Oxford 212
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Oxford 212: ChatGPT · Claude · Perplexity
Oxford 212 is a project by Iman Developers L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 25 sales registered in the trailing 12 months at a median AED 1.15M (1 827 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 25 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Iman Developers L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 22 Feb 2022 |
| Construction started | 8 Aug 2021 |
| Declared completion | 28 Feb 2023 — registry date, not a handover promise |
| Units in the project | 212 |
| Project area | 13 335 sqm |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) |
| Project number | 2321 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Feb 2025: in the 20 months since, no month reached the five registered sales a median needs (27 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 5 technical inspections for this project, from 22 Dec 2021 at 20.3% to 15 May 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 15 May 2023 | 100.0% | +22.0 pp |
| 23 Nov 2022 | 78.0% | +19.8 pp |
| 25 Aug 2022 | 58.3% | +19.9 pp |
| 19 Apr 2022 | 38.4% | +18.1 pp |
| 22 Dec 2021 | 20.3% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (7) | 7 | AED 770k | 1 980 | 393 sqft | — | — |
| 1-bedroom apartments low sample (17) | 17 | AED 1.33M | 1 599 | 788 sqft | — | — |
| 2-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 3 Nov 2026 | Studio Flat | Ready | 390 sqft | AED 600 000 | 1 539 |
| 28 Oct 2026 | 1 B/R Flat | Ready | 818 sqft | AED 1 150 000 | 1 405 |
| 20 Oct 2026 | 1 B/R Flat | Ready | 879 sqft | AED 1 240 000 | 1 411 |
| 24 Sep 2026 | Studio Flat | Ready | 415 sqft | AED 750 000 | 1 809 |
| 22 Sep 2026 | 2 B/R Flat | Ready | 1 701 sqft | AED 2 010 000 | 1 182 |
| 7 Aug 2026 | 1 B/R Flat | Ready | 985 sqft | AED 55 006 | 56 |
| 30 Jul 2026 | 1 B/R Flat | Ready | 752 sqft | AED 14 813 | 20 |
| 30 Jul 2026 | 1 B/R Flat | Ready | 781 sqft | AED 36 629 | 47 |
| 30 Jul 2026 | 1 B/R Flat | Ready | 596 sqft | AED 29 184 | 49 |
| 30 Jul 2026 | 1 B/R Flat | Ready | 798 sqft | AED 3 577 | 4 |
| 27 Jul 2026 | 1 B/R Flat | Ready | 851 sqft | AED 34 191 | 40 |
| 7 Jul 2026 | 1 B/R Flat | Ready | 788 sqft | AED 1 260 000 | 1 598 |
| 13 May 2026 | Studio Flat | Ready | 367 sqft | AED 750 000 | 2 045 |
| 4 May 2026 | Studio Flat | Ready | 430 sqft | AED 785 000 | 1 827 |
| 30 Mar 2026 | 1 B/R Flat | Ready | 712 sqft | AED 1 380 000 | 1 938 |
| 3 Mar 2026 | Studio Flat | Ready | 393 sqft | AED 780 000 | 1 985 |
| 16 Feb 2026 | 1 B/R Flat | Ready | 860 sqft | AED 1 375 000 | 1 599 |
| 15 Jan 2026 | 1 B/R Flat | Ready | 798 sqft | AED 215 124 | 270 |
| 15 Jan 2026 | 1 B/R Flat | Ready | 781 sqft | AED 98 995 | 127 |
| 13 Jan 2026 | 1 B/R Flat | Ready | 851 sqft | AED 33 551 | 39 |
| 12 Jan 2026 | 1 B/R Flat | Ready | 752 sqft | AED 59 899 | 80 |
| 25 Dec 2025 | 1 B/R Flat | Ready | 722 sqft | AED 1 334 000 | 1 846 |
| 17 Dec 2025 | Studio Flat | Ready | 376 sqft | AED 820 000 | 2 183 |
| 8 Dec 2025 | Studio Flat | Ready | 384 sqft | AED 760 000 | 1 980 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Oxford 212: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Mar 2025 – Feb 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 20 | AED 1.20M | 1 704 | AED 11.48M |
| 2025 | 24 | AED 1.09M | 1 968 | AED 29.04M |
| 2024 | 44 | AED 940k | 1 788 | AED 48.00M |
| 2023 | 137 | AED 694k | 1 288 | AED 106.78M |
| 2022 | 152 | AED 558k | 1 037 | AED 98.10M |
| 2020 | 2 | — | — | AED 14.00M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2023–2026
| Year | Studio | 1-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 57k | 90k | — |
| 2025 | 60k | 100k | — |
| 2024 | 60k | 95k | 7.44% |
| 2023 | 55k | 90k | 8.90% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Feb 2025 | 7 | AED 1.35M | 1 967 | 1 622 – 1 970 |
| Jan 2025 | 0 | — | — | — |
| Dec 2024 | 2 | — | — | — |
| Nov 2024 | 6 | AED 790k | 1 786 | 1 288 – 1 934 |
| Oct 2024 | 6 | AED 1.37M | 1 695 | 1 658 – 1 826 |
| Sep 2024 | 3 | — | — | — |
| Aug 2024 | 5 | AED 1.30M | 1 805 | 1 612 – 1 843 |
| Jul 2024 | 3 | — | — | — |
| Jun 2024 | 2 | — | — | — |
| May 2024 | 5 | AED 840k | 1 987 | 1 835 – 2 128 |
| Apr 2024 | 1 | — | — | — |
| Mar 2024 | 5 | AED 770k | 1 683 | 1 665 – 1 866 |
| Feb 2024 | 3 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Jumeirah Village Circle
Questions about Oxford 212
Who is the developer of Oxford 212?
The Dubai Land Department project registry lists Iman Developers L.L.C as the developer of Oxford 212.
Is Oxford 212 completed?
The DLD registry status of Oxford 212 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 28 Feb 2023 — a registry date, not a handover promise.
How many homes are in Oxford 212?
The DLD registry records 212 units in Oxford 212.
What is the price per square foot in Oxford 212?
Over the last 12 complete months the median registered sale in Oxford 212 was AED 1.15M, or AED 1 827 per sqft, from 25 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Oxford 212?
The escrow agent recorded by DLD for Oxford 212 is Emirates Nbd Bank (P.J.S.C).
Where is Oxford 212?
Oxford 212 is in the Jumeirah Village Circle community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗