 Oct 2026LandReady 2 862 sqftAED 4 200 000 —
24 Sep 2026LandReady 3 567 sqftAED 5 555 555 —
15 Sep 2026LandReady 2 565 sqftAED 4 700 000 —
5 Aug 2026LandReady 2 850 sqftAED 4 350 000 —
22 Jul 2026LandReady 2 562 sqftAED 4 150 000 —
6 Jul 2026LandReady 2 745 sqftAED 4 650 000 —
21 May 2026LandReady 2 562 sqftAED 4 150 000 —
20 May 2026LandReady 3 875 sqftAED 5 850 000 —
30 Mar 2026LandReady 2 741 sqftAED 4 995 000 —
24 Mar 2026LandReady 4 137 sqftAED 4 990 000 —
18 Mar 2026LandReady 3 952 sqftAED 4 990 000 —
9 Mar 2026LandReady 2 745 sqftAED 4 500 000 —
24 Feb 2026LandReady 2 562 sqftAED 4 260 000 —
6 Feb 2026LandReady 3 617 sqftAED 5 500 000 —
5 Feb 2026LandReady 3 617 sqftAED 4 995 000 —
28 Jan 2026LandReady 3 875 sqftAED 5 400 000 —
23 Jan 2026LandReady 4 041 sqftAED 5 220 000 —
13 Jan 2026LandReady 3 617 sqftAED 4 900 000 —
5 Jan 2026LandReady 4 318 sqftAED 4 975 000 —
22 Dec 2025LandReady 3 617 sqftAED 5 750 000 —

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Murooj Alfurjan West: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

02004002021202220232024202520260200400202120222023202420252026

registered sales per calendar year; the current year is incomplete

By month

024NovDecJanFebMarAprMayJunJulAugSepOct024DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202619AED 4.97M —AED 92.33M
2025148AED 4.41M —AED 663.87M
202468AED 3.38M —AED 240.12M
2023131AED 2.60M —AED 339.84M
2022416AED 2.06M —AED 868.45M
202185AED 2.09M —AED 181.12M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Al Furjan

Questions about Murooj Alfurjan West

Who is the developer of Murooj Alfurjan West?

The Dubai Land Department project registry lists Alfurjan ( L.L.C ) as the developer of Murooj Alfurjan West.

Is Murooj Alfurjan West completed?

The DLD registry status of Murooj Alfurjan West is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 24 Sep 2024 — a registry date, not a handover promise.

How many homes are in Murooj Alfurjan West?

The DLD registry records 524 units in Murooj Alfurjan West.

What is the price per square foot in Murooj Alfurjan West?

Too few sales were registered in Murooj Alfurjan West in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Murooj Alfurjan West?

The escrow agent recorded by DLD for Murooj Alfurjan West is Dubai Islamic Bank (Public Joint Stock Company).

Where is Murooj Alfurjan West?

Murooj Alfurjan West is in the Al Furjan community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Murooj Alfurjan West — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/murooj-alfurjan-west/”. Reuse is permitted with attribution.