Nadine Residences 2 is a project by London Gate Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 11 sales registered in the trailing 12 months at a median AED 1.90M (1 487 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 11 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | London Gate Real Estate Development L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 12 Oct 2023 |
| Construction started | 1 Aug 2023 |
| Units in the project | 102 |
| Project area | 13 156 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 2749 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2025: in the 14 months since, no month reached the five registered sales a median needs (16 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 4 technical inspections for this project, from 26 Sep 2023 at 35.3% to 13 Feb 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 13 Feb 2025 | 100.0% | +7.9 pp |
| 2 Sep 2024 | 92.1% | +35.5 pp |
| 5 Mar 2024 | 56.6% | +21.3 pp |
| 26 Sep 2023 | 35.3% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments insufficient data | 2 | — | — | — | — | — |
| 2-bedroom apartments low sample (7) | 7 | AED 1.90M | 1 487 | 1 290 sqft | — | — |
| 3-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 8 Apr 2026 | 2 B/R Flat | Ready | 1 463 sqft | AED 2 100 000 | 1 436 |
| 4 Mar 2026 | 2 B/R Flat | Ready | 1 231 sqft | AED 1 900 000 | 1 544 |
| 10 Feb 2026 | 3 B/R Flat | Ready | 1 542 sqft | AED 2 300 000 | 1 492 |
| 4 Feb 2026 | 1 B/R Flat | Ready | 801 sqft | AED 700 000 | 874 |
| 26 Jan 2026 | 1 B/R Flat | Ready | 798 sqft | AED 1 210 000 | 1 515 |
| 22 Dec 2025 | 2 B/R Flat | Ready | 1 219 sqft | AED 1 825 000 | 1 497 |
| 22 Dec 2025 | 2 B/R Flat | Ready | 1 396 sqft | AED 2 080 000 | 1 490 |
| 16 Dec 2025 | 2 B/R Flat | Ready | 1 290 sqft | AED 1 850 000 | 1 434 |
| 9 Dec 2025 | 2 B/R Flat | Ready | 1 435 sqft | AED 2 000 000 | 1 394 |
| 11 Nov 2025 | 3 B/R Flat | Ready | 1 831 sqft | AED 2 410 000 | 1 316 |
| 6 Nov 2025 | 2 B/R Flat | Ready | 1 103 sqft | AED 1 640 000 | 1 487 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Nadine Residences 2: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Sep 2025 – Aug 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 5 | AED 1.90M | 1 492 | AED 8.21M |
| 2025 | 27 | AED 1.82M | 1 378 | AED 49.49M |
| 2024 | 107 | AED 1.42M | 1 042 | AED 152.09M |
| 2020 | 1 | — | — | AED 11.60M |
| 2019 | 1 | — | — | AED 8.56M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2025 | 5 | AED 1.72M | 1 350 | 1 336 – 1 414 |
| Jul 2025 | 4 | — | — | — |
| Jun 2025 | 7 | AED 1.75M | 1 357 | 1 144 – 1 369 |
| May 2025 | 0 | — | — | — |
| Apr 2025 | 0 | — | — | — |
| Mar 2025 | 0 | — | — | — |
| Feb 2025 | 0 | — | — | — |
| Jan 2025 | 0 | — | — | — |
| Dec 2024 | 1 | — | — | — |
| Nov 2024 | 1 | — | — | — |
| Oct 2024 | 0 | — | — | — |
| Sep 2024 | 0 | — | — | — |
| Aug 2024 | 1 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 11 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Al Furjan
Questions about Nadine Residences 2
Who is the developer of Nadine Residences 2?
The Dubai Land Department project registry lists London Gate Real Estate Development L.L.C as the developer of Nadine Residences 2.
Is Nadine Residences 2 completed?
The DLD registry status of Nadine Residences 2 is Finished, 100% complete at the last DLD inspection.
How many homes are in Nadine Residences 2?
The DLD registry records 102 units in Nadine Residences 2.
What is the price per square foot in Nadine Residences 2?
Over the last 12 complete months the median registered sale in Nadine Residences 2 was AED 1.90M, or AED 1 487 per sqft, from 11 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Nadine Residences 2?
The escrow agent recorded by DLD for Nadine Residences 2 is Mashreq Bank Psc.
Where is Nadine Residences 2?
Nadine Residences 2 is in the Al Furjan community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗