Park Views Residences A
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Park Views Residences A: ChatGPT · Claude · Perplexity
Park Views Residences A is a project by Park 1 L.L.C, recorded at 96% complete at its last Dubai Land Department inspection. 39 sales registered in the trailing 12 months at a median AED 2.59M (2 148 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 39 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Park 1 L.L.C |
| Status | Active |
| Construction progress | 96% — at the last DLD inspection |
| Registered with DLD | 13 Feb 2024 |
| Construction started | 25 Jul 2023 |
| Units in the project | 615 |
| Project area | 71 758 sqm |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) |
| Project number | 2630 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2026: in the 3 months since, no month reached the five registered sales a median needs (6 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 5 Apr 2023 at 0.0% to 8 Sep 2026 at 95.5%. Over the inspections since 8 May 2025 it moved 3.17 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 8 Sep 2026 | 95.5% | +15.5 pp |
| 20 Feb 2026 | 80.0% | +35.2 pp |
| 8 May 2025 | 44.8% | +20.9 pp |
| 2 Dec 2024 | 23.9% | +13.2 pp |
| 7 May 2024 | 10.7% | +10.7 pp |
| 5 Apr 2023 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
Off-plan sale registrations in Park Views Residences A (617) already equal 100% of the 602 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.
| Homes | In unit register | Registered sales |
|---|---|---|
| 1 bedroom | 63 | 58 |
| 2 bedrooms | 395 | 415 |
| 3 bedrooms | 140 | 140 |
| 4+ bedrooms | 4 | 4 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments insufficient data | 3 | — | — | — | — | — |
| 2-bedroom apartments | 25 | AED 2.45M | 2 086 | 1 138 sqft | — | — |
| 3-bedroom apartments low sample (10) | 10 | AED 3.39M | 2 154 | 1 571 sqft | — | — |
| 4-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 18 Nov 2026 | 2 B/R Flat | Off-plan | 1 131 sqft | AED 2 362 777 | 2 089 |
| 6 Nov 2026 | 2 B/R Flat | Off-plan | 1 336 sqft | AED 2 665 000 | 1 995 |
| 26 Oct 2026 | 2 B/R Flat | Off-plan | 1 138 sqft | AED 2 282 777 | 2 006 |
| 22 Sep 2026 | 2 B/R Flat | Off-plan | 1 271 sqft | AED 2 581 777 | 2 031 |
| 18 Sep 2026 | 4 B/R Flat | Off-plan | 2 200 sqft | AED 5 231 777 | 2 378 |
| 18 Sep 2026 | 2 B/R Flat | Off-plan | 1 182 sqft | AED 2 465 777 | 2 086 |
| 14 Sep 2026 | 2 B/R Flat | Off-plan | 1 140 sqft | AED 2 300 000 | 2 018 |
| 18 Aug 2026 | 2 B/R Flat | Off-plan | 1 138 sqft | AED 2 443 777 | 2 148 |
| 15 Jul 2026 | 3 B/R Flat | Off-plan | 1 571 sqft | AED 3 457 777 | 2 201 |
| 15 Jul 2026 | 2 B/R Flat | Off-plan | 1 147 sqft | AED 2 900 000 | 2 529 |
| 13 Jul 2026 | 3 B/R Flat | Off-plan | 1 599 sqft | AED 3 417 777 | 2 137 |
| 10 Jul 2026 | 2 B/R Flat | Off-plan | 1 131 sqft | AED 2 600 000 | 2 299 |
| 6 Jul 2026 | 2 B/R Flat | Off-plan | 11 sqft | AED 25 438 | 2 251 |
| 2 Jul 2026 | 2 B/R Flat | Off-plan | 1 621 sqft | AED 3 162 777 | 1 952 |
| 1 Jul 2026 | 3 B/R Flat | Off-plan | 1 571 sqft | AED 3 248 777 | 2 068 |
| 1 Jul 2026 | 2 B/R Flat | Off-plan | 1 120 sqft | AED 2 097 777 | 1 873 |
| 29 Jun 2026 | 2 B/R Flat | Off-plan | 1 139 sqft | AED 2 500 000 | 2 196 |
| 25 Jun 2026 | 2 B/R Flat | Off-plan | 1 134 sqft | AED 2 305 777 | 2 034 |
| 23 Jun 2026 | 3 B/R Flat | Off-plan | 1 571 sqft | AED 3 393 777 | 2 160 |
| 10 Jun 2026 | 3 B/R Flat | Off-plan | 1 571 sqft | AED 3 565 777 | 2 270 |
| 2 Jun 2026 | 3 B/R Flat | Off-plan | 1 572 sqft | AED 3 395 777 | 2 161 |
| 13 May 2026 | 2 B/R Flat | Off-plan | 1 058 sqft | AED 2 400 000 | 2 268 |
| 1 May 2026 | 3 B/R Flat | Off-plan | 1 571 sqft | AED 3 372 777 | 2 147 |
| 14 Apr 2026 | 3 B/R Flat | Off-plan | 1 598 sqft | AED 3 307 777 | 2 070 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Park Views Residences A: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 33 | AED 2.65M | 2 148 | AED 88.79M |
| 2025 | 154 | AED 2.37M | 2 064 | AED 390.73M |
| 2024 | 428 | AED 2.35M | 2 052 | AED 1.08B |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2026 | 7 | AED 3.16M | 2 169 | 2 039 – 2 263 |
| Jun 2026 | 5 | AED 3.39M | 2 161 | 2 160 – 2 196 |
| May 2026 | 2 | — | — | — |
| Apr 2026 | 7 | AED 1.89M | 2 115 | 2 077 – 2 192 |
| Mar 2026 | 1 | — | — | — |
| Feb 2026 | 2 | — | — | — |
| Jan 2026 | 2 | — | — | — |
| Dec 2025 | 2 | — | — | — |
| Nov 2025 | 4 | — | — | — |
| Oct 2025 | 3 | — | — | — |
| Sep 2025 | 5 | AED 2.43M | 2 125 | 2 073 – 2 186 |
| Aug 2025 | 3 | — | — | — |
| Jul 2025 | 3 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Wasl 1
Questions about Park Views Residences A
Who is the developer of Park Views Residences A?
The Dubai Land Department project registry lists Park 1 L.L.C as the developer of Park Views Residences A.
Is Park Views Residences A completed?
The DLD registry status of Park Views Residences A is Active, 96% complete at the last DLD inspection.
How many homes are in Park Views Residences A?
The DLD registry records 615 units in Park Views Residences A. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Park Views Residences A?
Over the last 12 complete months the median registered sale in Park Views Residences A was AED 2.59M, or AED 2 148 per sqft, from 39 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Park Views Residences A?
The escrow agent recorded by DLD for Park Views Residences A is Emirates Nbd Bank (P.J.S.C).
Where is Park Views Residences A?
Park Views Residences A is in the Wasl 1 community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Park Views Residences A. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.