Data Dubai

Palace Tower

Palace TowerFinished100% built597 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Palace Tower: ChatGPT · Claude · Perplexity

Palace Tower is a project by Tameer Holding Investment (Llc), recorded at 100% complete at its last Dubai Land Department inspection. 43 sales registered in the trailing 12 months at a median AED 470k (907 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 470k -6.0% y/y
≈ US$ 128k · typical range AED 426k – AED 878k
DLD verified
Median price per sqft
AED 907/sqft +5.1% y/y
typical range 849 – 994 AED/sqft
DLD verified
Registered sales
43 -34.8% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 43 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperTameer Holding Investment (Llc)
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD8 Nov 2008
Construction started20 Mar 2007
Declared completion25 Aug 2009 — registry date, not a handover promise
Units in the project597
Project area55 558 sqm
Escrow agentAbu Dhabi Islamic Bank
Project number213

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

5007501 0001 250Nov 2022May 2023Nov 2023May 2024Nov 2024May 2025Nov 2025May 20265007501 0001 250Nov 2022Mar 2024Jul 2025

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2026: in the 3 months since, no month reached the five registered sales a median needs (5 in total) · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios 22AED 426k 962 459 sqft — —
1-bedroom apartments insufficient data 3— — — — —
2-bedroom apartments low sample (7) 7AED 840k 849 990 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
13 Nov 20261 B/R Flat — T2Ready 765 sqftAED 585 000 765
28 Oct 2026Office — S T1Ready 2 205 sqftAED 1 530 000 —
5 Oct 2026Studio Flat — T2Ready 344 sqftAED 395 000 1 149
5 Oct 2026Office — S T1Ready 1 777 sqftAED 1 500 000 —
1 Oct 2026Studio Flat — T2Ready 470 sqftAED 435 000 925
14 Sep 20262 B/R Flat — T2Ready 990 sqftAED 840 000 849
21 Aug 20262 B/R Flat — T2Ready 990 sqftAED 860 000 869
20 Aug 2026Studio Flat — T2Ready 344 sqftAED 390 000 1 135
22 Jul 2026Studio Flat — T2Ready 459 sqftAED 445 000 969
20 Jul 2026Studio Flat — T2Ready 472 sqftAED 320 000 678
14 Jul 2026Studio Flat — T2Ready 431 sqftAED 400 000 927
9 Jul 2026Studio Flat — T2Ready 431 sqftAED 460 000 1 067
3 Jul 2026Studio Flat — T2Ready 470 sqftAED 470 000 999
29 Jun 20261 B/R Flat — T2Ready 826 sqftAED 555 000 672
8 Jun 2026Studio Flat — T2Ready 482 sqftAED 417 685 867
20 May 2026Studio Flat — T2Ready 459 sqftAED 407 000 887
5 May 20262 B/R Flat — T2Ready 990 sqftAED 880 000 889
30 Apr 2026Office — S T1Ready 1 574 sqftAED 1 350 000 —
15 Apr 2026Studio Flat — T2Ready 482 sqftAED 470 000 976
15 Apr 2026Studio Flat — T2Ready 431 sqftAED 450 000 1 043
7 Apr 20261 B/R Flat — T2Ready 826 sqftAED 595 000 720
7 Apr 20262 B/R Flat — T2Ready 990 sqftAED 840 000 849
26 Mar 2026Studio Flat — T2Ready 470 sqftAED 440 000 935
9 Mar 2026Studio Flat — T2Ready 459 sqftAED 407 000 887

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Palace Tower: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

02040602015201620172018201920202021202220232024202520260204060201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

0258NovDecJanFebMarAprMayJunJulAugSepOct0258DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202634AED 470k 889AED 23.62M
202562AED 580k 914AED 47.67M
202467AED 410k 850AED 36.99M
202369AED 340k 672AED 26.39M
202241AED 303k 595AED 19.33M
202135AED 390k 470AED 15.28M
202015AED 250k 542AED 4.71M
201924AED 424k 625AED 12.49M
201825AED 590k 744AED 15.58M
201736AED 440k 935AED 18.34M
201635AED 450k 927AED 23.56M
201542AED 619k 924AED 29.22M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2012–2026

20k30k40k20122013201420152016201720182019202020212022202320242025202620k30k40k201220172022

Studio: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
YearStudio1-bed flat2-bed flatGross yield
2026 YTD 39k54k70k9.14%
2025 38k53k69k9.05%
2024 33k50k63k9.04%
2023 30k40k56k10.00%
2022 25k34k49k10.00%
2021 22k31k42k—
2020 24k35k50k—
2019 30k40k55k—
2018 35k50k65k—
2017 40k56k70k9.64%
2016 40k64k80k9.64%
2015 40k60k80k9.64%
2014 35k50k74k8.24%
2013 29k50k60k8.91%
2012 26k——10.11%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jul 20265 AED 445k969 927 – 999
Jun 20262 —— —
May 20262 —— —
Apr 20265 AED 595k— —
Mar 20263 —— —
Feb 20264 —— —
Jan 20266 AED 858k— —
Dec 20258 AED 854k— —
Nov 20251 —— —
Oct 20259 AED 625k1 222 889 – 1 302
Sep 20255 AED 455k884 818 – 1 025
Aug 20253 —— —
Jul 20255 AED 430k997 782 – 1 164

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

Buildings in this project

Building (DLD name)SalesMedian priceMedian AED/sqftOff-plan
Palace Tower T2 32AED 442k 9070.0%
Palace Towers T1 low sample (11) 11AED 1.35M —0.0%
Palace Towers T3 insufficient data 0— ——

Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Palace Tower. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Ruby Residence
Finished · Deyaar Development (P.J.S.C)
142 m100%138
Silicon Gate 1
Finished · Time Properties
143 m100%888
Silicon Information Technology Tower
Finished · Sit Tower Fzco
212 m100%392
Sapphire Residence
Finished · Deyaar Development (P.J.S.C)
216 m100%90
S.P Oasis
Finished · S.P. Oasis Limited
244 m100%68
Silicon Avenue
Finished · York Shire Corporation Limited
268 m100%106
Serenity Heights
Cancelled · Sariin S.R.O ( Representativf Office )
300 m63%1
La Visita 01
Finished · Al Manal Development Fzco
354 m100%128
Oasis High Park
Finished · Mohd. Hussain & Bros
379 m100%159
La Visita 02
Finished · Al Manal Development Fzco
399 m100%128

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Silicon Oasis

Questions about Palace Tower

Who is the developer of Palace Tower?

The Dubai Land Department project registry lists Tameer Holding Investment (Llc) as the developer of Palace Tower.

Is Palace Tower completed?

The DLD registry status of Palace Tower is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 25 Aug 2009 — a registry date, not a handover promise.

How many homes are in Palace Tower?

The DLD registry records 597 units in Palace Tower.

What is the price per square foot in Palace Tower?

Over the last 12 complete months the median registered sale in Palace Tower was AED 470k, or AED 907 per sqft, from 43 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Palace Tower?

The escrow agent recorded by DLD for Palace Tower is Abu Dhabi Islamic Bank.

Where is Palace Tower?

Palace Tower is in the Silicon Oasis community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Ruby Residence, about 142 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Palace Tower — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/palace-tower/”. Reuse is permitted with attribution.