Prime Residency 3
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Prime Residency 3: ChatGPT · Claude · Perplexity
Prime Residency 3 is a project by Prescott Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 25 sales registered in the trailing 12 months at a median AED 685k (1 556 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 25 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Prescott Real Estate Development L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 3 Oct 2021 |
| Construction started | 1 Jun 2021 |
| Declared completion | 6 Dec 2024 — registry date, not a handover promise |
| Units in the project | 292 |
| Project area | 13 250 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 2276 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Dec 2025: in the 10 months since, no month reached the five registered sales a median needs (18 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 12 technical inspections for this project, from 10 Aug 2021 at 10.0% to 6 Dec 2024 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 6 Dec 2024 | 100.0% | +9.2 pp |
| 30 Apr 2024 | 90.8% | +15.4 pp |
| 18 Dec 2023 | 75.3% | +12.3 pp |
| 5 Oct 2023 | 63.0% | +10.7 pp |
| 17 Jul 2023 | 52.4% | +12.3 pp |
| 13 Mar 2023 | 40.1% | +12.0 pp |
| 31 Oct 2022 | 28.1% | +7.9 pp |
| 18 May 2022 | 20.2% | +1.7 pp |
| 5 Apr 2022 | 18.5% | +2.3 pp |
| 27 Jan 2022 | 16.2% | +1.0 pp |
| 19 Sep 2021 | 15.1% | +5.1 pp |
| 10 Aug 2021 | 10.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios | 20 | AED 672k | 1 620 | 419 sqft | — | — |
| 1-bedroom apartments low sample (5) | 5 | AED 1.12M | 1 377 | 837 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 16 Nov 2026 | Studio Flat | Ready | 426 sqft | AED 606 672 | 1 425 |
| 28 Sep 2026 | 1 B/R Flat | Ready | 837 sqft | AED 1 000 000 | 1 195 |
| 9 Sep 2026 | Studio Flat | Ready | 394 sqft | AED 615 000 | 1 560 |
| 2 Sep 2026 | Studio Flat | Ready | 412 sqft | AED 630 000 | 1 528 |
| 26 Aug 2026 | Studio Flat | Ready | 426 sqft | AED 660 000 | 1 550 |
| 24 Aug 2026 | Studio Flat | Ready | 389 sqft | AED 693 000 | 1 780 |
| 17 Aug 2026 | Studio Flat | Ready | 380 sqft | AED 650 000 | 1 709 |
| 5 Aug 2026 | Studio Flat | Ready | 413 sqft | AED 687 500 | 1 665 |
| 24 Jul 2026 | 1 B/R Flat | Ready | 837 sqft | AED 1 152 000 | 1 377 |
| 20 Jul 2026 | Studio Flat | Ready | 445 sqft | AED 620 000 | 1 392 |
| 7 Jul 2026 | Studio Flat | Ready | 428 sqft | AED 709 000 | 1 657 |
| 20 May 2026 | Studio Flat | Ready | 412 sqft | AED 680 000 | 1 652 |
| 7 Apr 2026 | 1 B/R Flat | Ready | 755 sqft | AED 1 152 000 | 1 526 |
| 9 Mar 2026 | Studio Flat | Ready | 418 sqft | AED 730 000 | 1 748 |
| 19 Feb 2026 | Studio Flat | Ready | 421 sqft | AED 471 000 | 1 119 |
| 12 Feb 2026 | Studio Flat | Ready | 461 sqft | AED 670 000 | 1 454 |
| 5 Feb 2026 | Studio Flat | Ready | 380 sqft | AED 698 000 | 1 835 |
| 29 Jan 2026 | 1 B/R Flat | Ready | 794 sqft | AED 1 125 000 | 1 416 |
| 15 Jan 2026 | Studio Flat | Ready | 399 sqft | AED 675 000 | 1 691 |
| 25 Dec 2025 | Studio Flat | Ready | 431 sqft | AED 650 000 | 1 509 |
| 17 Dec 2025 | Studio Flat | Ready | 419 sqft | AED 700 000 | 1 672 |
| 15 Dec 2025 | Studio Flat | Ready | 431 sqft | AED 670 000 | 1 556 |
| 10 Dec 2025 | Studio Flat | Ready | 422 sqft | AED 685 000 | 1 625 |
| 10 Dec 2025 | Studio Flat | Ready | 424 sqft | AED 685 000 | 1 616 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Prime Residency 3: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 18 | AED 684k | 1 555 | AED 13.62M |
| 2025 | 93 | AED 650k | 1 528 | AED 65.19M |
| 2024 | 94 | AED 570k | 1 297 | AED 54.22M |
| 2023 | 38 | AED 495k | 1 090 | AED 18.60M |
| 2022 | 221 | AED 461k | 1 050 | AED 111.12M |
| 2021 | 45 | AED 442k | 1 075 | AED 21.13M |
| 2017 | 1 | — | — | AED 14.53M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Dec 2025 | 6 | AED 685k | 1 586 | 1 520 – 1 623 |
| Nov 2025 | 1 | — | — | — |
| Oct 2025 | 2 | — | — | — |
| Sep 2025 | 4 | — | — | — |
| Aug 2025 | 3 | — | — | — |
| Jul 2025 | 7 | AED 650k | 1 552 | 1 534 – 1 631 |
| Jun 2025 | 7 | AED 650k | 1 560 | 1 318 – 1 609 |
| May 2025 | 9 | AED 640k | 1 549 | 1 446 – 1 565 |
| Apr 2025 | 10 | AED 655k | 1 422 | 1 260 – 1 596 |
| Mar 2025 | 14 | AED 650k | 1 544 | 1 481 – 1 590 |
| Feb 2025 | 17 | AED 630k | 1 462 | 1 430 – 1 553 |
| Jan 2025 | 13 | AED 610k | 1 457 | 1 268 – 1 518 |
| Dec 2024 | 11 | AED 570k | 1 306 | 1 111 – 1 357 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Al Furjan
Questions about Prime Residency 3
Who is the developer of Prime Residency 3?
The Dubai Land Department project registry lists Prescott Real Estate Development L.L.C as the developer of Prime Residency 3.
Is Prime Residency 3 completed?
The DLD registry status of Prime Residency 3 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 6 Dec 2024 — a registry date, not a handover promise.
How many homes are in Prime Residency 3?
The DLD registry records 292 units in Prime Residency 3.
What is the price per square foot in Prime Residency 3?
Over the last 12 complete months the median registered sale in Prime Residency 3 was AED 685k, or AED 1 556 per sqft, from 25 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Prime Residency 3?
The escrow agent recorded by DLD for Prime Residency 3 is Mashreq Bank Psc.
Where is Prime Residency 3?
Prime Residency 3 is in the Al Furjan community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗